PROJECT UPDATES<br />

LOUDOUN COUNTY<br />

On June 17, <strong>2021</strong>, Ray Kollock, construction manager for the John G. Lewis Memorial Bridge project passed<br />

away. His colleagues continue to mourn him alongside his family.<br />

Under Construction<br />

John G. Lewis Memorial Bridge<br />

Rehabilitation<br />

Route 7 and Battlefield Parkway<br />

Interchange<br />

Rehabilitation of the historic truss bridge that carries Featherbed<br />

Lane over Catoctin Creek. The existing bridge will be installed<br />

above a new beam and timber deck and new bridge pier with<br />

upgraded railings.<br />

Estimated cost: $4.8 million<br />

Construction of a grade-separated interchange, a shared-use<br />

path and a sidewalk along Battlefield Parkway, addition of<br />

auxiliary lanes on Route 7, addition of second left-turn lanes<br />

from southbound Battlefield Parkway and northbound River<br />

Creek Parkway to Fort Evans Road as well as the removal of<br />

the signal at Route 7 and Cardinal Park Drive. The interchange<br />

opened to traffic in June <strong>2021</strong>.<br />

Estimated cost: $77.3 million<br />

TRANSPORTATION UPDATE // PUBLISHED OCTOBER <strong>2021</strong> 31