<strong>FY18</strong> ANNUAL REPORT
B&F mission<br />
we make blue go<br />
EXECUTIVE DIRECTOR’S MESSAGE<br />
01<br />
Mission & Vision 02<br />
Executive Director’s Message 02<br />
B&F vision<br />
To ensure our university<br />
community has the environment<br />
and resources necessary to<br />
challenge the present, enrich<br />
the future and change the world.<br />
<strong>LTP</strong> makes blue go. As an integral<br />
part of Facilities and Operations,<br />
<strong>LTP</strong> provides a variety of<br />
logistics, transportation and<br />
parking options in support of the<br />
University’s primary mission of<br />
teaching, research, patient care<br />
and community service.<br />
I am very pleased to share with you <strong>LTP</strong>’s <strong>FY18</strong> <strong>Annual</strong> <strong>Report</strong>.<br />
At the start of FY17, Facilities & Operations announced an<br />
organizational transformation. With this transformation, we<br />
welcomed Waste Management, Material Services and Moving<br />
& Trucking to our services and formally became “Logistics,<br />
Transportation & Parking”. Our business office and IT functions<br />
transitioned to a new Administrative Services unit.<br />
Since the transformation, the <strong>LTP</strong> team has been embracing<br />
collaboration and continually looking for ways to improve service,<br />
operate safely and strive to find a way to “say yes”.<br />
I hope that you enjoy the <strong>FY18</strong> <strong>Annual</strong> <strong>Report</strong> and I thank all members<br />
of <strong>LTP</strong> for their hard work and dedication throughout the year.<br />
Steve Dolen<br />
02<br />
03<br />
04<br />
Logistics 06<br />
Transit 10<br />
Alternative Transportation 14<br />
Waste Management 16<br />
Fleet 18<br />
Garage 20<br />
Parking 22<br />
05<br />
Financials 24<br />
06<br />
Project Highlights 25<br />
2 ltp.umich.edu ltp.umich.edu<br />
3
LOGISTICS<br />
Logistics Guiding Team<br />
In <strong>FY18</strong>, the Logistics Guiding Team continued its charge with evaluating<br />
material management functions for Maintenance Regions. The team<br />
identified several actions to improve the synchronization of materials and<br />
maintenance, including:<br />
• Continue the Inventory Rationalization effort of partnering with<br />
the five original Facilities Maintenance (FM) region warehouses to<br />
re-evaluate the right parts and the right quantities to have on hand.<br />
• Establish mechanical room audits.<br />
• Potential synchronization of materials with scheduling.<br />
Inventory Implementation Projects<br />
Continuing the optimization of our supply chain, the Utilities Inventory<br />
Project and Key Office Projects continued in <strong>FY18</strong>. Guided by the<br />
Material Service Unit staff, the team has organized, researched and<br />
identified parts for the Key Office and all six Utilities shops. The Key<br />
Office and all six Utilities shops are fully up and running: High Voltage,<br />
Power and Lighting, Tunnels, Water, Boilers, and Central Power Plant.<br />
To date, the team has documented over 7,700 part numbers and addded<br />
over 239,000 pieces into inventory.<br />
Expediter Process Improvements<br />
The Expediters applied for and were awarded an ERGO Grant from<br />
MHealthy. With this grant, they were able to acquire new drywall carts,<br />
2-wheel dollies that convert to 4-wheel carts, portable dock plates, which<br />
assist when the dock is higher than the lift gate and AirHawk seat cushions<br />
for the big trucks, to take some of the jarring associated with the condition<br />
of the roads. These tools have made a big difference in the ability to get<br />
work done safely. This is the second grant they have been awarded to<br />
improve their safety and health at work.<br />
With the new calendar year, the Expediters have taken over the delivery of<br />
filters to each unit on the NCRC campus. This was previously contracted<br />
out to the filter supplier. Several of the staff have become familiar with<br />
the buildings and are learning the location for each unit. The packing<br />
slips are emailed to us and they contain the building and unit number for<br />
delivery. These same employees attended the GIS training provided by<br />
the University. With this and a filter file, supplied by the NCRC, they are<br />
able to locate the room numbers for the units, to assist with the delivery.<br />
By utilizing University Staff, this process transferred seamlessly, due to<br />
preparation and collaboration with the dock personnel at NCRC.<br />
Warehouse Statistics by Dollar Amount,<br />
Number of Transactions, Number of Items Purchased<br />
Warehouse<br />
Part<br />
Transactions<br />
Warehouse<br />
Parts Released<br />
Warehouse<br />
Parts Value<br />
Material Spend<br />
<strong>FY18</strong> FY17 FY16<br />
6,522 5,965 3,790<br />
94,580 109,448 60,831<br />
$ 828,601.74 $ 688,327.36 $ 254,022.97<br />
<strong>FY18</strong> FY17 FY16<br />
Orders 15,347 11,711 10,359<br />
Number of Expediter Trips<br />
<strong>FY18</strong> FY17 FY16<br />
July 2,209 1,811 1,434<br />
August 1,878 2,090 1,844<br />
September 1,577 1,654 1,668<br />
October 1,253 1,352 2,123<br />
November 2,121 1,437 1,290<br />
December 2,323 1,163 1,434<br />
January 2,557 1,851 1,426<br />
February 1,242 2,000 1,418<br />
Asset Recovery for Obsolete and Excess MRO Materials<br />
Lines 34,933 26,993 21,028<br />
March 1,576 1,990 1,918<br />
In <strong>FY18</strong>, the Logistics team partnered with customers continued its efforts<br />
to realize the potential value of Maintenance, Repairs, and Operations<br />
(MRO) supplies inventories that are located across the<br />
campus. Over 9,000 MRO items (more than 8,000 lbs.) were identified<br />
and provided to strategic suppliers and an asset recovery supplier for<br />
buy-back credits and third party sales to realize potential revenue from<br />
excess and obsolete inventory.<br />
Average Lines<br />
per Order<br />
2.3 2.3 2.0<br />
Dollar Spend $8,618,657 $8,431,190 $11,437,687<br />
April 1,056 943 1,887<br />
May 1,162 1,552 1,250<br />
June 1,424 1,740 2,009<br />
4 ltp.umich.edu ltp.umich.edu<br />
5
Moving & Trucking, Work Completed by Work Code<br />
Work<br />
Code<br />
C228<br />
M812<br />
M377<br />
Description<br />
of Work<br />
Scaffolding<br />
25ft and Over<br />
Assist/move<br />
Aerial<br />
Moving Barrels<br />
for HVAC<br />
<strong>FY18</strong> FY17 FY16<br />
$16,933.03 $13,275.28 $3,731.66<br />
$32,992.29 $13,810.81 $14,210.45<br />
$6,529.63 $18,421.23 $14,843.91<br />
C158 Office Systems $93,651.27 $46,475.85 $48,731.56<br />
Moving & Trucking<br />
In <strong>FY18</strong>, Moving and Trucking (M&T) worked on continuous<br />
improvement activities developed through employee<br />
engagement, including the development of a new vehicle and<br />
inventory checklist and an electronic overtime log for tracking<br />
department overtime which provides cloud-based access of the<br />
log to employees.<br />
Departmental performance data was migrated to a Dashboard<br />
application for interactive display of performance in real time.<br />
Additionally, M&T applied for and was awarded an ERGO Grant<br />
from MHealthy for the purchase of an Electric Chain Fall and<br />
Power Stair Climbing Truck. These purchases will help M&T<br />
move and deliver heavy materials needed to complete the<br />
jobs requested with reduced back and shoulder muscle strain<br />
on employees.<br />
M824 Rigging $142,746.08 $127,617.35 $87,494.61<br />
C200 Scaffolding $159,330.26 $127,328.87 $107,330.49<br />
C992<br />
Special Event<br />
Labor Set up<br />
$90,059.20 $124,792.76 $118,188.84<br />
6 ltp.umich.edu ltp.umich.edu<br />
7
TRANSIT<br />
<strong>LTP</strong> continued its focus on safety, service, and technology during <strong>FY18</strong>.<br />
This continued focus has led to a 23% decrease in reported incidents and<br />
collisions since FY16. During that same time span, ridership on our system<br />
increased by 11% between FY16 and <strong>FY18</strong>.<br />
The department had several notable achievements and initiatives during<br />
the fiscal year:<br />
7.92 M<br />
UM Campus<br />
Bus Ridership<br />
8M<br />
1<br />
2<br />
3<br />
Ridership throughout the system increased substantially.<br />
Overall ridership topped 7.9 Million riders.<br />
The SafeRide program transported over 20,000 members<br />
of the U-M Community.<br />
A new route, the Crisler Express, was added in September 2017.<br />
This route serves as a direct link from the Medical campus to<br />
the commuter parking lots on South Campus in the afternoon,<br />
increasing staffs’ ability to access parking and easing parking<br />
concerns on the Medical campus.<br />
FY16 FY17 <strong>FY18</strong><br />
Passengers<br />
7M<br />
2.65 M<br />
MRide<br />
Ridership<br />
3M<br />
4<br />
5<br />
6<br />
Our Operator Training Program overhaul continued through<br />
<strong>FY18</strong>. New trainers were developed and the training program<br />
is being developed with input from our staff and best practices<br />
from transit training programs from around the country.<br />
Transit Services continued to pursue further integration with<br />
the DoubleMap technologies and take advantage of the ADA<br />
announcements, reporting and passenger counting features<br />
of the system, in an effort to reduce the need for drivers to<br />
complete these tasks so they can focus on the safe operation<br />
of their vehicles.<br />
Several Transit Coach Operator positions were added during<br />
<strong>FY18</strong>, increasing the number of permanent staff to 86.<br />
<strong>Report</strong>ed<br />
Accidents/Incidents<br />
7<br />
<strong>FY18</strong> FY17 FY16<br />
156 161 178<br />
Paratransit continued to be a highly used service during<br />
<strong>FY18</strong>. Ridership remained mostly steady, with a slight overall<br />
decrease in ridership. Costs per trip rose ~12% for the same<br />
period. The addition of the Paratransit Coordinator continues<br />
to enhance the service and make it easier to access for our<br />
riders by creating a person who is responsible for coordinating<br />
all of their transportation services.<br />
in our core value<br />
6.58 M<br />
AAATA<br />
Ridership<br />
FY16 FY17 <strong>FY18</strong><br />
in our core value<br />
Passengers<br />
1M<br />
8 ltp.umich.edu ltp.umich.edu<br />
9
TRANSIT RIDERSHIP<br />
All Routes<br />
<strong>FY18</strong> FY17 FY16<br />
Bio-Research Shuttle 1187 874 704<br />
<strong>FY18</strong> FY17 FY16<br />
Bio-Research Shuttle 2,308 2,697 2,481<br />
TRANSIT REVENUE HOURS<br />
All Routes<br />
Botanical Gardens 1,081 1,763 638<br />
Botanical Gardens 178 209 56<br />
Bursley-Baits 2,557,429 2,407,707 2,281,070<br />
Bursley-Baits 21,617 18,925 21,015<br />
Charter 82,283 99,252 105,173<br />
Charter 5,274 6,157 4,769<br />
Commuter 1,980,944 1,891,245 1,742,583<br />
Commuter 33,196 30,812 31,132<br />
Crisler Express 22,195<br />
Crisler Express 1,442<br />
Diag to Diag 219,404 202,923 192,640<br />
Diag to Diag 3,240 3,217 1,956<br />
Football 8,808 4,355 4,668<br />
Football 148 140 215<br />
Med Express 621,198 547,081 510,384<br />
Med Express 11,506 11,280 10,458<br />
Safe Ride 20,510 13,348 9,789<br />
Safe Ride 5,449 4,028 2,537<br />
North Campus<br />
Northwood 25,646 24,935 25,056<br />
Northwood 1,434,706 1,385,457 1,341,290<br />
Northwood Express 3,915 3,854 2,894<br />
Northwood Express 290,475 302,823 154,115<br />
Oxford 1,165 892 2,188<br />
Oxford 33,350 28,038 146,593<br />
Oxford Shuttle 1,521 1,304 2,234<br />
Oxford Shuttle 33,689 46,326 49,194<br />
Paratransit Directly Operated 3,201 3,304 2,791<br />
Paratransit Directly Operated 3,048 3,850 4,098<br />
Paratransit Contracted $12.95 $11.55 $11.35<br />
Paratransit Contracted 7,797 7,885 7,200<br />
Wall Street - NIB 9,042 8,908 8,839<br />
Wall Street - NIB 254,835 220,821 197,389<br />
Night Owl 1,021<br />
Night Owl 6,119<br />
North-East Shuttle 20,998 18,910 19,676<br />
North-East Shuttle 331,909 283,706 257,630<br />
Wall Street Express 2,880 2,613 2,716<br />
Wall Street Express 20,430 23,416 17,959<br />
TOTAL 152,726 142,185 142,034<br />
TOTAL 7,915,389 7,464,752 7,028,532<br />
10 ltp.umich.edu ltp.umich.edu<br />
11
Alternative Transportation<br />
<strong>LTP</strong> continues to promote transportation options for university employees<br />
and students. The <strong>LTP</strong> website features a commute calculator enabling<br />
members of the university community to calculate their commuting costs<br />
and potential savings<br />
The vanpool program continues to support roughly 100 vanpools. The<br />
contract for the program was re-negotiated in <strong>FY18</strong>, continuing the<br />
partership with AAATA and adding Enterprise as the service provider.<br />
ArborBike bike sharing system suspended operations after the fall season<br />
in <strong>FY18</strong>. A new bike share vendor will be hired to operate a system in early<br />
FY19. Bike parking areas continue to be well-utilized around campus.<br />
Alternative Transportation Program Numbers<br />
Registered<br />
Carpools<br />
Registered Carpool<br />
Members<br />
<strong>FY18</strong> FY17 FY16<br />
15 25 20<br />
30 58 48<br />
Vanpools 100 99 101<br />
Vanpoool<br />
Passengers<br />
595 588 596<br />
Zipcars 34 39 39<br />
Zipcar Reserving<br />
Members<br />
1,200 976 1,092<br />
GM Car Share<br />
vehicles<br />
14 14 21<br />
Bike Racks<br />
on Campus<br />
4,417 4,381 4,381<br />
12 ltp.umich.edu ltp.umich.edu<br />
13
Waste Management<br />
In <strong>FY18</strong> Waste Management Services (WMS) replaced three front load<br />
refuse trucks and also purchased a dedicated truck for food compost<br />
collections. It is projected that WMS will collect close to 1,000 tons of<br />
food compost annually.<br />
Beginning in FY19, WMS will use a new software program for billing and<br />
routing. The system was piloted this FY and will replace the current<br />
manually loaded system used for tracking collections.<br />
This software system allows our drivers to upload collections directly into<br />
the database in real time while on route. The software is also set up to<br />
capture frequently used metrics that greatly simplify the ability to obtain<br />
key reporting data for both WMS and OCS. The billing process is also<br />
improved, with most functions going from manual to automated entries.<br />
Collections<br />
Municipal Solid Waste<br />
(MSW)<br />
<strong>FY18</strong> FY17 FY16<br />
5,310 Tons 5,295 Tons 5,274 Tons<br />
Roll Off MSW 1,444 Tons 1,276 Tons 1,265 Tons<br />
Roll Off Construction<br />
& Demolition (C&D)<br />
412 Tons 706 Tons 428 Tons<br />
Scrap Wood 1,372 CYs 1,665 CYs 1,318 CYs<br />
Single Stream<br />
Recycling<br />
2,709 Tons 3,021 Tons 2,454 Tons<br />
Compost 859 Tons 624 Tons 461 Tons<br />
Scrap Metal 468 Tons 364 Tons 526 Tons<br />
Polystyrene* 1,855 Bags 1,671 Bags 1,510 Bags<br />
14 ltp.umich.edu ltp.umich.edu<br />
15
Fleet<br />
In <strong>FY18</strong> Fleet Services completed installation of a GPS system in all<br />
University vehicles. Fleet Services also updated the specification document<br />
used to spec out vehicles for customers. The new form streamlines the<br />
process and makes sending out bids for vehicles much easier for customers<br />
and vendors.<br />
The GPS system allows Fleet services to send detailed reports regarding<br />
vehicle utilization to customers on a monthly basis. Fleet Services is using<br />
the data collected by the GPS system to help determine where there are<br />
opportunities to reduce fleet sizes and to help determine what types of<br />
vehicles are needed to meet customer needs when their current vehicles<br />
are up for replacement.<br />
Fleet Composition<br />
<strong>FY18</strong> FY17 FY16<br />
Auto<br />
Unleaded 70 43 40<br />
E85 398 394 383<br />
Hybrid 29 37 54<br />
Subtotal 497 474 477<br />
Trucks<br />
Unleaded 265 247 225<br />
E85 225 227 239<br />
Biodiesel 31 28 28<br />
Electric 3 5 6<br />
Subtotal 524 507 498<br />
Buses<br />
Unleaded 2 2 2<br />
Fuel Dispensed (Gallons)<br />
<strong>FY18</strong> FY17 FY16<br />
Unleaded 370,437 380,922 360,899<br />
Biodiesel 376,181 369,782 363,540<br />
Ethanol 45,212 55,815 64,517<br />
Motor Vehicle Record (MVR) Checks<br />
<strong>FY18</strong> FY17 FY16<br />
Checks 7,848 7,821 8,568<br />
Approved 7,738 7,690 8,147<br />
Incomplete 99 107 112<br />
Ineligible 11 23 309<br />
Biodiesel 21 25 28<br />
Hybrid 30 25 25<br />
Subtotal 53 52 55<br />
Daily Rentals<br />
<strong>FY18</strong> FY17 FY16<br />
TOTAL 1,074 1,033 1,030<br />
Daily Rentals 5,703 5,111 4,050<br />
16 ltp.umich.edu ltp.umich.edu<br />
17
Garage<br />
Garage Services has had two vehicle lifts repaired and has had an<br />
additional one installed in the garage. The additional above ground<br />
automotive lift provides fleet mechanics an extra lift to use when working<br />
on heavy duty vans and trucks. Previously, there was only one lift with the<br />
capacity to safely lift those vehicles and so the new lift doubled working<br />
capacity for those types of vehicles. Two bus lifts had become unsafe to<br />
operate due to age and were repaired. The bus garage now has all four of<br />
their lifts in operation.<br />
They have also implemented an electronic down board for the transit<br />
operations so that they now have a real time document to see the status<br />
of the transit fleet while it is in the garage for repairs. A mechanic has been<br />
promoted to Sr. Supervisor to fill a vacancy due to retirement. Two changes<br />
to the transit coach procurement were made, our new buses are coming<br />
from the factory with their graphics installed on them and they also will<br />
have disc brakes.<br />
Work Orders by Vehicle Type<br />
<strong>FY18</strong> FY17 FY16<br />
Other 88 80 107<br />
Auto 1,925 1,813 1,724<br />
Rental 684 682 718<br />
Truck 1,777 1,582 1,475<br />
Transit Fleet 888 865 1,130<br />
TOTAL 5,362 5,022 5,154<br />
Work Orders by Repair Type<br />
<strong>FY18</strong> FY17 FY16<br />
Breakdowns 345 233 238<br />
Body Shop 126 160 156<br />
Modifications 150 195 147<br />
PM 1,707 1,653 1,806<br />
Repair 3,551 3,191 3,560<br />
TOTAL 5,879 5,432 5,907<br />
Labor Hours by Vehicle Group<br />
<strong>FY18</strong> FY17 FY16<br />
Other 272 235 394<br />
Auto 4,318 4,292 4,209<br />
Rental 1,600 1,656 1,716<br />
Truck 3,794 3,913 4,075<br />
Transit Fleet 9,001 8,371 8,803<br />
TOTAL 18,985 18,467 19,197<br />
Heavy Equipment Work Orders by Repair Type<br />
<strong>FY18</strong> FY17 FY16<br />
PM 238 266 334<br />
Other 932 835 721<br />
TOTAL 1,170 1,101 1,055<br />
18 ltp.umich.edu ltp.umich.edu<br />
19
Parking<br />
In <strong>FY18</strong>, parking demand across the University continued to grow. <strong>LTP</strong><br />
and Michigan Medicine formed a Parking and Transportation Advisory<br />
Committee to address the growing patient, visitor, and staff parking<br />
needs on the Medical Campus. Parking and Transportation solutions<br />
in <strong>FY18</strong> included:<br />
1<br />
2<br />
3<br />
4<br />
5<br />
Expansion of NC53 (Orange).<br />
Expansion of the Green Road Park & Ride (free commuter parking).<br />
Crisler Express Bus service (Michigan Medicine transportation option<br />
from the Medical Campus to SC7) - service started Fall 2018 and has<br />
continued through <strong>FY18</strong>.<br />
East Ann Arbor Shuttle Service (cab service from East Ann Arbor to<br />
the Medical Campus with return service).<br />
Late Night Pilot Program (cab service from the Medical Campus to<br />
North Campus parking lots from 10:30 p.m. - 4 a.m.).<br />
Overall, the goal of the above efforts for parking and transportation<br />
solutions are to ease the parking crunch and improve customer<br />
satisfaction. The Regents also approved a second Wall Street Structure.<br />
Parking Access Revenue Control Systems (PARCS) was installed at the<br />
Palmer Street Structure in January 2018. The visitor parking area is now<br />
an automated parking facility. New PARCS equipment will be installed<br />
through several patient and visitors sections at Michigan Medicine in<br />
FY19-20.<br />
P1 Cancer Center and P5 CVC are scheduled to be automated facilities<br />
while P2 Taubman and P4 Mott are scheduled to be hybrid facilities with<br />
both parking attendants and automated equipment. For <strong>FY18</strong> revenue,<br />
transaction numbers appeared to be lower at the P4 Mott and P5 CVC<br />
facility. This can be attributed to major repair projects that occurred in those<br />
facilities Summer and Fall 2018.<br />
Parking Customer Services, as of February 2018, has all staff positions<br />
within the unit filled. Approval for a one year appointment for a customer<br />
service representative was approved to assist with customer service<br />
interactions. Having the additional staff member to answer the ever<br />
increasing customer calls and emails has been a positive improvement<br />
for the Parking Customer Services office.<br />
Active Parking Permits<br />
Permit Type <strong>FY18</strong> FY17 FY16<br />
Gold 1,803 1,756 1,699<br />
Blue 17,769 17,579 16,609<br />
Yellow 9,113 8,873 8,563<br />
Orange 5,455 4,966 5,068<br />
TOTAL 34,140 33,174 31,939<br />
15<br />
structures<br />
330 acres<br />
~ 100<br />
surface lots<br />
Parking Transactions<br />
Structure <strong>FY18</strong> FY17 FY16<br />
Cancer Center (P1) 116,532 116,035 119,679<br />
Taubman North<br />
(P2)<br />
791,656 789,735 765,580<br />
Mott/Simpson (P4) 237,312 274,487 259,238<br />
CVC (P5) 52,118 63,884 65,608<br />
Sub-Total - Medical<br />
Campus<br />
1,197,618 1,244,141 1,210,105<br />
Fletcher St. 83,311 92,567 91,493<br />
Palmer Dr. 64,996 71,358 68,795<br />
Sub-Total - Central<br />
Campus<br />
148,307 163,925 160,288<br />
TOTAL 1,345,925 1,408,066 1,370,393<br />
20 ltp.umich.edu ltp.umich.edu<br />
21
FINANCIALS<br />
<strong>LTP</strong> Consolidated Financial Results<br />
<strong>FY18</strong> FY17 FY16<br />
Dollars $$<br />
Revenue<br />
Parking Permit Revenue 27,112,652 26,017,912 24,566,164<br />
Medical Campus Patient/Visitor 3,247,893 3,291,905 3,204,429<br />
<strong>LTP</strong> Services 27,004,350 26,364,047 19,977,788<br />
Total Revenue 57,364,895 55,673,864 47,748,381<br />
Expenses<br />
Compensation & Benefits 18,336,809 18,024,556 13,486,602<br />
Services of Others - External 5,087,582 3,382,139 3,467,126<br />
Insurance 1,706,999 1,752,012 1,571,221<br />
Utilities 1,281,903 1,157,713 1,245,184<br />
UM Transportation 5,837,625 5,316,743 4,969,403<br />
Plant Operations, Maint, & Materials 4,743,901 3,964,917 2,474,608<br />
Other Expense 1,483,269 1,135,509 2,033,496<br />
22 ltp.umich.edu ltp.umich.edu<br />
23
PROJECT HIGHLIGHTS<br />
Michigan Medicine Parking & Transportation Solutions<br />
<strong>LTP</strong> has been working closely with Michigan Medicine on a number of<br />
near and longer term solutions to help address parking and transportation<br />
challenges. Some highlights in <strong>FY18</strong> include:<br />
Wall Street West Structure: The University of Michigan’s Board of<br />
Regents approved a 1050-space, $39.5 million parking structure located<br />
between Wall Street and Maiden Lane during its meeting on Thursday,<br />
Dec. 7. Project completion is anticipated at the end of 2020.<br />
Commuter lot enhancements: The East Ann Arbor gravel lot was improved<br />
and now has the capacity for 422 parking spaces. NC53 and Green Road<br />
Commuter lots were also expanded, by approximately 250 and 120<br />
spaces respectively.<br />
Employee Parking Shuttle: To help improve parking capacity and access,<br />
a new direct shuttle service launched in February 2018 for employees<br />
between the East Ann Arbor (EC1) gravel parking lot (375 free parking<br />
spaces for MM employees) and the academic medical center. Service<br />
hours are 5:45AM - 1AM M-F (until Saturday morning) with 5-10 minute<br />
frequency during peak times.<br />
Late Night Transportation (Blue Car): A pilot program launched in<br />
Fall 2017 offering on demand cab service between Taubman and<br />
northeast parking lots. Service hours are 10:30pm - 4am M-F<br />
(until Saturday morning).<br />
Michigan Medicine Parking & Transportation Advisory Committee<br />
(PTAC): Co-chaired by Michigan Medicine and F&O, a new committee<br />
(of approximately 15 employees) was formed to increase employee<br />
engagement in the identification, prioritization and implementation of<br />
actions to improve parking and transportation for Michigan Medicine<br />
employees. A final report is anticipated in Summer 2018.<br />
Connector and Mobility Research<br />
In FY17 (January), the university and partners (City of Ann Arbor, AAATA<br />
and DDA) began discussing refocusing work of the Connector study to<br />
address segments which are most congested and carry the highest volumes<br />
of trips. In <strong>FY18</strong>, the university began to explore less costly options for a<br />
shorter segment connecting north and central campuses. The work is taking<br />
a comprehensive look at the Fuller Road corridor and focusing on a high<br />
capacity, dedicated right-of-way that accommodates current technologies<br />
and can incrementally support future advancements in technology, such as<br />
automated and connected vehicles.<br />
At the request of UMOR and College of Engineering (COE), <strong>LTP</strong> has<br />
participated in an effort with General Motors since FY16 that launched a car<br />
sharing program branded as Maven.<br />
<strong>LTP</strong> has been collaborating with the COE and is operating shuttles on behalf<br />
of RITMO (Reinventing Urban Transportation and mobility), a new on-demand<br />
transportation system developed by COE research. These shuttles may<br />
someday have the potential to support<br />
<strong>LTP</strong> operations, working in conjunction with high-capacity transit routes<br />
on campus.<br />
<strong>LTP</strong> has been working closely with Mcity and U-M Transportation Research<br />
Institute in the exploration of autonomous and connected vehicle technology.<br />
These efforts may one day lead to solutions in mobility other than commuting<br />
in single occupancy vehicles.<br />
Transportation Facility<br />
In FY16, the University decided not to move forward with plans to build a<br />
new transportation operations and maintenance center on North Campus<br />
(originally approved in May 2014). The project had called for a $38.5 million,<br />
100,000-square-foot building to be constructed near Green Road between<br />
Baxter and Hubbard roads, relocating from Kipke Drive on the Stephen M.<br />
Ross Athletic Campus. The proposed center was planned to accommodate<br />
current and future maintenance space needs, including the flexibility to<br />
handle larger, articulated buses.<br />
Due to the cancellation of the project, <strong>LTP</strong> initiated a couple new projects<br />
in <strong>FY18</strong>:<br />
• An interim plan to provide more immediate upgrades for Fleet and<br />
Vehicle Maintenance operations on Ross Athletic Campus, while<br />
retaining all operations at that facility.<br />
• A longer term plan (3-5 years) to relocate Transit and Heavy Equipment<br />
to North Campus, while retaining and renovating spaces for Fleet and<br />
Vehicle Maintenance on Ross Athletic Campus.<br />
Lighting Replacement<br />
<strong>LTP</strong> has continued its plan to upgrade parking lot and structure lighting.<br />
In <strong>FY18</strong>, new LED lighting was installed at the North Entrance parking<br />
structure (P1). The project included installation of a generator for<br />
emergency power, new conduit, wiring and distribution panels. The fixtures<br />
selected offered integrated controls that reduce light output when ambient<br />
light levels are high and during idle periods. In addition to parking bays,<br />
new fixtures were installed on the roof, in stair/elevator towers, the elevator<br />
shaft, and storage and service, electrical and mechanical rooms. An<br />
approximate 70% energy reduction was achieved.<br />
Parking lot lighting improvements also continued in <strong>FY18</strong> with the<br />
installation of LED fixtures at three locations. In addition to specifically<br />
planned locations, parking lot lighting throughout the campus will be<br />
upgraded to LED fixtures in lieu of making repairs to existing lights. Future<br />
planned relighting projects include the NCRC and Catherine structures in<br />
FY2019, and Fletcher and Church structures in 2020.<br />
Bike Share Program<br />
In her fall 2011 Sustainability Address, President Coleman identified the<br />
goal of bringing a modern bike sharing system to campus. To further this<br />
idea, bike sharing was identified as a <strong>LTP</strong> Business and Finance priority<br />
for FY2013. Due to concurrent City and local agency interest, <strong>LTP</strong> has<br />
focused on a collaborative approach to bike sharing since FY2012—working<br />
closely with the City of Ann Arbor, Ann Arbor Area Transportation Authority<br />
(AAATA) and Downtown Development Authority (DDA) to establish a<br />
modern bike sharing system in Ann Arbor. A three-year pilot launched in<br />
fall FY2015, where U-M committed an annual contribution of up to<br />
$200,000 for three years to cover a large percentage of system operating<br />
expenses and assume title sponsorship. The pilot was extended during<br />
FY17. In <strong>FY18</strong>, AAATA assumed management of the Ann Arbor bike share<br />
program. A new vendor will be selected by the end of <strong>FY18</strong> - early FY19<br />
to operate the system.<br />
Parking Automation Project<br />
In FY2015, <strong>LTP</strong> retained a consultant to assist in the development of a<br />
long term plan for introducing greater automation in patient and visitor<br />
structures. The effort emphasized customer experience as a primary focus.<br />
New parking access and revenue control systems (PARCS) were installed<br />
in the Palmer and Fletcher parking structures in early 2018. Palmer visitor<br />
parking is now a fully automated while cashier and self-service equipment<br />
(intended for use after cashier operations end) is available at Fletcher. New<br />
PARCS equipment will be installed in the patient and visitor parking areas<br />
at medical campus parking facilities in <strong>FY18</strong>. P1 (North Entrance) and P5<br />
(Cardiovascular Center) are planned to be automated facilities while P2<br />
(East Medical Center) and P4 (Simpson Circle) are planned to be hybrid<br />
facilities with both cashiers and self-service equipment.<br />
24 ltp.umich.edu ltp.umich.edu<br />
25
<strong>FY18</strong> ANNUAL REPORT