BACnet & BMS Journal India – Issue 1
Would you like to read the current issue of the BACnet & BMS Journal India comfortably at your PC or tablet? You don't want to miss any upcoming issue? Then just inform us briefly by email to bacnetjournal@big-eu.org and you will be kept informed as soon as a new issue is available.
Would you like to read the current issue of the BACnet & BMS Journal India comfortably at your PC or tablet? You don't want to miss any upcoming issue?
Then just inform us briefly by email to bacnetjournal@big-eu.org and you will be kept informed as soon as a new issue is available.
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Solutions<br />
<strong>BACnet</strong>/IP the “Tool” from Engineering to<br />
Project Management<br />
Principal, Santiago International Airport.<br />
© Beckhoff<br />
Santiago International Airport obtains the<br />
benefits of using <strong>BACnet</strong> and Beckhoff<br />
technologies in the new extension of their<br />
facilities.<br />
The new terminal extension project for Santiago<br />
International Airport will allow the use of 67<br />
new boarding gates along 294.000 m² of total<br />
area. The number of passengers will increase<br />
significantly by more than 10% every year, with<br />
a total of 21 million transit movements recorded<br />
for the last year. The scope of the control extension<br />
project covers the main facility systems,<br />
including HVAC, lighting, energy management,<br />
elevators/escalators, platform illumination,<br />
towers and third-party integrations such as<br />
water storage alarm systems and passenger<br />
gangways.<br />
The project demands not only the collection of<br />
field data, the PLC will have a logic control to<br />
ensure the correct operation of the different<br />
physical devices and sensors installed in the new<br />
terminals of the airport. As a mandatory project<br />
requirement, the system had to be created<br />
following a philosophy oriented to real open<br />
systems, so it was decided to use <strong>BACnet</strong> as a<br />
control system development standard.<br />
The complete solution to cover all aspects<br />
mentioned above, was created using a total of<br />
more than 300 PLCs distributed throughout the<br />
newly developed surface. 23 Beckhoff CX5010<br />
as main data concentrators and 57 CX9020 with<br />
233 CX8091 systems were installed to collect<br />
field information.<br />
The complete I/O list includes more than 10.000<br />
signals, processed by Beckhoff PLCs, creating an<br />
object hierarchy that enables a communication<br />
and sharing information through the use of the<br />
physical <strong>BACnet</strong> network.<br />
4<br />
<strong>BACnet</strong> & <strong>BMS</strong> <strong>Journal</strong> <strong>India</strong> 1 04/19