09.03.2020 Views

Newsletter ACERA - Febrero 2020

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MEET<br />

the proyect<br />

Wind Farm<br />

MONTE REDONDO<br />

Project: Monte Redondo Wind Farm<br />

Technology: Wind<br />

<strong>ACERA</strong> member company: ENGIE<br />

Installed Power: 48 MW<br />

Region: Coquimbo<br />

Injected Grid: National Electric System<br />

Ten years ago, ENGIE launched the Monte Redondo wind farm,<br />

one of the company's first renewable projects in Chile. This plant<br />

has 19 wind turbines with a capacity of 2 MW, which means<br />

reducing emissions by about 68 thousand tons of CO2 per year,<br />

which is equivalent to removing 15 thousand cars from<br />

circulation. ENGIE continues with its view to renewable energy<br />

development, recently launching a renewable investment plan.<br />

"ENGIE's Renewable Bet"<br />

In October 2019, ENGIE launched the construction phase of its<br />

1,000 MW Renewable Investment Plan, which begins with the first<br />

three projects located in the Antofagasta Region. It is the Calama<br />

Wind Farm, Capricorn Solar Plant, which has already started its<br />

construction, and the Tamaya Solar Plant, whose construction is<br />

planned for the first quarter of <strong>2020</strong>. These first three projects will<br />

have a capacity of approximately 370 MW and will generate about<br />

1,000 direct jobs at peak hiring times.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!