14<br />
thermal hydraulic studies, experimental backup to<br />
confirm the design intent of SGDHR, structural integrity<br />
assessment of Decay Heat Exchanger under Core<br />
Disruptive Accident pressure loading, etc. are under<br />
detailed review.<br />
! Fuel Sub-Assembly design has been modified and<br />
graphite is removed as top axial shield and is replaced<br />
with B 4 C and SS, to avoid possible sodium-graphite<br />
reaction in the presence of oxygen.<br />
! Specialist Group consisting of experts has carried out<br />
in-detail design safety review of Inclined Fuel Transfer<br />
Machine (IFTM) and has made many important<br />
recommendations for safety improvements.<br />
! Aspects related to cable layout within the plant were<br />
reviewed in detail to assess compliance with safety<br />
requirements.<br />
! AERB is currently checking the conformity of PFBR<br />
design with IAEA code NS-R-1, 2000 requirements.<br />
! It was noted that t<strong>here</strong> are a number of safety significant<br />
major equipment, which are required to be installed/<br />
erected in parallel with civil construction. Installation<br />
of first of such equipment, Safety Vessel (SV), is<br />
expected to be started in about 6 months from the start<br />
of construction of reactor vault. Installation of SV would<br />
be considered as the beginning of third sub-stage of<br />
construction authorisation requiring <strong>Regulatory</strong> Consent.<br />
KAPP-3&4<br />
NPCIL, based on its experience with 540 MWe<br />
PHWR Units built at Tarapur, proposes to build two upgraded<br />
Units of 700 MWe at Kakrapar in Gujarat. AERB has initiated<br />
the review of the Site Evaluation Report submitted by NPCIL<br />
for approval of the site.<br />
DFRP<br />
IGCAR is setting up a Demonstration Fast reactor<br />
fuel Reprocessing Plant (DFRP) at Kalpakkam to process<br />
the carbide fuels from FBTR and fuel assemblies of PFBR<br />
in future. The DFRP would be forerunner of the FBR fuel<br />
reprocessing plant proposed to be set up at Kalpakkam and<br />
would utilise the experience gained from Lead Mini Cell<br />
operation. The DFRP is located adjacent to the Kalpakkam<br />
Reprocessing Plant (KARP), a BARC facility and shares with<br />
it certain safety related systems, facilities and buildings.<br />
A Project Design Safety Committee (PDSC-DFRP)<br />
is currently reviewing aspects such as, plant design safety<br />
criteria, operating experience of Lead Mini Cell and issues<br />
related to sharing of certain facilities with KARP. AERB is<br />
also reviewing an application for construction of the Head<br />
End Facilities of DFRP.<br />
IFSB<br />
IGCAR has proposed to construct an Interim Fuel<br />
Storage Building (IFSB) for PFBR. The facility is being<br />
designed for making fuel assemblies for initial two core<br />
loadings. The IFSB will be constructed within FBTR<br />
complex. A Project Design Safety Committee for IFSB has<br />
been constituted recently and the review process has been<br />
initiated.<br />
Some of the salient observations/ recommendations<br />
during the review process are the following:<br />
! Provision of appropriate shielding to take care of the<br />
gamma radiations from build up of Americium-241.<br />
! Analysis of accidental dropping of fuel Sub-Assembly<br />
as a Design Basis Event.<br />
2.1.2 Authorisations / Permissions Issued for<br />
Nuclear Projects<br />
TAPP-3<br />
! Authorisation for Hot Conditioning and Light Water<br />
Commissioning<br />
! Permission for Draining Light Water from PHT and<br />
Moderator Systems<br />
! Authorisation for Initial Fuel Loading in the Core<br />
TAPP-4<br />
! Authorisation for synchronization of the Unit and<br />
operation upto 50% FP<br />
! Authorisation for operation upto 90% FP<br />
RAPP-6<br />
! Authorisation for Erection of Major Equipment<br />
PFBR<br />
! Authorisation for Re-construction of Nuclear Island<br />
Connected Buildings (NICB) raft.<br />
! Permission for Construction of Perimeter Wall around<br />
NICB and certain Safety Related Buildings/Structures.<br />
! Clearance for Construction of Superstructure for the<br />
eight buildings on common NICB raft (except RV and<br />
SSSB)