07.01.2013 Views

SC7640 Auto/Manual High Resolution Sputter Coater Operating ...

SC7640 Auto/Manual High Resolution Sputter Coater Operating ...

SC7640 Auto/Manual High Resolution Sputter Coater Operating ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OM-<strong>SC7640</strong> Operation<br />

(c) Set vacuum pressure<br />

(i) Operate MANUAL / AUTO button, the MANUAL indicator will illuminate.<br />

(ii) Press the START SEQUENCE button, The rotary pump will start (the PUMP<br />

indicator will illuminate), the CHAMBER PRESSURE meter will indicate a falling<br />

pressure. When pressure falls to 10 -1 mbar (approx.), the flush valve will open<br />

(the FLUSH indicator will illuminate) for 5 seconds, purging the system with<br />

process gas. The system will continue to pump down until the lowest pressure<br />

is reached.<br />

(If the leak valve is closed the system will reach its lowest pressure, typically

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!