08.01.2013 Views

lumax auto technologies limited - Securities and Exchange Board of ...

lumax auto technologies limited - Securities and Exchange Board of ...

lumax auto technologies limited - Securities and Exchange Board of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Lumax Auto Technologies Limited<br />

The cost <strong>of</strong> setting up the unit is given below:<br />

Sr. No. Particulars<br />

(Rs. In Lakhs)<br />

Amount<br />

a. Building 143.75<br />

b. Machinery 246.54<br />

Total 390.29<br />

a. Building<br />

The Company has received quotation from Seth Kishan Ch<strong>and</strong> <strong>and</strong> Associates Pvt. Ltd.<br />

for construction <strong>of</strong> 12,500 sq. ft. including electrical, plumbing, kota stone flooring &<br />

finishing etc.<br />

The bifurcation is given below:<br />

(Rs. in Lakhs)<br />

S. No. Particulars Area (in<br />

sq. ft)<br />

Rate Amount<br />

1 Covered area first floor (including<br />

kota stone flooring, finishing etc)<br />

12,500 900/- 112.50<br />

2 Plumbing Work 12,500 150/- 18.75<br />

3 Electrical Work 12,500 100/- 12.50<br />

Total 143.75<br />

b. Machinery<br />

(Rs. in Lakhs)<br />

Sr. Particulars Name <strong>of</strong> the Status Date <strong>of</strong> Amou<br />

No.<br />

party<br />

Quotation nt<br />

1 Quality Checking Fab<br />

Quotation July 15, 187.20<br />

Fixture<br />

Consultant Received 2006<br />

2 Assembly Jigs Noida Quotation July 18, 59.34<br />

Fabcon Received 2006<br />

Total 246.54<br />

iii. Enhancement <strong>of</strong> infrastructure at existing Manesar unit, Haryana<br />

This proposed enhancement will provide better infrastructure equipment & facilities at<br />

the existing unit.<br />

The cost <strong>of</strong> enhancement <strong>of</strong> infrastructure is given below:<br />

(Rs. In Lakhs)<br />

Sr. No. Particulars Amount<br />

a. Machinery 79.50<br />

Total 79.50<br />

a. Machinery<br />

The details <strong>of</strong> Machinery is given below<br />

Sr.No. Particulars Name Of The Date <strong>of</strong> Quotation No.<br />

(Rs.in Lakhs)<br />

Amount<br />

Party<br />

Quotation<br />

1 Mould Doctor Radiant Safeway July 25, 2006 RS/LDKAIL/2006/01 5.23<br />

2 Furniture Shengrilla July 25, 2006 345/06 4.72<br />

3 Epabx Excel July 25, 2006 - 3.42<br />

4 Crates & Pallets Tirupati July 25, 2006 - 6.14<br />

24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!