net asset value (nav) - Primera Energy Resources Limited
net asset value (nav) - Primera Energy Resources Limited
net asset value (nav) - Primera Energy Resources Limited
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PRIMERA ENERGY RESOURCES LTD LTD.<br />
(PERL)<br />
CORPORATE PRESENTATION<br />
August 2012
Legal Disclaimer and General Notes<br />
LLegal l Di Disclaimer l i<br />
This presentation contains forward-looking financial and operational information<br />
including earnings, cash flow, debt levels, production and capital expenditure<br />
projections projections. These projections are based upon the Company’s Company s expectations and are<br />
subject to a number of risks and uncertainties that are generally related to the<br />
industry and could materially affect projected results. The risks include, but are not<br />
limited to, future commodity prices, exchange rates, interest rates, geological risk,<br />
reserves risk, political risk, product demand and transport restrictions<br />
General Notes<br />
(i) CConversion i rate t (US$ tto CDN$) of f $1 $1.00 00 usedd th throughout h t thi this presentation t ti<br />
(ii) Economic analyses done at WTI Forecast excepted by 15 March 2012 (by AJM)<br />
unless otherwise stated<br />
(iii) The calculations of barrels of oil equivalent ("boe") ( boe ) are based on a conversion rate<br />
of six thousand cubic feet ("mcf") of natural gas to one barrel of crude oil. Boe's<br />
may be misleading, particularly if used in isolation. A boe conversion ratio of 6 mcf:<br />
1 bbl is based on an energy equivalency conversion method primarily applicable at<br />
TSX-V: PTT<br />
the burner tip and does not represent a <strong>value</strong> equivalency at the wellhead<br />
2<br />
PRIMERA ENERGY RESOURCES LTD.
Corporate Overview<br />
<strong>Primera</strong> <strong>Energy</strong> <strong>Resources</strong> Ltd. (“PERL”) - TSX-V Exchange (Symbol: “PTT”)<br />
� International exploration and development opportunities with “in-country” experience and<br />
established contacts in Trinidad<br />
� One (1) producing property with significant upside potential<br />
� Current production 632 bopd<br />
� 16.2% working interest in the highly prospective Cory Moruga Block ‘E”, Trinidad (carried for<br />
2 wells - both wells cased, , encountered objectives j with oil shows. Exploration p activities are<br />
in progress with the Sidetracking and testing of Firecrown-1 and drilling of Green Hermit-1<br />
� Multi-disciplined and experienced management team - proven track record<br />
� PERL has the ability to source international deal flow and evaluate high quality international<br />
plays<br />
TSX-V: PTT 3<br />
PRIMERA ENERGY RESOURCES LTD.
Corporate Structure<br />
OPTIMAL ST. LUCIA LTD.<br />
(OSLL)<br />
ST. LUCIA<br />
100%<br />
OPTIMAL SERVICES LTD.<br />
(OSL)<br />
TRINIDAD & TOBAGO<br />
100%<br />
� PERL is a public company trading on the TSX-V<br />
� PERL owns 100% of the equity of OSSL.<br />
� PERL owns 100% of the equity of Optimal Bahamas<br />
� OSL is a wholly owned subsidiary of OSLL, and is engaged in Petroleum<br />
operations in Trinidad & Tobago.<br />
� PERL has 16.2% WI in the Cory / Moruga block,<br />
PRIMERA ENERGY RESOURCES LTD.<br />
(PERL)<br />
CANADA<br />
(TSX VENTURE LISTED)<br />
OPTIMAL SERVICES BAHAMAS LTD.<br />
BAHAMAS<br />
100%<br />
TSX-V: PTT 4<br />
CORY MORUGA BLOCK ‘E’<br />
TRINIDAD & TOBAGO<br />
16.2%<br />
PRIMERA ENERGY RESOURCES LTD.
Directors and Management<br />
Board of Directors:<br />
Philip EE. Collins Collins, PP.Geol. Geol Chairman<br />
Geoffrey Leid, LLB Chief Executive Officer<br />
Trevor Wong-Chor, Wong Chor, LLB Corporate Secretary<br />
Gordon Harris, P.Eng., MBA Director<br />
Ian Anthony, LLB, LLM, CEPMLP Director<br />
Ron Bryant, P Eng Director<br />
KKey MManagement: t<br />
Geoffrey Leid, LLB Chief Executive Officer<br />
St Stephen h Austin, A ti CA Chi Chief f Fi Financial i l Offi Officer<br />
TSX-V: PTT 5<br />
PRIMERA ENERGY RESOURCES LTD.
Corporate Snapshot<br />
Exchange (Stock Symbol): TSX-V PTT<br />
Common Shares Outstanding (MM): 55.6<br />
Stock Options Outstanding (MM): 52 5.2<br />
Warrants Outstanding (MM): 0.0<br />
Shares Fully Diluted (MM): 57.1<br />
One-Year Trading Range (CDN$): 0.11 – 0.32<br />
Current Production: 632 BOPD<br />
Net Debt: Nil<br />
Working Capital ~ 0.2 MM (as of June 30, 2012)<br />
Cash in Bank 3.0 MM<br />
TSX-V: PTT<br />
6<br />
PRIMERA ENERGY RESOURCES LTD.
Current Net Asset Value (NAV) - CDN$<br />
NAV<br />
ASSETS Before Tax After tax<br />
$ $<br />
Reserves: Proved + Probable, PV 10% 49,110,000<br />
(as at December 31, 2011)<br />
Seismic – Cory Moruga 2,700,000<br />
51,810,000<br />
Working Capital (June 30, 2012) 200,000<br />
NET ASSETS 53,666,000<br />
Common shares outstanding 57,114,750<br />
Fully Diluted 57,114,750<br />
NET ASSET VALUE (NAV) 0.93<br />
TSX-V: PTT<br />
Block WD-4 reserves not booked because of Lease Operatorship arrangement with the Petroleum Company of Trinidad<br />
and Tobago (Petrotrin)<br />
7<br />
PRIMERA ENERGY RESOURCES LTD.<br />
7
Regional Location Map: Trinidad & Tobago<br />
TSX-V: PTT 8<br />
Trinidad & Tobago<br />
PRIMERA ENERGY RESOURCES LTD.
Location Map - Operations<br />
Undeveloped<br />
Producing<br />
Office<br />
TSX-V: PTT<br />
Block WD-4<br />
Trinidad<br />
Cory Moruga Block<br />
9<br />
PRIMERA ENERGY RESOURCES LTD.
Background on Trinidad and Tobago’s (TT) Oil & Gas Industry<br />
• Proven prolific hydrocarbon basin:<br />
Oil: Onshore 50-300 bopd/well<br />
Offshore 5,000-15,000 bopd/well<br />
Trinidad Activity Map (2010)<br />
Canadian Operators in Area<br />
Gas: Onshore 5-60 MMscf/d/well Block 22 0.6-<br />
Offshore 50-150 MMscf/d/well<br />
12 12.TCFG TCFG<br />
• One of the largest exporters of LNG to<br />
USA (~2 Bcf/d gas) - production capacity<br />
15MMTA*<br />
• World scale methanol plants - production<br />
capacity over 4MMTA*<br />
• TT one of the world’s largest urea and<br />
ammonia producers<br />
• Well developed metals sector<br />
• Stable government and British-based rule<br />
of law - Democracy<br />
• Potential for large discoveries both<br />
onshore and offshore<br />
* MMTA - Million Metric Tonnes per Annum<br />
TSX-V: PTT<br />
20 TCF of<br />
Proven Gas<br />
Reserves<br />
Block<br />
WD-4<br />
10<br />
5 TCF of<br />
Proven Gas<br />
Reserves<br />
Parex <strong>Resources</strong>,<br />
Niko <strong>Resources</strong>,<br />
Central Range Block<br />
Cory<br />
Niko <strong>Resources</strong><br />
Moruga ‘E’ E Guayaguayare Block<br />
Niko <strong>Resources</strong>,<br />
Voyager <strong>Energy</strong><br />
Block 2(ab)<br />
Columbus Sub-<br />
Basin, 30 TCF<br />
of 2P Gas<br />
Toucan<br />
0.5 TCF<br />
Niko<br />
<strong>Resources</strong><br />
Pot. 2.6<br />
TCFG<br />
Endeavor-1<br />
Bounty-1<br />
Victory-1<br />
Chachalaca<br />
>2TCF, 1,400 ft pay<br />
Loran<br />
5 TCF gas, 755 ft pay<br />
PRIMERA ENERGY RESOURCES LTD.
TSX-V: PTT 11<br />
CORY MORUGA BLOCK ‘E’<br />
(Offsetting Carapal Ridge Field)<br />
ONSHORE ONSHORE, TRINIDAD<br />
PRIMERA ENERGY RESOURCES LTD.
Location and Historical Block Data<br />
Working Interests <strong>Primera</strong> <strong>Energy</strong> <strong>Resources</strong> Ltd Ltd. 16 16.2% 2%<br />
Parex <strong>Resources</strong> (Trinidad) Ltd. 83.8% (Operator)<br />
State Exploration and Production License renewed in August 2007 (term: 25 years)<br />
Location: Southern Basin, Onshore Trinidad<br />
Acreage: 7,442 acres (gross)<br />
Wells drilled: 15 wells (drilled ( 1950’s), ), deepest p well Rochard-1 (11,535 ( , ft) )<br />
Formation depth: 3,500 ft to 10,000 ft<br />
Oil Gravity: 29-37 degree API<br />
Cumulative production: 113,677 BO (Dec. 1991)<br />
Seismic coverage: 85 sq km of full fold 3-D data (2007)<br />
Costs incurred to date (gross): approx approx. US$29 US$29.0MM 0MM (License payments payments, seismic seismic, studies studies,<br />
drilling, testing)<br />
Herrera prospect, with several other leads and prospects identified<br />
Carried on two (2) wells thru farm-out period (carry involved a 5% participating interest by<br />
PERL)<br />
TSX-V: PTT<br />
12<br />
PRIMERA ENERGY RESOURCES LTD.
Exploration Drilling Update<br />
SSnowcap-1 1 (fi (first t onshore h li light ht oil il di discovery iin 51 years): )<br />
• Well spudded 16 July 2010 and drilled to approved depth of 8,600 feet<br />
• Well pe<strong>net</strong>rated and encountered hydrocarbon bearing zones in both the primary and<br />
secondary objectives in the Herrera<br />
• Well testing completed in the primary zone of interest (hanging wall) in the Herrera formation<br />
- Initial rates up to 1,450 bopd (37 0API), gas at rates up to 6.2 MMcf/d<br />
- Well flowing since August 9th , 2012.<br />
TSX-V: PTT 13<br />
PRIMERA ENERGY RESOURCES LTD.
Exploration Drilling Update<br />
Firecrown-1:<br />
• First exploration well Firecrown-1 spudded 15 April 2010<br />
• The well was drilled to a depth 10,331 feet<br />
• Well pe<strong>net</strong>rated and encountered both the primary and secondary objectives in the Herrera<br />
formation, oil and gas shows<br />
- Primary objective 8,150 feet to 8,275 feet<br />
- Secondary objective 6,600 feet to 7,220 feet<br />
• C1 C1-C5 C5 (gas detector readings indicative of wet gas) present in both zones<br />
• Well deepened to 10,331 feet to explore lower formation prior to testing. Wellbore stability<br />
problems resulted in the deepened section being abandoned – no prospective horizons<br />
encountered<br />
• Severe mechanical problems precluded testing of potentially productive zones. Sidetrack<br />
• Sidetracking operation resume February 2012 of the well are in progress.<br />
• Reached a TD of 8315 feet on 12/4/2012.<br />
• Testing to commence shortly.<br />
Green Hermit-1<br />
• This well is programmed to be drilled to TVD 8,200 feet.<br />
• DDrilling illi completed. l t d TTesting ti to t commence shortly. h tl<br />
TSX-V: PTT<br />
14<br />
PRIMERA ENERGY RESOURCES LTD.
Snowcap I Production Update<br />
• Start Flow Rate August 9 th , 2012<br />
• Current Oil Production (bbl) 290.0<br />
• Current Gas Production (Mscf) 756.8<br />
(THP of 1123.0 psig on 8/32” choke, CHP of 59.0 psig)<br />
• Cumulative Oil Production (bbl) ( )<br />
2126.0<br />
• Cumulative Gas Production (Mscf) 5138.0<br />
• PERL’s Working interest (%) 16.2<br />
• PERL’s Oil Share (bbl) 344.4<br />
• PERL’s Gas Share (Mscf) 832.4<br />
TSX-V: PTT 15<br />
PRIMERA ENERGY RESOURCES LTD.
Cory Moruga Block ‘E’ - Offset Fields and Discoveries<br />
Penal/Barrackpore/<br />
Mandingo<br />
125mmbbls, 100 bcf<br />
Cory Moruga Block ‘E’<br />
TSX-V: PTT<br />
Snowcap -1<br />
iinitially iti ll ttested t d<br />
1450 bopd<br />
Moruga West<br />
12mmbbls<br />
Central Block<br />
(Carapal Ridge)<br />
92mmbbls *<br />
Firecrown -1<br />
Inniss/ Trinity<br />
20mmbbls, 11 bcf<br />
Catshill<br />
25mmbbls,<br />
27 bcf<br />
1 st well stratigraphic trap<br />
2 nd well structural trap<br />
Proposed stratigraphic trap<br />
* Gilbert Laustsen Jung and Associates Ltd (Source: www.epmag.com/archives/worldMap/3177)<br />
16<br />
Proposed structural trap<br />
Corosan-1 tested<br />
8.2 MMcf/d*<br />
Baraka East -1 tested<br />
27 MMcf/d MMcf/d, 1,020 1 020 bcpd bcpd*<br />
Baraka-1 tested<br />
22 MMcf/d, 660 bcpd*<br />
Carapal Ridge -1 tested<br />
50 MMcf/d, 1,500 bcpd*<br />
PRIMERA ENERGY RESOURCES LTD.
Cory Moruga Block ‘E’, Onshore Trinidad<br />
Economic/Sensitivity Analysis (Gross)<br />
KKey AAssumptions: ti GGross Revenue R Distribution Di ib i US$MM<br />
- Phase I work commitments ~ US$24.0MM Royalties 628.8<br />
- Drill 18 development wells ~ US$72.0MM<br />
to develop 60.0 MMBO<br />
- Pipeline and facilities ~ US$4.0MM<br />
- Net cost to <strong>Primera</strong> ~ US$ 17.3MM<br />
Pre-Profit Taxes (SPT, PPL, GFL)<br />
Annual Licence Payments<br />
Petroleum Profit Tax (PPT) & Levies<br />
792.3<br />
29 29.7 7<br />
1,591.8<br />
- Oil price US$85.00/bbl (realized average) Project Returns* 1,987.8<br />
- Opex/G&A average US$12 US$12.98/bbl 98/bbl<br />
Net to <strong>Primera</strong> (16.2%) ( )<br />
322.1<br />
Project Returns<br />
39%<br />
* Operating costs not deducted<br />
TSX-V: PTT<br />
Royalties<br />
13%<br />
Petroleum Profit<br />
Tax (PPT) &<br />
Levies<br />
31%<br />
17<br />
Pre-Profit Taxes<br />
(SPT, PPL, GFL)<br />
16%<br />
Annual Licence<br />
Payments ay e ts<br />
1%<br />
Sensitivity Analysis<br />
Field Size IRR<br />
25.0 MMBO 42%<br />
42.5 MMBO 61%<br />
60.0 MMBO 74%<br />
77.5 MMBO 87%<br />
PRIMERA ENERGY RESOURCES LTD.
TSX-V: PTT 18<br />
ONSHORE BLOCK WD-4<br />
GRANDE RAVINE, , TRINIDAD<br />
PRIMERA ENERGY RESOURCES LTD.
Field and Well Data<br />
Location: Southern Basin, Onshore Trinidad<br />
Acreage: 700 Acres<br />
Producing Formations: Forest and Cruse (Miocene)<br />
Formation Depth: 3,000 ft - 7,500 ft<br />
Average Porosity: 27%<br />
Average Permeability 250 md<br />
Net Pay: 100 - 280 ft<br />
Initial Production Rate: 80 - 100 BOPD/ well<br />
Average g Oil Gravity: y 23 degree g API<br />
Wells on production: 17<br />
Current production rate: 632 BOPD (August 15 th , 2012)<br />
Average decline rate: 10 10.7% 7% pp.a. a<br />
WD-4 remaining reserves (2P): 2.352 MMBO (AJM report expected April 25, 2012)<br />
Infill potential: CEC approval granted for 20 infill wells<br />
TSX-V: PTT<br />
13 locations initially identified<br />
(3 infill development wells,1 twin well, 7 sidetrack wells)<br />
19<br />
PRIMERA ENERGY RESOURCES LTD.
Production and Reserves<br />
Average BOPPD<br />
600<br />
500<br />
400<br />
300<br />
200<br />
100<br />
0<br />
TSX-V: PTT<br />
Daily Production<br />
June 2009 to July 2012<br />
December 2011 Net Present Value (CDN$ M)<br />
Category MBBLS Undiscounted Discounted Discounted<br />
BTax 10% BTax 10% ATax<br />
Proved 1,574 47,607 30,213 10,775<br />
Probable 778 30,626 13,628 6,246<br />
Total 22,352 352 78 78,233 233 43 43,840 840 17 17,020<br />
020<br />
* Reserves not booked because of Lease Operatorship arrangement with the Petroleum Company of Trinidad and Tobago (Petrotrin)<br />
20<br />
PRIMERA ENERGY RESOURCES LTD.
Block WD- 4, Grande Ravine<br />
Proposed Sidetrack Program - Offset Field and Well Data<br />
Upper Miocene Play Fairway<br />
(Forest & Cruse Formations)<br />
WD-<br />
4<br />
Block WD-3<br />
Avg. 745 BOPD<br />
PS-279: 270 bopd<br />
PS-238X: 140 bopd<br />
PS- 239X: 60 bopd<br />
PS-115<br />
DH-6<br />
PS-159X: 100 bopd<br />
PS-111RD: 92 bopd<br />
PS-173RD PS- 220x: 70 bopd<br />
DG-5 PS-244<br />
: 31 bopd<br />
PS- 554: 280 bopd<br />
PS-132RD: 33 bopd HO-8<br />
PS-439: 80 bopd PS-176<br />
PS-221<br />
PS-131RD: 67 bo<br />
Block WD-4<br />
632 BOPD<br />
Petrotrin well<br />
Block WD-4 well (drilled)<br />
Block WD-4 well (Proposed)<br />
Recently 21 drilled wells<br />
PS-182 Twin<br />
PS-182RD: 47 bopd<br />
PS-183STRD: 25 bopd<br />
Block WD-5/6<br />
Avg. 1,244 BOPD<br />
PS-211: 30 bopd<br />
PS-266RD 93 bopd<br />
N<br />
PS-263RD: 82 b<br />
PS-189: 450 bopd<br />
PS-213X: 30 bopd<br />
PS-95X: 250 bopd<br />
PS-252X: 200 bopd
WD-4 Economics (AJM - 13 locations)<br />
Project Returns*<br />
37.7%<br />
Petroleum Profit<br />
Tax (PPT) &<br />
Levies<br />
11.7%<br />
Annual Licence<br />
Payments<br />
0.3%<br />
Royalties<br />
41.5%<br />
SSupplemental pplemental<br />
Petroleum Tax<br />
(SPT)<br />
8.8%<br />
* Negotiated reduction in Over Riding Royalty rates with State oil company Petrotrin<br />
** Operating costs not deducted<br />
TSX-V: PTT 22<br />
Number of Wells: 13<br />
Total Reserves (MBO) per Well: 72<br />
Estimated Program Cost (CDN$M): 11,243<br />
Probability of success (%): >85<br />
NPV10% BT (CDN$M): (CDN$M) 88,754 754<br />
Gross Revenue Distribution US$M<br />
Royalties* 35,355.6<br />
Supplemental Petroleum Tax (SPT) 7,496.0<br />
Annual Licence Payments 234.1<br />
Petroleum Profit Tax (PPT) & Levies 9,985.4<br />
Project Returns** 32,123.1<br />
PRIMERA ENERGY RESOURCES LTD.
WD-4 Net Back Analysis Comparison<br />
2011 2012<br />
Parameters USD Netback % Parameters USD Netback%<br />
Actual Projected<br />
Oil sales - bbls 130,827 Oil sales - bbls 196,705<br />
Revenue – oil sales 12,250,756 Revenue – oil sales 18,642,170<br />
Other revenue 6,473 Projected revenue<br />
Total revenue 12,257,229 Vat refunds 690,077<br />
ORR Rebates 1,276,764<br />
Total revenue 20,609,011<br />
Petrotrin deductions 44,957,470 957 470 40% Petrotrin deductions 77,581,181 581 181 38%<br />
Oil taxes 949,008 7% Oil taxes 1,192,680 6%<br />
Expenses 989,223 8% Expenses 1,200,000 6%<br />
Amort.& Deprec. 943,563 7% Amort.& Deprec. 1,181,102 6%<br />
Corporate taxes 2,426,152 20% Corporate taxes 5,461,295 27%<br />
NNet t profit fit 11,993,717 993 717 16% NNet t profit fit 44,468,332 468 332 22%<br />
TSX-V: PTT 23<br />
PRIMERA ENERGY RESOURCES LTD.
<strong>Primera</strong> <strong>Energy</strong> <strong>Resources</strong> Ltd.<br />
Summary - Project Status<br />
Trinidad, Block WD-4 (Producing field)<br />
• Optimization of existing wells ongoing<br />
• 13 development and sidetrack locations ~1 million barrels stranded reserves potential<br />
(2 wells completed)<br />
• 4 wells drilled and completed in 2011<br />
Trinidad Trinidad, Cory Moruga Block ‘E’ E<br />
• Seismic interpretation completed<br />
• 2 well exploration program - carried on the 2 exploration wells by Parex <strong>Resources</strong><br />
• WWells ll ddrilled ill d and d cased d (S (Snowcap-1 1 and d Fi Firecrown-1) 1) - encountered t d objectives bj ti with ith oil il and d<br />
gas shows<br />
• Snowcap-1 well tested up to 1,450 bopd and 6.2MMcf/d<br />
• Further exploration activities ongoing<br />
Other<br />
• Investigate and evaluate potential E&P opportunities in Trinidad and the region<br />
TSX-V: PTT<br />
24<br />
PRIMERA ENERGY RESOURCES LTD.
<strong>Primera</strong> <strong>Energy</strong> <strong>Resources</strong> Ltd.<br />
Corporate Summary<br />
� Producing <strong>asset</strong>s provide cash flow and relatively low risk development opportunities –<br />
development drilling in progress<br />
- Bread and butter with infill drilling at WD4 - low risk<br />
� Proven natural gas and condensate production in BGTT’s Central Block north and adjacent<br />
to the Cory Moruga Block ‘E’. Objectives encountered with oil shows in first exploration well.<br />
SSecondd well ll ttested t d significant i ifi t production d ti rates, t up tto 11,450 450 bbopd d andd 66.2MMcf/d 2MM f/d<br />
Further exploration of block ongoing<br />
- Parex farm-in - home run potential<br />
� PERL has the ability to source international deal flow and will continue to evaluate high<br />
quality international plays<br />
� Seeking to diversify and expand operations in Trinidad and the region through acquisitions<br />
while providing a stable cash flow exploiting low risk reserves<br />
TSX-V: PTT 25<br />
PRIMERA ENERGY RESOURCES LTD.
PRIMERA ENERGY RESOURCES LTD.<br />
(PERL)<br />
43 Carlos Street<br />
Port of Spain<br />
Trinidad & Tobago, W.I.<br />
Phone: (868) 628-1128<br />
Fax: (868) 622-5612<br />
Emails:<br />
gleid@primeraenergyresources.com<br />
danpatience@primeraenergyresources.com<br />
info@perlptt.com<br />
www www.primeraenergyresources.com<br />
primeraenergyresources com<br />
August 2012