ARLINGTON COUNTY<br />

Under Construction<br />

North Glebe Road over Pimmit Run<br />

Bridge Rehabilitation<br />

In Design<br />

South Abingdon Street/34th Street<br />

South over I-395 Bridge Rehabilitation<br />

Bridge rehabilitation to include replacement or repair of bridge<br />

beams, deck, abutments, piers, guardrail, along with drainage<br />

improvements. Barriers and railings will also be replaced along<br />

bicycle and pedestrian connections to trails.<br />

Estimated cost: $7.7 million<br />

Coming Soon<br />

Boundary Channel Drive at I-395<br />

Interchange Improvements<br />

This project will rehabilitate the South Abingdon Street/34th<br />

Street South bridge over I-395. Preliminary design plans include<br />

resurfacing the concrete bridge deck and closing deck joints,<br />

repairing concrete piers and abutments, adding protective<br />

concrete barriers adjacent to piers, extending and adding<br />

concrete in-fill walls between piers and replacing bearings. The<br />

existing sidewalks on both sides of the bridge will remain and<br />

the bridge bicycle lanes will be restriped as part of the project.<br />

The bridge was originally built in 1970 and rehabilitated in<br />

1994. Construction is expected to begin in 2023.<br />

Estimated cost: $7.9 million<br />

A Design-Build contract was awarded in June <strong>2021</strong> to improve<br />

traffic operations for all users at the Boundary Channel Drive<br />

at I-395 interchange. The project will reduce Boundary Channel<br />

Drive from four lanes to two in order to construct an eight-footwide<br />

eastbound sidewalk and a twelve-foot-wide westbound<br />

shared-use path, install roundabouts just west and east of<br />

I-395, reconfigure the ramps between I-395 and Boundary<br />

Channel Drive and add crosswalks. The project will also add a<br />

new shared-use path linking the Mount Vernon Trail to Long<br />

Bridge Park. The project is in the design phase with construction<br />

anticipated to begin in summer 2022.<br />

Estimated cost: $19.6 million<br />

South Abingdon Street/34th<br />

Street South Over I-395 Bridge<br />

Rehabilitation<br />

TRANSPORTATION UPDATE // PUBLISHED OCTOBER <strong>2021</strong> 19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!