12.03.2019 Views

Executive Summary SMR

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• Design and installation of new church-based interpretation and welcome point/donation places to<br />

encourage an uplift in donations.<br />

5.1.3 Phase 2 (Visitor number projection of 80,000)<br />

This phase would see the business and events development side of <strong>SMR</strong> launched with the opening of the new<br />

business/ event space. During this phase the Hogarth and Visitor centre can be under construction in<br />

anticipation of opening during phase 3.<br />

All of Phase 1 activities would be on-going during phase 2 and would be enhanced by the opening of the new<br />

business/event space.<br />

Phase 2 activity would include<br />

• Appointment of the Education offer (0.5FTE) 6 months into this phase to develop the education/school<br />

tours.<br />

• Open new business and events building.<br />

• Start business and wedding events service.<br />

• Start music events.<br />

• Appoint curatorial manager (1.0FTE) 6 months into this phase in preparation of the opening of the for<br />

the Hogarth visitor centre.<br />

During Phase 2 the Hogarth/ visitor centre would be under construction in anticipation of opening during phase 3<br />

5.1.4 Phase 3 (Visitor number projection of 100,000)<br />

This phase would see the opening of the Hogarth and visitor centre. The centre would house;<br />

• The Hogarth Painting<br />

• A temporary exhibition centre<br />

• New and improved café and restaurant facilities<br />

5.1.5 Phase 4 (Visitor number projection of 120,000)<br />

This phase would see all areas of the new build open and running with visitor numbers increased to around<br />

120,000.<br />

The new Hogarth centre would have an on-going temporary exhibition program and lecture series managed by<br />

the curatorial manager.<br />

5.1.6 Phase 5 (Visitor number projection of 140,000)<br />

This is the final phase of the business plan. The marketing budget would be increased by 50% to publicise the new<br />

facilities and maximise visitor numbers.<br />

This would be a consolidation phase building visitor numbers through the increased marketing budget and<br />

strategy to the maximum of 140,000.<br />

8 | P a g e

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!