07.06.2019 Views

2019 Deck Project

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Looking along the front deck, with the top rail now removed (but still place for the birds<br />

to sit).<br />

Several of the rails will need repairing at the bottom where they join the lower cross<br />

piece. The deck, too, is going to be restained.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!