14<br />

thermal hydraulic studies, experimental backup to<br />

confirm the design intent of SGDHR, structural integrity<br />

assessment of Decay Heat Exchanger under Core<br />

Disruptive Accident pressure loading, etc. are under<br />

detailed review.<br />

! Fuel Sub-Assembly design has been modified and<br />

graphite is removed as top axial shield and is replaced<br />

with B 4 C and SS, to avoid possible sodium-graphite<br />

reaction in the presence of oxygen.<br />

! Specialist Group consisting of experts has carried out<br />

in-detail design safety review of Inclined Fuel Transfer<br />

Machine (IFTM) and has made many important<br />

recommendations for safety improvements.<br />

! Aspects related to cable layout within the plant were<br />

reviewed in detail to assess compliance with safety<br />

requirements.<br />

! AERB is currently checking the conformity of PFBR<br />

design with IAEA code NS-R-1, 2000 requirements.<br />

! It was noted that t<strong>here</strong> are a number of safety significant<br />

major equipment, which are required to be installed/<br />

erected in parallel with civil construction. Installation<br />

of first of such equipment, Safety Vessel (SV), is<br />

expected to be started in about 6 months from the start<br />

of construction of reactor vault. Installation of SV would<br />

be considered as the beginning of third sub-stage of<br />

construction authorisation requiring <strong>Regulatory</strong> Consent.<br />

KAPP-3&4<br />

NPCIL, based on its experience with 540 MWe<br />

PHWR Units built at Tarapur, proposes to build two upgraded<br />

Units of 700 MWe at Kakrapar in Gujarat. AERB has initiated<br />

the review of the Site Evaluation Report submitted by NPCIL<br />

for approval of the site.<br />

DFRP<br />

IGCAR is setting up a Demonstration Fast reactor<br />

fuel Reprocessing Plant (DFRP) at Kalpakkam to process<br />

the carbide fuels from FBTR and fuel assemblies of PFBR<br />

in future. The DFRP would be forerunner of the FBR fuel<br />

reprocessing plant proposed to be set up at Kalpakkam and<br />

would utilise the experience gained from Lead Mini Cell<br />

operation. The DFRP is located adjacent to the Kalpakkam<br />

Reprocessing Plant (KARP), a BARC facility and shares with<br />

it certain safety related systems, facilities and buildings.<br />

A Project Design Safety Committee (PDSC-DFRP)<br />

is currently reviewing aspects such as, plant design safety<br />

criteria, operating experience of Lead Mini Cell and issues<br />

related to sharing of certain facilities with KARP. AERB is<br />

also reviewing an application for construction of the Head<br />

End Facilities of DFRP.<br />

IFSB<br />

IGCAR has proposed to construct an Interim Fuel<br />

Storage Building (IFSB) for PFBR. The facility is being<br />

designed for making fuel assemblies for initial two core<br />

loadings. The IFSB will be constructed within FBTR<br />

complex. A Project Design Safety Committee for IFSB has<br />

been constituted recently and the review process has been<br />

initiated.<br />

Some of the salient observations/ recommendations<br />

during the review process are the following:<br />

! Provision of appropriate shielding to take care of the<br />

gamma radiations from build up of Americium-241.<br />

! Analysis of accidental dropping of fuel Sub-Assembly<br />

as a Design Basis Event.<br />

2.1.2 Authorisations / Permissions Issued for<br />

Nuclear Projects<br />

TAPP-3<br />

! Authorisation for Hot Conditioning and Light Water<br />

Commissioning<br />

! Permission for Draining Light Water from PHT and<br />

Moderator Systems<br />

! Authorisation for Initial Fuel Loading in the Core<br />

TAPP-4<br />

! Authorisation for synchronization of the Unit and<br />

operation upto 50% FP<br />

! Authorisation for operation upto 90% FP<br />

RAPP-6<br />

! Authorisation for Erection of Major Equipment<br />

PFBR<br />

! Authorisation for Re-construction of Nuclear Island<br />

Connected Buildings (NICB) raft.<br />

! Permission for Construction of Perimeter Wall around<br />

NICB and certain Safety Related Buildings/Structures.<br />

! Clearance for Construction of Superstructure for the<br />

eight buildings on common NICB raft (except RV and<br />

SSSB)