More out of ore!<br />

Outokumpu Technology<br />

<strong>Ferrochrome</strong> <strong>projects</strong><br />

<strong>in</strong> <strong>South</strong> <strong>Africa</strong><br />

Jorma Daavittila<br />

Vice President, Ferroalloys sales


Content<br />

<strong>Ferrochrome</strong> <strong>projects</strong> <strong>in</strong> <strong>South</strong> <strong>Africa</strong><br />

• Base Metals division<br />

• Introduction<br />

• Technology transfer sales<br />

• Typical scope <strong>in</strong> company’s <strong>projects</strong><br />

• Project implementation<br />

• Summary of <strong>projects</strong><br />

• Success factors<br />

• References<br />

CMD 2007 | 2


Base Metals division<br />

• Base Metals offers <strong>in</strong>dustry-lead<strong>in</strong>g technologies for the process<strong>in</strong>g<br />

of non-ferrous metals and ferroalloys<br />

CMD 2007 | 3<br />

Copper<br />

technologies<br />

Nickel<br />

technologies<br />

Z<strong>in</strong>c<br />

technologies<br />

Precious metals<br />

technologies<br />

Ferroalloy<br />

technologies


Introduction<br />

1. Chrome reserves<br />

• <strong>South</strong> <strong>Africa</strong> - 5,000 million tonnes (MT), 76% world’s reserves<br />

• Zimbabwe - 930 MT<br />

• Others - 800 MT<br />

2. Ore production<br />

• World total - 19 MTPA<br />

• <strong>South</strong> <strong>Africa</strong> - 7,5 MTPA, 40% of world’s total production<br />

• Kazahkstan - 3 MTPA<br />

3. <strong>South</strong> <strong>Africa</strong>n ferrochrome plants<br />

• FeCr production 3,2 MTPA (e2006)<br />

• 49% world’s FeCr production<br />

Ma<strong>in</strong> source: MB-ferroalloys conference 2006<br />

CMD 2007 | 4


Introduction (cont)<br />

4. Outokumpu Technology’s activities <strong>in</strong> <strong>South</strong> <strong>Africa</strong><br />

CMD 2007 | 5<br />

I. Before sanctions<br />

• Close cooperation and some deliveries<br />

II. Dur<strong>in</strong>g sanctions (1985 – 1993)<br />

• Contacts ma<strong>in</strong>ta<strong>in</strong>ed, no sales<br />

• New Outokumpu process developed<br />

III. New <strong>South</strong> <strong>Africa</strong><br />

• Market<strong>in</strong>g restarted immediately after the removal of the sanctions<br />

• 9 <strong>Ferrochrome</strong> <strong>projects</strong> <strong>in</strong> <strong>South</strong> <strong>Africa</strong> <strong>in</strong> last 10 years<br />

• More under development


<strong>South</strong> <strong>Africa</strong> Bushwelt complex<br />

CMD 2007 | 6


Outokumpu Technology’s<br />

Technology Transfer sales<br />

1. Outokumpu Technology’s technology used <strong>in</strong> almost<br />

half of the <strong>South</strong> <strong>Africa</strong>n FeCr production <strong>in</strong> 2006<br />

2. The technology has set new standards for<br />

environmental requirements<br />

3. Only one major producer is not us<strong>in</strong>g Outokumpu<br />

Technology’s technology yet (negotiations ongo<strong>in</strong>g)<br />

CMD 2007 | 7


CMD 2007 | 8<br />

Gr<strong>in</strong>d<strong>in</strong>g<br />

Pelletiz<strong>in</strong>g<br />

Filter<strong>in</strong>g<br />

S<strong>in</strong>ter<strong>in</strong>g<br />

– smelt<strong>in</strong>g capacity<br />

<strong>in</strong>creased by 15%<br />

Gas clean<strong>in</strong>g<br />

Smelt<strong>in</strong>g<br />

Preheat<strong>in</strong>g<br />

- energysav<strong>in</strong>g<br />

500 kWh/t<br />

– high metal recovery


Typical scope of supply<br />

1. Technology transfer package<br />

• Basic eng<strong>in</strong>eer<strong>in</strong>g of the plant<br />

• Supply of the key equipment<br />

• Tra<strong>in</strong><strong>in</strong>g of customer’s personnel<br />

• Installation and start-op supervision<br />

• License<br />

2. <strong>South</strong> <strong>Africa</strong>n contractor<br />

• Supply of the rema<strong>in</strong><strong>in</strong>g equipment<br />

• General manag<strong>in</strong>g of the project<br />

• Construction and actual <strong>in</strong>stallation of the plant<br />

CMD 2007 | 9


<strong>South</strong> <strong>Africa</strong> ferrochrome plants<br />

CMD 2007 | 10<br />

Merafe (SA-Chrome)<br />

Hernic <strong>Ferrochrome</strong>,<br />

Samancor Ferrometals,<br />

Samancor Tubatse<br />

Assmang Chrome<br />

Xtrata Wonderkop<br />

International Ferro Metals (<br />

ASA Metals<br />

Xtrata Lydenburg<br />

Samancor Middelburg<br />

Xtrata Rustenburg<br />

Outokumpu Technology


<strong>South</strong> <strong>Africa</strong> ferrochrome plants<br />

CMD 2007 | 11


Project implementation<br />

1. Basic eng<strong>in</strong>eer<strong>in</strong>g, 5 months<br />

2. Equipment manufactur<strong>in</strong>g and supply, 7-11 months<br />

• Manufactur<strong>in</strong>g <strong>in</strong> Europe (FOB-delivery)<br />

• Manufactur<strong>in</strong>g <strong>in</strong> <strong>South</strong> <strong>Africa</strong> (DDU-supply)<br />

3. Installation and start-up<br />

• Outokumpu Technology’s supervision<br />

• Mechanical completion -> Start-up<br />

• Performance demonstration<br />

4. Acceptance<br />

• Overall schedule, 18 months<br />

5. Customer support service<br />

• New deals<br />

CMD 2007 | 12


Success factors<br />

� Own technology, (Tornio plant)<br />

• Good references<br />

• Operat<strong>in</strong>g and ma<strong>in</strong>tenance experience<br />

• Proven competitive technology<br />

� Environmentally friendly<br />

� Energy efficient (figures <strong>in</strong> flow sheet)<br />

� Very high operational availability, 95 – 99%<br />

� Pori Research Center<br />

• Technology development <strong>in</strong>cl. pilot tests<br />

• Test<strong>in</strong>g of customer’s materials to def<strong>in</strong>e design and<br />

operat<strong>in</strong>g parameters<br />

• Process support <strong>in</strong> market<strong>in</strong>g and sales as well as <strong>in</strong><br />

project implementation and start-up<br />

CMD 2007 | 13


Success factors (cont)<br />

� Good, reliable products based on own development<br />

• Steel belt s<strong>in</strong>ter<strong>in</strong>g<br />

• Smelt<strong>in</strong>g with preheat<strong>in</strong>g and effective gas clean<strong>in</strong>g and<br />

gas utilization<br />

� Cooperation with local partners<br />

� Good personal relations/mutual trust<br />

� Well operat<strong>in</strong>g plants <strong>in</strong> <strong>South</strong> <strong>Africa</strong><br />

• Active service after start-up<br />

• Process support<br />

• Life cycle commitment<br />

CMD 2007 | 14


SAMANCOR, FERROMETALS<br />

• CONTRACT 1996<br />

• 520,000 TPA PELLETISING<br />

PLANT (CHROMITE ORE)<br />

• 2 x 48 MVA FeCr SMELTER WITH<br />

PREHEATING<br />

CMD 2007 | 15


HERNIC FERROCHROME, HOT3<br />

• CONTRACT 1998<br />

• 350,000 TPA PELLETISING<br />

PLANT(CHROMITE ORE)<br />

• 54 MVA FeCr SMELTER WITH<br />

PREHEATING<br />

CMD 2007 | 16


HERNIC FERROCHROME (F4PS2)<br />

• CONTRACT 2004<br />

• 350,000 TPA PELLETISING<br />

PLANT (CHROMITE ORE)<br />

• 78 MVA FeCr SMELTER WITH<br />

PREHEATING<br />

• BIGGEST FURNACE<br />

WORLDWIDE<br />

CMD 2007 | 17


CMD 2007 | 18<br />

More out of ore!<br />

www.outokumputechnology.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!