02.01.2013 Views

montageanleitung / short instruction manual - ABC Products

montageanleitung / short instruction manual - ABC Products

montageanleitung / short instruction manual - ABC Products

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MONTAGEANLEITUNG /<br />

SHORT INSTRUCTION MANUAL<br />

37. Mit Kontermuttern sichern /<br />

Fix with screw-nut<br />

40. Steckverbindung am Outrigger<br />

positionieren /<br />

Bring the wire in the right position<br />

43. Seil am Kopfsegment einhaken/<br />

Hook in the wire on the top segment<br />

38. Seitliches Outriggerseil mit Endsegment<br />

verbinden /<br />

Connect wire with end segment<br />

41. Steckverbinder sicher mit Outrigger<br />

verbinden /<br />

Connect the wire with the outrigger securely<br />

44. Spannschloss Segment 1 spannen /<br />

Close rod strainer of segment 1<br />

39. Haken des Seils sicher einhängen /<br />

Hook in the clamp securely<br />

42. Seil “kurz” an Segment No.1 sicher<br />

einhaken / Hook the <strong>short</strong> wire in the clamp<br />

of segment No. 1 securely<br />

45. Klemmstück Seil mit Outrigger verbinden<br />

/ Connect wire (clamping piece) with<br />

outrigger<br />

Kurzanleitung / Short Instruction Manual - Crane 120 5 von / of 8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!