A sink unit has been fitted and plumbed in with a water heater and

a section of work surface fitted from sink to wall. One missing

door and frame has been replaced, the other door has been painted.

The walls have been filled in and two coats of paint applied.

Some of the skirting had rotted so had to be replaced with

planking taken from the fuel hut. A pressure washer turned on the

area has made it quite presentable and much better working

conditions for the plumber. Painting the floor has completed the

job. All the necessary equipment for a kitchen has now been put in

place plus a couple of heaters so we can now sit in comfort for our

meal break.

The toilets and sinks have been renewed, piping laid and water

connected. The ladies toilet doors and frames were covered with

paint that has cracked badly so a blowlamp and scraper had to be

used to take them back to bare wood. The bottom of the door

frames have rotted, these have been scraped out and filled with

cement which will not show too much when painted over. The

walls of the canteen have been washed down with sugar soap

which revealed that most of the wall tiles are OK but some have

been damaged. These have now been filled with cement and the

numerous holes have been filled with polyfilla and a couple of

coats of tile paint were needed to tidy it all up. The walls above

the tiles, together with the corridors have had fixtures and fitting

removed, cleaned and painted. The missing door and frame has

been replaced and the frame and floor painted.

The gents’ toilets are differently constructed to the ladies with

partitions of melamine which, after a good clean are found to be in

a fairly good condition. The doors have been painted, some of the

wall tiles have been damaged, and have been given the cement and

polyfilla treatment. A good wash down with sugar soap have left

it looking quite presentable. The walls and floor have received the

same treatment. The missing outer door and frame has been

replaced. A final clean up has completed the job.