Multiple power redundancy features, including feeding

of the Project site through two main sources from

the electrical authorities, a backup power generator

for feeding life safety equipment in all public spaces

in the event of an emergency outage, and batteries

as a backup source for security systems. All systems

are controlled through a building management system

(BMS) to minimize energy consumption whilst

providing full monitoring services for all Mechanical

and Electrical systems.

To increase energy efficiency, reduce overheads,

and enhance the overall experience of residents, the

Project utilizes the following innovative technologies