22.12.2012 Views

General Terms of Sale and Delivery Last updated ... - Licefa

General Terms of Sale and Delivery Last updated ... - Licefa

General Terms of Sale and Delivery Last updated ... - Licefa

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Preisstellung: ab Werk inkl. Verpackung; zzgl. ges. MwSt., Zahlungsbedingungen: Innerhalb 14 Tagen 2% Skonto; 30 Tage netto.<br />

Es gelten unsere umseitig abgedruckten allgemeinen Lieferbedingungen, Anderslautenden Bedingungen wird hiermit widersprochen.<br />

Kleinmengenzuschlag: 20% unter EUR 100,– Warenwert, + EUR 15,–, unter EUR 25,– Warenwert. Wir liefern RoHS-konform.<br />

Lemgoer Straße 11<br />

D-32108 Bad Salzuflen<br />

Fon +49 (0) 52 22 . 28 04-0<br />

Fax +49 (0) 52 22 . 28 04-35<br />

USt.-IdNr. DE 124610144<br />

<strong>Licefa</strong> Kunstst<strong>of</strong>fverarbeitung<br />

GmbH & Co. KG<br />

Amtsgericht Lemgo HRA 347<br />

Sitz: Bad Salzuflen<br />

St.-Nr. 313-5765-0100<br />

Pers. haft. Gesellschafter:<br />

<strong>Licefa</strong> Kunstst<strong>of</strong>fverarbeitung GmbH<br />

Amtsgericht Lemgo HRB 146<br />

Sitz: Bad Salzuflen<br />

Gerichtsst<strong>and</strong> Lemgo<br />

Erfüllungsort: Bad Salzuflen<br />

Geschäftsführer:<br />

Dipl.-Kfm. Heinrich Horstmann<br />

Dipl.-Kfm. Hans G. Schmidt<br />

Kunstst<strong>of</strong>ftechnik + Verpackung<br />

shall however not enter into effect prior to complete clarification <strong>of</strong> all details <strong>of</strong> performance <strong>and</strong> the<br />

<strong>Licefa</strong> . Postfach 3420 . D-32078 Bad Salzuflen<br />

receipt <strong>of</strong> any potentially agreed down-payment. It shall start anew if Purchaser requests that changes<br />

to his order be carried out, i.e. subject to the confirmation <strong>of</strong> such modification.<br />

2. If the agreed delivery deadline can not be met due to Supplier’s own fault <strong>and</strong> on condition that the<br />

latter did not act willfully or with gross negligence. Purchaser, after a reasonable period <strong>of</strong> extension,<br />

shall be entitled, to the exclusion <strong>of</strong> any further claims, to dem<strong>and</strong> compensation for delayed comple-<br />

tion or to withdraw from the contract. The compensation shall be limited to a maximum <strong>of</strong> 5 % <strong>of</strong> the<br />

value <strong>of</strong> te part <strong>of</strong> the delivery which was not performed according to contract. Such withdrawal shall<br />

be excluded if Purchaser himself is in default <strong>of</strong> acceptance. Purchaser’s other statutory claims <strong>and</strong><br />

rights shall not be affected thereby.<br />

3. Reasonable part shipments as well as acceptable deviations from the order quantities up to +/-<br />

10% shall be permissible.<br />

4. In case <strong>of</strong> call-<strong>of</strong>f orders without any agreed duration, production lot sizes or acceptance dates,<br />

Supplier shall be entitled to dem<strong>and</strong>, at the latest 6 months after acknowledgement <strong>of</strong> the order a<br />

binding promise in this respect. If Purchaser fails to meet said dem<strong>and</strong> within three weeks, Supplier<br />

shall be entitled to set a two-week extension period or to withdraw from the contract after its expiry<br />

<strong>and</strong>/or to claim compensation. Unless otherwise agreed, the maximum duration shall be 12 months<br />

after order confirmation.<br />

5. If Purchaser fails to meet his acceptance obligation, Supplier, without prejudice to any other rights,<br />

shall not be bound to any self-help sale regulations but shall be entitled to freely sell the delivery item<br />

after prior notification <strong>of</strong> Purchaser.<br />

6. In case <strong>of</strong> any events <strong>of</strong> force majeure Supplier shall be entitled to postpone shipment for the dura-<br />

tion <strong>of</strong> the disturbance <strong>and</strong> o the extent <strong>of</strong> their effect, or to completely or partially withdraw from the<br />

unfulfilled portion <strong>of</strong> the contract. Lack <strong>of</strong> raw materials or energy, strikes, lockouts <strong>and</strong> other unforeseeable<br />

or unavoidable circumstances such as operating breakdowns shall equally be regarded as<br />

force majeure, preventing Supplier despite reasonable efforts from carrying out timely delivery; Supplier<br />

shall be required to provide according evidence. This shall also apply if said disturbances occur<br />

during such delay or because <strong>of</strong> a sub-supplier. Purchaser shall be entitled to request Supplier<br />

to declare within a period <strong>of</strong> two weeks whether or not he intends to withdraw from the contract or to<br />

deliver within a reasonable extension <strong>of</strong> time. Failing to receive any such declaration, Purchaser shall<br />

PE: 1 = 1 Stück<br />

3 = 100 Stück<br />

Bankverbindung:<br />

Sparkasse Lemgo<br />

BLZ 482 501 10<br />

Kto. 192 57<br />

Swift-Code: WELADED1 LEM<br />

IBAN DE66 4825 0110 0000 019257

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!