! HWP, Baroda has made an application to AERB for<br />

authorisation for regular operation of the plant.<br />

SCHWOP after discussion on the operational experience<br />

during and after commissioning and the structured<br />

ageing management plan had recommended for grant<br />

of regular operation. SARCOP is further reviewing the<br />

application.<br />

! HWP, Talcher had submitted Safety Report for grant of<br />

clearance for setting up of packing evaluation test loop<br />

for Boron Enrichment at HWP, Talcher and its<br />

commissioning. The operation is intended for 3 to 6<br />

months. SCHWOP recommended clearance of the<br />

proposal with certain stipulations.<br />

! In- Service Inspection Plan of Main & Mini Cracker<br />

Units of Ammonia based Heavy Water Plants was<br />

approved by SCHWOP.<br />

! The earthen bund of the Ash Pond-1 of HWP, Manuguru<br />

breached in January 2004. HWB undertook failure<br />

analysis of the ash pond dyke and proposed a<br />

methodology for repair of the breached portion of the<br />

dyke. The report on the analysis and proposals for repair<br />

of the breached portion were reviewed by CESCOP and<br />

SARCOP. Based on the review, SARCOP granted<br />

clearance to undertake the repair. HWP was asked to<br />

undertake a study to establish stability of the existing<br />

ash pond bunds and implement a maintenance program<br />

for the ash pond bunds. The plant was also asked to<br />

study the liquefaction potential and slope stability under<br />

seismic loading.<br />

2.3.3 Indian Rare Earths Limited (IREL)<br />

The IREL plants at Chavara, Manavalakurichi,<br />

OSCOM and Udyogamandal were operating normal during<br />

the year. The Safety Committee for IRE plants (IRESC) and<br />

SARCOP reviewed the safety status of the plants and<br />

proposals for certain new activities. Important permissions/<br />

clearances issued for IREL plants are as follows:<br />

! Interim clearances were issued in the year 2004 for<br />

retrieval and processing of 300 tons of thorium<br />

concentrate and subsequently for retrieval and<br />

processing of additional 1000 tons of thorium<br />

concentrate stored in the silos at IRE, Udyogamandal,<br />

for recovery of uranium (Project THRUST - Thorium<br />

Retrieval, Uranium recovery and Storage). IRE<br />

completed the processing of 1000 tons of thorium<br />

concentrate and sought permission for regular operation<br />

28<br />

of THRUST Project. Clearance for continuous retrieval<br />

and processing of the thorium concentrate contained<br />

in the silos 1, 2 & 3 was issued after extensive reviews<br />

and implementation of a number of modifications in<br />

the plant systems as stipulated by AERB.<br />

! The Safety Evaluation Report for processing of<br />

Columbite – Tantalite sludge (CTS) to produce<br />

Ammonium Diuranate in the Uranium Refining Plant<br />

of IRE, Udyogamandal was reviewed and the Safety<br />

Committee recommended processing of CTS with some<br />

stipulations.<br />

! IREL, OSCOM has proposed for setting up 10,000 TPA<br />

of monazite processing plant at IREL, OSCOM. A subcommittee<br />

has been constituted to study the revised<br />

Site Evaluation Report.<br />

! Safety committee discussed on the processing of<br />

uranium ore obtained from Metallurgical Products India<br />

Ltd. at IREL Udyogamandal and recommended the<br />

proposal of processing of 7.5 tons of ore with some<br />

stipulations.<br />

2.3.4 Uranium Corporation of India Limited (UCIL)<br />

The UCIL mines at Jaduguda, Bhatin, Narwapahar,<br />

Turamdih and Banduhurang and Jaduguda mill were<br />

operating normal. Following were the documents/reports<br />

reviewed and recommendations made by UCIL Safety<br />

Committee and ACPSR-FCF.<br />

! Safety Report on “Authorisation of Stage-3 of Turamdih<br />

Mines i.e., “Mining and Ore Transportation to Jaduguda<br />

Mill” was discussed and USC recommended Stage 3 of<br />

Turamdih mine with some stipulations. The proposal<br />

was further discussed in SARCOP and <strong>Board</strong> meetings.<br />

Subsequently, authorisation was issued for Turamdih<br />

mine for ‘Mining and Ore Transportation to Jaduguda<br />

mill’ at a maximum rate of 550 TPD with certain<br />

stipulations.<br />

! Safety Committee reviewed the Environmental Impact<br />

Assessment (EIA) report, Safety Report, ventilation and<br />

radiological assessment of the proposal for authorisation<br />

for the development of Bagjata mine. These reports<br />

were further deliberated in the meetings of ACPSR-FCF,<br />

which recommended to AERB the authorisation of the<br />

‘Development Stage’ of Bagjata Mine with certain<br />

stipulations. Subsequently, authorisation for<br />

development of the first stage for Bagjata Mine, UCIL<br />

was issued.