20.11.2018 Views

LTP FY18 Annual Report-2

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>FY18</strong> ANNUAL REPORT


B&F mission<br />

we make blue go<br />

EXECUTIVE DIRECTOR’S MESSAGE<br />

01<br />

Mission & Vision 02<br />

Executive Director’s Message 02<br />

B&F vision<br />

To ensure our university<br />

community has the environment<br />

and resources necessary to<br />

challenge the present, enrich<br />

the future and change the world.<br />

<strong>LTP</strong> makes blue go. As an integral<br />

part of Facilities and Operations,<br />

<strong>LTP</strong> provides a variety of<br />

logistics, transportation and<br />

parking options in support of the<br />

University’s primary mission of<br />

teaching, research, patient care<br />

and community service.<br />

I am very pleased to share with you <strong>LTP</strong>’s <strong>FY18</strong> <strong>Annual</strong> <strong>Report</strong>.<br />

At the start of FY17, Facilities & Operations announced an<br />

organizational transformation. With this transformation, we<br />

welcomed Waste Management, Material Services and Moving<br />

& Trucking to our services and formally became “Logistics,<br />

Transportation & Parking”. Our business office and IT functions<br />

transitioned to a new Administrative Services unit.<br />

Since the transformation, the <strong>LTP</strong> team has been embracing<br />

collaboration and continually looking for ways to improve service,<br />

operate safely and strive to find a way to “say yes”.<br />

I hope that you enjoy the <strong>FY18</strong> <strong>Annual</strong> <strong>Report</strong> and I thank all members<br />

of <strong>LTP</strong> for their hard work and dedication throughout the year.<br />

Steve Dolen<br />

02<br />

03<br />

04<br />

Logistics 06<br />

Transit 10<br />

Alternative Transportation 14<br />

Waste Management 16<br />

Fleet 18<br />

Garage 20<br />

Parking 22<br />

05<br />

Financials 24<br />

06<br />

Project Highlights 25<br />

2 ltp.umich.edu ltp.umich.edu<br />

3


LOGISTICS<br />

Logistics Guiding Team<br />

In <strong>FY18</strong>, the Logistics Guiding Team continued its charge with evaluating<br />

material management functions for Maintenance Regions. The team<br />

identified several actions to improve the synchronization of materials and<br />

maintenance, including:<br />

• Continue the Inventory Rationalization effort of partnering with<br />

the five original Facilities Maintenance (FM) region warehouses to<br />

re-evaluate the right parts and the right quantities to have on hand.<br />

• Establish mechanical room audits.<br />

• Potential synchronization of materials with scheduling.<br />

Inventory Implementation Projects<br />

Continuing the optimization of our supply chain, the Utilities Inventory<br />

Project and Key Office Projects continued in <strong>FY18</strong>. Guided by the<br />

Material Service Unit staff, the team has organized, researched and<br />

identified parts for the Key Office and all six Utilities shops. The Key<br />

Office and all six Utilities shops are fully up and running: High Voltage,<br />

Power and Lighting, Tunnels, Water, Boilers, and Central Power Plant.<br />

To date, the team has documented over 7,700 part numbers and addded<br />

over 239,000 pieces into inventory.<br />

Expediter Process Improvements<br />

The Expediters applied for and were awarded an ERGO Grant from<br />

MHealthy. With this grant, they were able to acquire new drywall carts,<br />

2-wheel dollies that convert to 4-wheel carts, portable dock plates, which<br />

assist when the dock is higher than the lift gate and AirHawk seat cushions<br />

for the big trucks, to take some of the jarring associated with the condition<br />

of the roads. These tools have made a big difference in the ability to get<br />

work done safely. This is the second grant they have been awarded to<br />

improve their safety and health at work.<br />

With the new calendar year, the Expediters have taken over the delivery of<br />

filters to each unit on the NCRC campus. This was previously contracted<br />

out to the filter supplier. Several of the staff have become familiar with<br />

the buildings and are learning the location for each unit. The packing<br />

slips are emailed to us and they contain the building and unit number for<br />

delivery. These same employees attended the GIS training provided by<br />

the University. With this and a filter file, supplied by the NCRC, they are<br />

able to locate the room numbers for the units, to assist with the delivery.<br />

By utilizing University Staff, this process transferred seamlessly, due to<br />

preparation and collaboration with the dock personnel at NCRC.<br />

Warehouse Statistics by Dollar Amount,<br />

Number of Transactions, Number of Items Purchased<br />

Warehouse<br />

Part<br />

Transactions<br />

Warehouse<br />

Parts Released<br />

Warehouse<br />

Parts Value<br />

Material Spend<br />

<strong>FY18</strong> FY17 FY16<br />

6,522 5,965 3,790<br />

94,580 109,448 60,831<br />

$ 828,601.74 $ 688,327.36 $ 254,022.97<br />

<strong>FY18</strong> FY17 FY16<br />

Orders 15,347 11,711 10,359<br />

Number of Expediter Trips<br />

<strong>FY18</strong> FY17 FY16<br />

July 2,209 1,811 1,434<br />

August 1,878 2,090 1,844<br />

September 1,577 1,654 1,668<br />

October 1,253 1,352 2,123<br />

November 2,121 1,437 1,290<br />

December 2,323 1,163 1,434<br />

January 2,557 1,851 1,426<br />

February 1,242 2,000 1,418<br />

Asset Recovery for Obsolete and Excess MRO Materials<br />

Lines 34,933 26,993 21,028<br />

March 1,576 1,990 1,918<br />

In <strong>FY18</strong>, the Logistics team partnered with customers continued its efforts<br />

to realize the potential value of Maintenance, Repairs, and Operations<br />

(MRO) supplies inventories that are located across the<br />

campus. Over 9,000 MRO items (more than 8,000 lbs.) were identified<br />

and provided to strategic suppliers and an asset recovery supplier for<br />

buy-back credits and third party sales to realize potential revenue from<br />

excess and obsolete inventory.<br />

Average Lines<br />

per Order<br />

2.3 2.3 2.0<br />

Dollar Spend $8,618,657 $8,431,190 $11,437,687<br />

April 1,056 943 1,887<br />

May 1,162 1,552 1,250<br />

June 1,424 1,740 2,009<br />

4 ltp.umich.edu ltp.umich.edu<br />

5


Moving & Trucking, Work Completed by Work Code<br />

Work<br />

Code<br />

C228<br />

M812<br />

M377<br />

Description<br />

of Work<br />

Scaffolding<br />

25ft and Over<br />

Assist/move<br />

Aerial<br />

Moving Barrels<br />

for HVAC<br />

<strong>FY18</strong> FY17 FY16<br />

$16,933.03 $13,275.28 $3,731.66<br />

$32,992.29 $13,810.81 $14,210.45<br />

$6,529.63 $18,421.23 $14,843.91<br />

C158 Office Systems $93,651.27 $46,475.85 $48,731.56<br />

Moving & Trucking<br />

In <strong>FY18</strong>, Moving and Trucking (M&T) worked on continuous<br />

improvement activities developed through employee<br />

engagement, including the development of a new vehicle and<br />

inventory checklist and an electronic overtime log for tracking<br />

department overtime which provides cloud-based access of the<br />

log to employees.<br />

Departmental performance data was migrated to a Dashboard<br />

application for interactive display of performance in real time.<br />

Additionally, M&T applied for and was awarded an ERGO Grant<br />

from MHealthy for the purchase of an Electric Chain Fall and<br />

Power Stair Climbing Truck. These purchases will help M&T<br />

move and deliver heavy materials needed to complete the<br />

jobs requested with reduced back and shoulder muscle strain<br />

on employees.<br />

M824 Rigging $142,746.08 $127,617.35 $87,494.61<br />

C200 Scaffolding $159,330.26 $127,328.87 $107,330.49<br />

C992<br />

Special Event<br />

Labor Set up<br />

$90,059.20 $124,792.76 $118,188.84<br />

6 ltp.umich.edu ltp.umich.edu<br />

7


TRANSIT<br />

<strong>LTP</strong> continued its focus on safety, service, and technology during <strong>FY18</strong>.<br />

This continued focus has led to a 23% decrease in reported incidents and<br />

collisions since FY16. During that same time span, ridership on our system<br />

increased by 11% between FY16 and <strong>FY18</strong>.<br />

The department had several notable achievements and initiatives during<br />

the fiscal year:<br />

7.92 M<br />

UM Campus<br />

Bus Ridership<br />

8M<br />

1<br />

2<br />

3<br />

Ridership throughout the system increased substantially.<br />

Overall ridership topped 7.9 Million riders.<br />

The SafeRide program transported over 20,000 members<br />

of the U-M Community.<br />

A new route, the Crisler Express, was added in September 2017.<br />

This route serves as a direct link from the Medical campus to<br />

the commuter parking lots on South Campus in the afternoon,<br />

increasing staffs’ ability to access parking and easing parking<br />

concerns on the Medical campus.<br />

FY16 FY17 <strong>FY18</strong><br />

Passengers<br />

7M<br />

2.65 M<br />

MRide<br />

Ridership<br />

3M<br />

4<br />

5<br />

6<br />

Our Operator Training Program overhaul continued through<br />

<strong>FY18</strong>. New trainers were developed and the training program<br />

is being developed with input from our staff and best practices<br />

from transit training programs from around the country.<br />

Transit Services continued to pursue further integration with<br />

the DoubleMap technologies and take advantage of the ADA<br />

announcements, reporting and passenger counting features<br />

of the system, in an effort to reduce the need for drivers to<br />

complete these tasks so they can focus on the safe operation<br />

of their vehicles.<br />

Several Transit Coach Operator positions were added during<br />

<strong>FY18</strong>, increasing the number of permanent staff to 86.<br />

<strong>Report</strong>ed<br />

Accidents/Incidents<br />

7<br />

<strong>FY18</strong> FY17 FY16<br />

156 161 178<br />

Paratransit continued to be a highly used service during<br />

<strong>FY18</strong>. Ridership remained mostly steady, with a slight overall<br />

decrease in ridership. Costs per trip rose ~12% for the same<br />

period. The addition of the Paratransit Coordinator continues<br />

to enhance the service and make it easier to access for our<br />

riders by creating a person who is responsible for coordinating<br />

all of their transportation services.<br />

in our core value<br />

6.58 M<br />

AAATA<br />

Ridership<br />

FY16 FY17 <strong>FY18</strong><br />

in our core value<br />

Passengers<br />

1M<br />

8 ltp.umich.edu ltp.umich.edu<br />

9


TRANSIT RIDERSHIP<br />

All Routes<br />

<strong>FY18</strong> FY17 FY16<br />

Bio-Research Shuttle 1187 874 704<br />

<strong>FY18</strong> FY17 FY16<br />

Bio-Research Shuttle 2,308 2,697 2,481<br />

TRANSIT REVENUE HOURS<br />

All Routes<br />

Botanical Gardens 1,081 1,763 638<br />

Botanical Gardens 178 209 56<br />

Bursley-Baits 2,557,429 2,407,707 2,281,070<br />

Bursley-Baits 21,617 18,925 21,015<br />

Charter 82,283 99,252 105,173<br />

Charter 5,274 6,157 4,769<br />

Commuter 1,980,944 1,891,245 1,742,583<br />

Commuter 33,196 30,812 31,132<br />

Crisler Express 22,195<br />

Crisler Express 1,442<br />

Diag to Diag 219,404 202,923 192,640<br />

Diag to Diag 3,240 3,217 1,956<br />

Football 8,808 4,355 4,668<br />

Football 148 140 215<br />

Med Express 621,198 547,081 510,384<br />

Med Express 11,506 11,280 10,458<br />

Safe Ride 20,510 13,348 9,789<br />

Safe Ride 5,449 4,028 2,537<br />

North Campus<br />

Northwood 25,646 24,935 25,056<br />

Northwood 1,434,706 1,385,457 1,341,290<br />

Northwood Express 3,915 3,854 2,894<br />

Northwood Express 290,475 302,823 154,115<br />

Oxford 1,165 892 2,188<br />

Oxford 33,350 28,038 146,593<br />

Oxford Shuttle 1,521 1,304 2,234<br />

Oxford Shuttle 33,689 46,326 49,194<br />

Paratransit Directly Operated 3,201 3,304 2,791<br />

Paratransit Directly Operated 3,048 3,850 4,098<br />

Paratransit Contracted $12.95 $11.55 $11.35<br />

Paratransit Contracted 7,797 7,885 7,200<br />

Wall Street - NIB 9,042 8,908 8,839<br />

Wall Street - NIB 254,835 220,821 197,389<br />

Night Owl 1,021<br />

Night Owl 6,119<br />

North-East Shuttle 20,998 18,910 19,676<br />

North-East Shuttle 331,909 283,706 257,630<br />

Wall Street Express 2,880 2,613 2,716<br />

Wall Street Express 20,430 23,416 17,959<br />

TOTAL 152,726 142,185 142,034<br />

TOTAL 7,915,389 7,464,752 7,028,532<br />

10 ltp.umich.edu ltp.umich.edu<br />

11


Alternative Transportation<br />

<strong>LTP</strong> continues to promote transportation options for university employees<br />

and students. The <strong>LTP</strong> website features a commute calculator enabling<br />

members of the university community to calculate their commuting costs<br />

and potential savings<br />

The vanpool program continues to support roughly 100 vanpools. The<br />

contract for the program was re-negotiated in <strong>FY18</strong>, continuing the<br />

partership with AAATA and adding Enterprise as the service provider.<br />

ArborBike bike sharing system suspended operations after the fall season<br />

in <strong>FY18</strong>. A new bike share vendor will be hired to operate a system in early<br />

FY19. Bike parking areas continue to be well-utilized around campus.<br />

Alternative Transportation Program Numbers<br />

Registered<br />

Carpools<br />

Registered Carpool<br />

Members<br />

<strong>FY18</strong> FY17 FY16<br />

15 25 20<br />

30 58 48<br />

Vanpools 100 99 101<br />

Vanpoool<br />

Passengers<br />

595 588 596<br />

Zipcars 34 39 39<br />

Zipcar Reserving<br />

Members<br />

1,200 976 1,092<br />

GM Car Share<br />

vehicles<br />

14 14 21<br />

Bike Racks<br />

on Campus<br />

4,417 4,381 4,381<br />

12 ltp.umich.edu ltp.umich.edu<br />

13


Waste Management<br />

In <strong>FY18</strong> Waste Management Services (WMS) replaced three front load<br />

refuse trucks and also purchased a dedicated truck for food compost<br />

collections. It is projected that WMS will collect close to 1,000 tons of<br />

food compost annually.<br />

Beginning in FY19, WMS will use a new software program for billing and<br />

routing. The system was piloted this FY and will replace the current<br />

manually loaded system used for tracking collections.<br />

This software system allows our drivers to upload collections directly into<br />

the database in real time while on route. The software is also set up to<br />

capture frequently used metrics that greatly simplify the ability to obtain<br />

key reporting data for both WMS and OCS. The billing process is also<br />

improved, with most functions going from manual to automated entries.<br />

Collections<br />

Municipal Solid Waste<br />

(MSW)<br />

<strong>FY18</strong> FY17 FY16<br />

5,310 Tons 5,295 Tons 5,274 Tons<br />

Roll Off MSW 1,444 Tons 1,276 Tons 1,265 Tons<br />

Roll Off Construction<br />

& Demolition (C&D)<br />

412 Tons 706 Tons 428 Tons<br />

Scrap Wood 1,372 CYs 1,665 CYs 1,318 CYs<br />

Single Stream<br />

Recycling<br />

2,709 Tons 3,021 Tons 2,454 Tons<br />

Compost 859 Tons 624 Tons 461 Tons<br />

Scrap Metal 468 Tons 364 Tons 526 Tons<br />

Polystyrene* 1,855 Bags 1,671 Bags 1,510 Bags<br />

14 ltp.umich.edu ltp.umich.edu<br />

15


Fleet<br />

In <strong>FY18</strong> Fleet Services completed installation of a GPS system in all<br />

University vehicles. Fleet Services also updated the specification document<br />

used to spec out vehicles for customers. The new form streamlines the<br />

process and makes sending out bids for vehicles much easier for customers<br />

and vendors.<br />

The GPS system allows Fleet services to send detailed reports regarding<br />

vehicle utilization to customers on a monthly basis. Fleet Services is using<br />

the data collected by the GPS system to help determine where there are<br />

opportunities to reduce fleet sizes and to help determine what types of<br />

vehicles are needed to meet customer needs when their current vehicles<br />

are up for replacement.<br />

Fleet Composition<br />

<strong>FY18</strong> FY17 FY16<br />

Auto<br />

Unleaded 70 43 40<br />

E85 398 394 383<br />

Hybrid 29 37 54<br />

Subtotal 497 474 477<br />

Trucks<br />

Unleaded 265 247 225<br />

E85 225 227 239<br />

Biodiesel 31 28 28<br />

Electric 3 5 6<br />

Subtotal 524 507 498<br />

Buses<br />

Unleaded 2 2 2<br />

Fuel Dispensed (Gallons)<br />

<strong>FY18</strong> FY17 FY16<br />

Unleaded 370,437 380,922 360,899<br />

Biodiesel 376,181 369,782 363,540<br />

Ethanol 45,212 55,815 64,517<br />

Motor Vehicle Record (MVR) Checks<br />

<strong>FY18</strong> FY17 FY16<br />

Checks 7,848 7,821 8,568<br />

Approved 7,738 7,690 8,147<br />

Incomplete 99 107 112<br />

Ineligible 11 23 309<br />

Biodiesel 21 25 28<br />

Hybrid 30 25 25<br />

Subtotal 53 52 55<br />

Daily Rentals<br />

<strong>FY18</strong> FY17 FY16<br />

TOTAL 1,074 1,033 1,030<br />

Daily Rentals 5,703 5,111 4,050<br />

16 ltp.umich.edu ltp.umich.edu<br />

17


Garage<br />

Garage Services has had two vehicle lifts repaired and has had an<br />

additional one installed in the garage. The additional above ground<br />

automotive lift provides fleet mechanics an extra lift to use when working<br />

on heavy duty vans and trucks. Previously, there was only one lift with the<br />

capacity to safely lift those vehicles and so the new lift doubled working<br />

capacity for those types of vehicles. Two bus lifts had become unsafe to<br />

operate due to age and were repaired. The bus garage now has all four of<br />

their lifts in operation.<br />

They have also implemented an electronic down board for the transit<br />

operations so that they now have a real time document to see the status<br />

of the transit fleet while it is in the garage for repairs. A mechanic has been<br />

promoted to Sr. Supervisor to fill a vacancy due to retirement. Two changes<br />

to the transit coach procurement were made, our new buses are coming<br />

from the factory with their graphics installed on them and they also will<br />

have disc brakes.<br />

Work Orders by Vehicle Type<br />

<strong>FY18</strong> FY17 FY16<br />

Other 88 80 107<br />

Auto 1,925 1,813 1,724<br />

Rental 684 682 718<br />

Truck 1,777 1,582 1,475<br />

Transit Fleet 888 865 1,130<br />

TOTAL 5,362 5,022 5,154<br />

Work Orders by Repair Type<br />

<strong>FY18</strong> FY17 FY16<br />

Breakdowns 345 233 238<br />

Body Shop 126 160 156<br />

Modifications 150 195 147<br />

PM 1,707 1,653 1,806<br />

Repair 3,551 3,191 3,560<br />

TOTAL 5,879 5,432 5,907<br />

Labor Hours by Vehicle Group<br />

<strong>FY18</strong> FY17 FY16<br />

Other 272 235 394<br />

Auto 4,318 4,292 4,209<br />

Rental 1,600 1,656 1,716<br />

Truck 3,794 3,913 4,075<br />

Transit Fleet 9,001 8,371 8,803<br />

TOTAL 18,985 18,467 19,197<br />

Heavy Equipment Work Orders by Repair Type<br />

<strong>FY18</strong> FY17 FY16<br />

PM 238 266 334<br />

Other 932 835 721<br />

TOTAL 1,170 1,101 1,055<br />

18 ltp.umich.edu ltp.umich.edu<br />

19


Parking<br />

In <strong>FY18</strong>, parking demand across the University continued to grow. <strong>LTP</strong><br />

and Michigan Medicine formed a Parking and Transportation Advisory<br />

Committee to address the growing patient, visitor, and staff parking<br />

needs on the Medical Campus. Parking and Transportation solutions<br />

in <strong>FY18</strong> included:<br />

1<br />

2<br />

3<br />

4<br />

5<br />

Expansion of NC53 (Orange).<br />

Expansion of the Green Road Park & Ride (free commuter parking).<br />

Crisler Express Bus service (Michigan Medicine transportation option<br />

from the Medical Campus to SC7) - service started Fall 2018 and has<br />

continued through <strong>FY18</strong>.<br />

East Ann Arbor Shuttle Service (cab service from East Ann Arbor to<br />

the Medical Campus with return service).<br />

Late Night Pilot Program (cab service from the Medical Campus to<br />

North Campus parking lots from 10:30 p.m. - 4 a.m.).<br />

Overall, the goal of the above efforts for parking and transportation<br />

solutions are to ease the parking crunch and improve customer<br />

satisfaction. The Regents also approved a second Wall Street Structure.<br />

Parking Access Revenue Control Systems (PARCS) was installed at the<br />

Palmer Street Structure in January 2018. The visitor parking area is now<br />

an automated parking facility. New PARCS equipment will be installed<br />

through several patient and visitors sections at Michigan Medicine in<br />

FY19-20.<br />

P1 Cancer Center and P5 CVC are scheduled to be automated facilities<br />

while P2 Taubman and P4 Mott are scheduled to be hybrid facilities with<br />

both parking attendants and automated equipment. For <strong>FY18</strong> revenue,<br />

transaction numbers appeared to be lower at the P4 Mott and P5 CVC<br />

facility. This can be attributed to major repair projects that occurred in those<br />

facilities Summer and Fall 2018.<br />

Parking Customer Services, as of February 2018, has all staff positions<br />

within the unit filled. Approval for a one year appointment for a customer<br />

service representative was approved to assist with customer service<br />

interactions. Having the additional staff member to answer the ever<br />

increasing customer calls and emails has been a positive improvement<br />

for the Parking Customer Services office.<br />

Active Parking Permits<br />

Permit Type <strong>FY18</strong> FY17 FY16<br />

Gold 1,803 1,756 1,699<br />

Blue 17,769 17,579 16,609<br />

Yellow 9,113 8,873 8,563<br />

Orange 5,455 4,966 5,068<br />

TOTAL 34,140 33,174 31,939<br />

15<br />

structures<br />

330 acres<br />

~ 100<br />

surface lots<br />

Parking Transactions<br />

Structure <strong>FY18</strong> FY17 FY16<br />

Cancer Center (P1) 116,532 116,035 119,679<br />

Taubman North<br />

(P2)<br />

791,656 789,735 765,580<br />

Mott/Simpson (P4) 237,312 274,487 259,238<br />

CVC (P5) 52,118 63,884 65,608<br />

Sub-Total - Medical<br />

Campus<br />

1,197,618 1,244,141 1,210,105<br />

Fletcher St. 83,311 92,567 91,493<br />

Palmer Dr. 64,996 71,358 68,795<br />

Sub-Total - Central<br />

Campus<br />

148,307 163,925 160,288<br />

TOTAL 1,345,925 1,408,066 1,370,393<br />

20 ltp.umich.edu ltp.umich.edu<br />

21


FINANCIALS<br />

<strong>LTP</strong> Consolidated Financial Results<br />

<strong>FY18</strong> FY17 FY16<br />

Dollars $$<br />

Revenue<br />

Parking Permit Revenue 27,112,652 26,017,912 24,566,164<br />

Medical Campus Patient/Visitor 3,247,893 3,291,905 3,204,429<br />

<strong>LTP</strong> Services 27,004,350 26,364,047 19,977,788<br />

Total Revenue 57,364,895 55,673,864 47,748,381<br />

Expenses<br />

Compensation & Benefits 18,336,809 18,024,556 13,486,602<br />

Services of Others - External 5,087,582 3,382,139 3,467,126<br />

Insurance 1,706,999 1,752,012 1,571,221<br />

Utilities 1,281,903 1,157,713 1,245,184<br />

UM Transportation 5,837,625 5,316,743 4,969,403<br />

Plant Operations, Maint, & Materials 4,743,901 3,964,917 2,474,608<br />

Other Expense 1,483,269 1,135,509 2,033,496<br />

22 ltp.umich.edu ltp.umich.edu<br />

23


PROJECT HIGHLIGHTS<br />

Michigan Medicine Parking & Transportation Solutions<br />

<strong>LTP</strong> has been working closely with Michigan Medicine on a number of<br />

near and longer term solutions to help address parking and transportation<br />

challenges. Some highlights in <strong>FY18</strong> include:<br />

Wall Street West Structure: The University of Michigan’s Board of<br />

Regents approved a 1050-space, $39.5 million parking structure located<br />

between Wall Street and Maiden Lane during its meeting on Thursday,<br />

Dec. 7. Project completion is anticipated at the end of 2020.<br />

Commuter lot enhancements: The East Ann Arbor gravel lot was improved<br />

and now has the capacity for 422 parking spaces. NC53 and Green Road<br />

Commuter lots were also expanded, by approximately 250 and 120<br />

spaces respectively.<br />

Employee Parking Shuttle: To help improve parking capacity and access,<br />

a new direct shuttle service launched in February 2018 for employees<br />

between the East Ann Arbor (EC1) gravel parking lot (375 free parking<br />

spaces for MM employees) and the academic medical center. Service<br />

hours are 5:45AM - 1AM M-F (until Saturday morning) with 5-10 minute<br />

frequency during peak times.<br />

Late Night Transportation (Blue Car): A pilot program launched in<br />

Fall 2017 offering on demand cab service between Taubman and<br />

northeast parking lots. Service hours are 10:30pm - 4am M-F<br />

(until Saturday morning).<br />

Michigan Medicine Parking & Transportation Advisory Committee<br />

(PTAC): Co-chaired by Michigan Medicine and F&O, a new committee<br />

(of approximately 15 employees) was formed to increase employee<br />

engagement in the identification, prioritization and implementation of<br />

actions to improve parking and transportation for Michigan Medicine<br />

employees. A final report is anticipated in Summer 2018.<br />

Connector and Mobility Research<br />

In FY17 (January), the university and partners (City of Ann Arbor, AAATA<br />

and DDA) began discussing refocusing work of the Connector study to<br />

address segments which are most congested and carry the highest volumes<br />

of trips. In <strong>FY18</strong>, the university began to explore less costly options for a<br />

shorter segment connecting north and central campuses. The work is taking<br />

a comprehensive look at the Fuller Road corridor and focusing on a high<br />

capacity, dedicated right-of-way that accommodates current technologies<br />

and can incrementally support future advancements in technology, such as<br />

automated and connected vehicles.<br />

At the request of UMOR and College of Engineering (COE), <strong>LTP</strong> has<br />

participated in an effort with General Motors since FY16 that launched a car<br />

sharing program branded as Maven.<br />

<strong>LTP</strong> has been collaborating with the COE and is operating shuttles on behalf<br />

of RITMO (Reinventing Urban Transportation and mobility), a new on-demand<br />

transportation system developed by COE research. These shuttles may<br />

someday have the potential to support<br />

<strong>LTP</strong> operations, working in conjunction with high-capacity transit routes<br />

on campus.<br />

<strong>LTP</strong> has been working closely with Mcity and U-M Transportation Research<br />

Institute in the exploration of autonomous and connected vehicle technology.<br />

These efforts may one day lead to solutions in mobility other than commuting<br />

in single occupancy vehicles.<br />

Transportation Facility<br />

In FY16, the University decided not to move forward with plans to build a<br />

new transportation operations and maintenance center on North Campus<br />

(originally approved in May 2014). The project had called for a $38.5 million,<br />

100,000-square-foot building to be constructed near Green Road between<br />

Baxter and Hubbard roads, relocating from Kipke Drive on the Stephen M.<br />

Ross Athletic Campus. The proposed center was planned to accommodate<br />

current and future maintenance space needs, including the flexibility to<br />

handle larger, articulated buses.<br />

Due to the cancellation of the project, <strong>LTP</strong> initiated a couple new projects<br />

in <strong>FY18</strong>:<br />

• An interim plan to provide more immediate upgrades for Fleet and<br />

Vehicle Maintenance operations on Ross Athletic Campus, while<br />

retaining all operations at that facility.<br />

• A longer term plan (3-5 years) to relocate Transit and Heavy Equipment<br />

to North Campus, while retaining and renovating spaces for Fleet and<br />

Vehicle Maintenance on Ross Athletic Campus.<br />

Lighting Replacement<br />

<strong>LTP</strong> has continued its plan to upgrade parking lot and structure lighting.<br />

In <strong>FY18</strong>, new LED lighting was installed at the North Entrance parking<br />

structure (P1). The project included installation of a generator for<br />

emergency power, new conduit, wiring and distribution panels. The fixtures<br />

selected offered integrated controls that reduce light output when ambient<br />

light levels are high and during idle periods. In addition to parking bays,<br />

new fixtures were installed on the roof, in stair/elevator towers, the elevator<br />

shaft, and storage and service, electrical and mechanical rooms. An<br />

approximate 70% energy reduction was achieved.<br />

Parking lot lighting improvements also continued in <strong>FY18</strong> with the<br />

installation of LED fixtures at three locations. In addition to specifically<br />

planned locations, parking lot lighting throughout the campus will be<br />

upgraded to LED fixtures in lieu of making repairs to existing lights. Future<br />

planned relighting projects include the NCRC and Catherine structures in<br />

FY2019, and Fletcher and Church structures in 2020.<br />

Bike Share Program<br />

In her fall 2011 Sustainability Address, President Coleman identified the<br />

goal of bringing a modern bike sharing system to campus. To further this<br />

idea, bike sharing was identified as a <strong>LTP</strong> Business and Finance priority<br />

for FY2013. Due to concurrent City and local agency interest, <strong>LTP</strong> has<br />

focused on a collaborative approach to bike sharing since FY2012—working<br />

closely with the City of Ann Arbor, Ann Arbor Area Transportation Authority<br />

(AAATA) and Downtown Development Authority (DDA) to establish a<br />

modern bike sharing system in Ann Arbor. A three-year pilot launched in<br />

fall FY2015, where U-M committed an annual contribution of up to<br />

$200,000 for three years to cover a large percentage of system operating<br />

expenses and assume title sponsorship. The pilot was extended during<br />

FY17. In <strong>FY18</strong>, AAATA assumed management of the Ann Arbor bike share<br />

program. A new vendor will be selected by the end of <strong>FY18</strong> - early FY19<br />

to operate the system.<br />

Parking Automation Project<br />

In FY2015, <strong>LTP</strong> retained a consultant to assist in the development of a<br />

long term plan for introducing greater automation in patient and visitor<br />

structures. The effort emphasized customer experience as a primary focus.<br />

New parking access and revenue control systems (PARCS) were installed<br />

in the Palmer and Fletcher parking structures in early 2018. Palmer visitor<br />

parking is now a fully automated while cashier and self-service equipment<br />

(intended for use after cashier operations end) is available at Fletcher. New<br />

PARCS equipment will be installed in the patient and visitor parking areas<br />

at medical campus parking facilities in <strong>FY18</strong>. P1 (North Entrance) and P5<br />

(Cardiovascular Center) are planned to be automated facilities while P2<br />

(East Medical Center) and P4 (Simpson Circle) are planned to be hybrid<br />

facilities with both cashiers and self-service equipment.<br />

24 ltp.umich.edu ltp.umich.edu<br />

25


<strong>FY18</strong> ANNUAL REPORT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!