08.05.2012 Views

Shareholders, Supervisory Board and management bodies ...

Shareholders, Supervisory Board and management bodies ...

Shareholders, Supervisory Board and management bodies ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

02<br />

Annual Report 2008<br />

Management report<br />

Business performance<br />

in 2008<br />

30<br />

Annual Report 2008<br />

2.2.4 Investment<br />

Total investment in intangible <strong>and</strong> tangible assets during the 2008 financial year amounted to EUR<br />

8.36m — EUR 0.53m up on the previous period (2007: EUR 7.83m).<br />

Of this EUR 0.51m went to intangible assets, mostly software licences (2007: EUR 0.80 m). Additions<br />

to l<strong>and</strong> <strong>and</strong> buildings totalled EUR 2.02m (2007: EUR 1.69m) while EUR 4.27m (2007: EUR<br />

3.67m) was invested in technical equipment. A further EUR 1.1m (2007: EUR 1.09m) was devoted<br />

to fixtures, furniture <strong>and</strong> office equipment, while EUR 0.46m (2007: EUR 0.59m) in prepayments<br />

<strong>and</strong> assets in the course of construction was capitalised.<br />

Additions to financial assets were EUR 0.11m, compared to EUR 4.0m in 2007, when mature<br />

obligations of EUR 2.00m were reinvested, <strong>and</strong> EUR 2.01m arose from additions to <strong>and</strong> reversals<br />

of the same transaction.<br />

2.2.5 Liquidity <strong>and</strong> financial position<br />

There were net cash inflows of EUR 11.79m during the 2008 financial year, following inflows of EUR<br />

8.13m in the previous period. The positive cash flow resulted chiefly from cash flow from operating<br />

activities, <strong>and</strong> in particular, a reduction in working capital.<br />

Cash in h<strong>and</strong> <strong>and</strong> at bank of EUR 32.41m as at 31 December 2008 included EUR 10.63m in EU<br />

coordination funds, national foundation money <strong>and</strong> project related prepayments.<br />

31. Dec. 2007 31. Dec. 2007 2007<br />

FTE People Average<br />

Austrian Research Centers GmbH – ARC 624.5 672 620.0<br />

arsenal research (inc. civil servants assigned to U&L) 173.2 176 168.9<br />

Advanced Computer Vision GmbH (ACV) 6.9 7 9.7<br />

Nuclear Engineering Seibersdorf GmbH 50.8 53 48.8<br />

ARC Leichtmetallkompetenzzentrum<br />

Ranshofen GmbH 31.7 34 34.9<br />

ECHEM GmbH 2.8 4 2.4<br />

ECHEMplus employees 26.3 30 24.9<br />

Group 916.2 976 909.6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!