25.12.2012 Views

security profile for openadr - Open Smart Grid - OpenSG - UCA ...

security profile for openadr - Open Smart Grid - OpenSG - UCA ...

security profile for openadr - Open Smart Grid - OpenSG - UCA ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

470<br />

471<br />

472<br />

473<br />

474<br />

475<br />

476<br />

477<br />

478<br />

479<br />

480<br />

481<br />

482<br />

483<br />

484<br />

485<br />

486<br />

487<br />

488<br />

489<br />

490<br />

491<br />

492<br />

493<br />

494<br />

495<br />

496<br />

497<br />

498<br />

499<br />

500<br />

501<br />

Use Case 3: DR Controlling Entity Notifies DR Resource of DR Event –<br />

(Broadcast)<br />

Use Case Description: This interaction is used to dispatch DR Resources. The initiator<br />

of the interaction is the DR Controlling Entity. The initiating event message is directed to<br />

multiple DR Resources. Identification of the applicable Resources could be one of<br />

several groups such as geographic location. The dispatch can convey an objective, price<br />

or direct load control signal.<br />

The objective is expressed as a load or generation value (e.g. shed 100kW) <strong>for</strong> the load<br />

<strong>profile</strong> of the DR Resource <strong>for</strong> a specific interval or series of intervals.<br />

The price message expresses the price <strong>for</strong> an interval or intervals as an absolute real time<br />

price or a price relative to the current tariff price.<br />

The direct load control message includes an on/off or set point (e.g. set thermostat to<br />

80 degrees).<br />

The Event Notification message can contain one or more of the three signal types.<br />

Preconditions:<br />

• The DR Resource and DR Controlling Entity have all of the necessary network<br />

connections available.<br />

Minimal Guarantees:<br />

• The DR Controlling Entity does not reveal any in<strong>for</strong>mation that could allow<br />

another party to present false identification, or intercept or alter future messages<br />

sent to the DR Resource.<br />

• The DR Resource does not process any invalid data.<br />

Success Guarantees:<br />

• The DR Resource receives price notification and is able to respond and per<strong>for</strong>m<br />

load-shed or generation based on the current price conditions and best economic<br />

interests of the DR Resource.<br />

Trigger:<br />

The trigger <strong>for</strong> this use case could be from multiple sources depending on the span of<br />

control of the DR Controlling Entity and the DR Program definition. It could be a manual<br />

or automated process.<br />

SECURITY PROFILE FOR OPENADR<br />

Version – 0.02<br />

<strong>UCA</strong> International Users Group December 15, 2011<br />

28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!