Project Profile<br />

For more Information<br />

contact:<br />

Michael Grimley<br />

Business Manager<br />

GSA Ltd<br />

+44 (0)1724 275200<br />

mgrimley@GSA-Ltd.co.uk<br />

Or visit our website:<br />

www.gsa-ltd.co.uk<br />

Yemen Oil Field Developments<br />

Crude Processing Facility (CPF) Improvements<br />

<strong>The</strong> scope of this project was to<br />

condition the produced water<br />

from an existing field (operated<br />

by the end client DNO) for<br />

reinjection underground into the<br />

reservoir. <strong>The</strong> existing CPF had<br />

not been built to handle the large<br />

quantities of water which <strong>are</strong><br />

currently being extracted. To<br />

handle this water GSA have<br />

designed a system using a<br />

combination of Skim Tanks,<br />

Surge Tank, Polishing Filters<br />

(future), and Injection Pumps with<br />

the required utility services.<br />

In addition GSA have engineered the expansion of the CPF including a manifold,<br />

two three phase separators along with a suitable fl<strong>are</strong> system that can cope with<br />

the maximum gas flow from the wells.<br />

New Field Development<br />

A new site is being developed by our<br />

client DNO for which GSA <strong>are</strong><br />

engineering the crude production<br />

facility. This is to replace an existing<br />

temporary exploration treatment plant<br />

and will utilize some of the services.<br />

<strong>The</strong> project requires the transport of<br />

the product crude to another<br />

production facility for final separation<br />

of the crude before export. In addition<br />

the gas extracted is to be used for fuel<br />

gas on the CPF site and at another<br />

site 23km away. <strong>The</strong> gas will require conditioning prior to this, including<br />

dehydration before entry into the transport pipeline. <strong>The</strong> remaining gas will require<br />

suitable fl<strong>are</strong> systems.<br />

Prior to the installation of the temporary facility, GSA also carried out initial<br />

engineering of the CPF including extensive simulation modelling using different<br />

throughput rates and pressures from the field. <strong>The</strong> client is currently implementing<br />

this work.<br />

Test Facilities or Full Capacity Crude Processing Facilities; GSA has the<br />

capability and experience to develop suitable sites cost effectively and<br />

quickly.