FAIRFAX COUNTY<br />
Fox Mill Road and Pinecrest Road<br />
Intersection Improvements<br />
Franconia Road and Rose Hill Drive<br />
Intersection Improvements<br />
A temporary traffic signal was installed this summer at the<br />
intersection of Fox Mill Road and Pinecrest Road. This project<br />
will upgrade the traffic signal, construct left-turn lanes on<br />
northbound and southbound Fox Mill Road, add four crosswalks,<br />
reconstruct sidewalks and curb ramps, and construct an eightfoot-wide<br />
walkway and curb ramp at the southeast corner of<br />
the intersection. Construction is anticipated to begin in 2024.<br />
Estimated cost: $5.7 million<br />
Intersection improvements at Franconia Road and Rose Hill<br />
Drive aim to improve safety for all modes, including drivers,<br />
bicyclists and pedestrians. The project will construct a traffic<br />
signal flashing yellow arrow on westbound Franconia Road,<br />
signalized crosswalk on Franconia Road on the western side<br />
of the intersection and ADA pedestrian signal and curb ramp<br />
upgrades. Right of way work began in May and construction is<br />
anticipated to begin in fall 2022.<br />
Estimated cost: $475,000<br />
Fairfax County Parkway Widening and<br />
Popes Head Road Interchange<br />