Technical Specification of Roof Top Tower of 12, 15, 18 & 21m height
Technical Specification of Roof Top Tower of 12, 15, 18 & 21m height
Technical Specification of Roof Top Tower of 12, 15, 18 & 21m height
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2.4.2 Bill <strong>of</strong> Material for Foundation for <strong>12</strong> Metres Ro<strong>of</strong> <strong>Top</strong> <strong>Tower</strong><br />
Sl. No. DESCRIPTION QTY NO T/QTY<br />
1. RCC B2 0.3<strong>15</strong> 2 0.63<br />
2. RCC B1 0.483 2 0.97<br />
3. RCC CL 0.036 4 0.14<br />
Quantity (In Cubic Metres) 1.74<br />
Reinforcement Details<br />
1. REINFORCEMENT B1 Ø 20 MM 4.85 16 191.52<br />
2. REINFORCEMENT B1 Ø 20 MM 3.75 16 148.08<br />
3. BEAM JUCTION Ø 25 MM 8.<strong>15</strong>2 4 80.48<br />
4. COLUMN EXTENTION Ø 16 MM 0.8 24 30.34<br />
Stirrups<br />
1. STIRRUPS Ø 8 MM BEAM 1 <strong>12</strong>6.5 2 99.90<br />
2. STIRRUPS Ø 8 MM BEAM 2 96.2 2 75.97<br />
3. STIRRUPS Ø 8 MM CL 10.4 4 16.43<br />
4. STIRRUPS BEAM JUCTION Ø 8 MM 10.4 4 16.43<br />
Total Weight <strong>of</strong> Reinforcement Excluding Binding Wire 659.14<br />
1. BINDING WIRE 5%<br />
UTL/RTT/02-01 OCT 2011 Page 26 <strong>of</strong> 31<br />
32.96<br />
Total Weight <strong>of</strong> Reinforcement (Including Stirrups & Binding Wire) 692.10<br />
TOTAL RCC (In Cubic Metres) 1.74<br />
TOTAL REINFORCEMENT (In Kgs.) 692.10