security profile for openadr - Open Smart Grid - OpenSG - UCA ...
security profile for openadr - Open Smart Grid - OpenSG - UCA ...
security profile for openadr - Open Smart Grid - OpenSG - UCA ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
220<br />
221<br />
222<br />
223<br />
224<br />
225<br />
226<br />
227<br />
228<br />
229<br />
230<br />
231<br />
232<br />
233<br />
234<br />
235<br />
236<br />
237<br />
238<br />
239<br />
240<br />
241<br />
242<br />
The essential roles involved in <strong>Open</strong>ADR are shown in Figure 3 – Role Interaction<br />
Diagram. This diagram represents the roles (defined in Section 2.2) as rounded<br />
rectangles. Rectangles that include other rectangles indicate that a role is a composition<br />
or aggregation of other roles. For example, a DR Resource is comprised of multiple<br />
assets. A rectangle with multiple roles indicates that a single actor can act in multiple<br />
roles in the <strong>Open</strong>ADR process. For example, the same actor can be a DR Resource <strong>for</strong> on<br />
set of interactions, and a DR Controlling Entity <strong>for</strong> another set of interactions.<br />
DR Controlling Entity<br />
DR Resource/Asset<br />
SECURITY PROFILE FOR OPENADR<br />
Figure 4 – DR Event Activity Diagram<br />
A high level Activity Diagram of the <strong>Open</strong>ADR Event process is shown in Figure 4 – DR<br />
Event Activity Diagram.<br />
The detailed steps of all <strong>Open</strong>ADR processes in scope are defined in detailed Use Cases<br />
in Section 2.4. The major steps are outlined as:<br />
1. A DR Resource communicates capabilities, constraints, status and per<strong>for</strong>mance<br />
characteristics to a DR Controlling Entity.(Register DR Resource)<br />
2. A DR Controlling Entity decides to call an event (based on grid conditions)<br />
o Determine what objectives to meet during the Event schedule<br />
3. Execution of the Event<br />
o Determine which DR Resources and participation schedules to apply to<br />
meet those objectives<br />
o Send Signal(s) to the DR Resources<br />
o Monitor what is going on (Feedback from DR Resources)<br />
Version – 0.02<br />
<strong>UCA</strong> International Users Group December 15, 2011<br />
18