ECOLOGICAL AND ECONOMICAL CONSTRUCTION AND RENOVATION<br />
ACT RESPONSIBLY<br />
EnEV 2009 German Energy Saving Ordinance:<br />
<strong>Co</strong>mpliance without requiring additional measures<br />
Energy reduction measures put high demands on<br />
new buildings and renovation of older structures.<br />
While energy-reducing measures are required<br />
by several of the metal roofi ng systems that<br />
are currently available on the market in order to<br />
fulfi ll legal requirements, <strong>RIB</strong>-<strong>ROOF</strong> metal roofi ng<br />
systems need no further adjustment. A <strong>RIB</strong>-<strong>ROOF</strong><br />
surface has optimal values concerning thermal<br />
Technology and progress in harmony with nature<br />
This has always been our goal for supply and<br />
disposal which is why our products not only<br />
always use state-of-the-art technology, but are<br />
integrated with quality and our own environmental<br />
management system. We are continually<br />
developing our manufacturing technology further<br />
in order to achieve a longer life for our products<br />
along with optimal energy recovery, therefore<br />
transmittance, without any further complicated<br />
additional measures such the installation of<br />
thermoclips serving as thermal bridges, as recently<br />
shown by studies from the “Forschungsinstitute für<br />
Wärmeschutz e.V.”.<br />
Buildings with <strong>RIB</strong>-<strong>ROOF</strong> metal roofi ng system<br />
are good for both the environment and your bank<br />
account.<br />
thickness of insulation 180 mm 180 mm for 0.240 W/m 2 K<br />
description of construction<br />
<strong>RIB</strong>-<strong>ROOF</strong> Speed 500<br />
installation by using standard<br />
clips onto a double layer<br />
wooden underconstruction<br />
construction 1*<br />
<strong>RIB</strong>-<strong>ROOF</strong> Speed 500<br />
by using a clip border onto a<br />
walkable heat insulation<br />
construction 2<br />
<strong>RIB</strong>-<strong>ROOF</strong> by using standard clips<br />
onto double layer Z-profi les<br />
construction 3<br />
onto a single layer Z-profi le<br />
construction 4<br />
* calculation according to DIN EN ISO 6946<br />
(adjustment of<br />
calculation B1-17/97)<br />
B = 1.20 m<br />
Heat transfer<br />
coeffi cient for the<br />
quiet areas<br />
Heat transfer<br />
coeffi cient including<br />
thermal bridges<br />
avoiding risks to the environment.<br />
The <strong>Zambelli</strong> company was awarded with<br />
the Bavarian State Prize in 2004 which<br />
was a successful confi rmation of our<br />
responsible way we deal with<br />
nature and environmental<br />
resources.<br />
required thickness<br />
of insulation to<br />
reach EnEV 2009<br />
chart 1; line 4a<br />
W/(m 2 x K) W/(m 2 x K) mm<br />
B = 1.19 m 0.189 0.204** 160<br />
B = 1.80 m 0.188 0.202** 160<br />
B = 1.80 m 0.189 0.229** 180<br />
B = 1.20 m 0.189 0.262** 200<br />
**Source: FIW 18.03.2010 each value is calculated with the heat insulation 180 mm and WLG 035<br />
(exception: walkable heat insulation for construction 2 is WLG 040)<br />
0.189 0.432** 250<br />
23