27.05.2021 Views

BUS 430 OPERATIONS MANAGEMENT WEEK 10 QUIZ WITH ANSWERS (2021)

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

BUS 430 OPERATIONS MANAGEMENT WEEK 10 QUIZ WITH

ANSWERS (2021)

BUY HERE⬊

https://www.seetutorials.com/bus-430-

operations-management-week-10-quizwith-answers-2021/

Strayer BUS 430 Week 10 Quiz Answers (2021)

1. In applying Six Sigma to services, the four key measures of performance

2. Six Sigma efforts have use all of the following concepts and

3. In the SERVQUAL instrument for measuring service quality, the concept of

4. A tool to help focus on the most significant problems is

5. Which of the following is not considered part of Total Quality?

6. ISO 9000:2000 principles consist of all of the following except

7. The recognized benchmark for Six Sigma implementation is

8. Which of the following is not directly related to W. Edwards Deming?

9. In reference to quality cost classifications, training and equipment design

10. Which does not fit with Six Sigma implementation?

11. Evaluating the trade-offs between the costs of detecting and replacing a

12. Common cause variation is

13. Quality at the source means that quality is controlled by

14. Honda wants to monitor the number of blemishes (scratches, blisters, etc.)

15. Ritz-Carlton Hotel Company uses which one of the following methods to

16. If no special causes affect the output of a process, we say that the process

17. A bottling process sometimes results in overfills or underfills. Overfills are

18. Which of the following is most closely related to Statistical Process Control

19. Statistical calculations will show that if p = .01, then the sample size

20. Which is not related to a discrete metric?

21. c-charts

22. Common cause variation

23. Indications in a control chart of an out-of-control situation include all of the

24. Which of the following suggests a process that is not in control?

25. Testing whether a computer boots up the first time is an example of

26. p-charts

27. If one was monitoring the average time to load a web page, the chart to

28. The center line (p-bar) for a p-chart is 0.50 with an UCL = 0.70 and a LCL

29. To monitor the fraction of printed circuit boards that do not pass a

30. A supplier is producing a machined part for the transmission of your

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!