09.01.2013 Views

Energy Efficiency & Green Economy in Germany

Energy Efficiency & Green Economy in Germany

Energy Efficiency & Green Economy in Germany

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Energy</strong> <strong>Efficiency</strong> &<br />

<strong>Green</strong> <strong>Economy</strong> <strong>in</strong> <strong>Germany</strong><br />

Status and Outlook on EE &<br />

<strong>Green</strong> <strong>Economy</strong> <strong>in</strong> <strong>Germany</strong><br />

Dr. Ulrich Averesch, Head of <strong>Energy</strong> <strong>Efficiency</strong><br />

South African-German <strong>Energy</strong> Programme (SAGEN)<br />

Pretoria, 27/28 November 2012<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Page 1


Government<br />

Implement<strong>in</strong>g<br />

Agency<br />

Focal Area Programmes<br />

SA-German Focal Area <strong>Energy</strong> & Climate<br />

SA – German<br />

<strong>Energy</strong><br />

Programme<br />

(SAGEN)<br />

BMZ – Federal M<strong>in</strong>istry for Economic Cooperation and Development<br />

BMU – Federal M<strong>in</strong>istry for the Environment, Nature<br />

Conservation and Nuclear Safety<br />

German International<br />

Cooperation (GIZ)<br />

(former InWEnt, DED, GTZ)<br />

Technical Cooperation<br />

Climate<br />

Support<br />

Programme<br />

Skills for<br />

<strong>Green</strong> Jobs<br />

Programme<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

German Development<br />

Bank (KfW)<br />

F<strong>in</strong>ancial Cooperation<br />

DBSA Credit<br />

L<strong>in</strong>e<br />

Eskom CSP Plant<br />

Solid Waste<br />

Management<br />

Bus Rapid<br />

Transit Tra<strong>in</strong><strong>in</strong>g<br />

<strong>Green</strong> <strong>Energy</strong><br />

<strong>Efficiency</strong> Fund<br />

SHS <strong>in</strong> rural<br />

areas<br />

Non Motorized<br />

Transport (NMT)<br />

SAPP<br />

BMBF<br />

Federal M<strong>in</strong>istry<br />

of Education and<br />

Research<br />

Scientific and<br />

Technological<br />

Cooperation<br />

Enerkey<br />

SASSCAL<br />

CLIENT<br />

Projects<br />

Page 2<br />

June 2012


SAGEN South African – German <strong>Energy</strong> Programme (SAGEN)<br />

Component 1: Renewable <strong>Energy</strong><br />

Objective: The conditions for <strong>in</strong>vestments <strong>in</strong><br />

RE have improved<br />

Sub-Component 1.1: Institutional and<br />

regulatory capacities for promotion of RE<br />

Sub-Component 1.2: Support to grid and<br />

system <strong>in</strong>tegration of RE<br />

Sub-Component 1.3: Technical expertise for<br />

w<strong>in</strong>d and solar<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Component 2: <strong>Energy</strong> <strong>Efficiency</strong><br />

Objective: The conditions for <strong>in</strong>vestments <strong>in</strong><br />

EE have improved<br />

Sub-Component 2.1: Institutional capacity<br />

development for EE promotion<br />

Sub-Component 2.2: Implementation of<br />

<strong>in</strong>novative EE programmes<br />

Sub-Component 2.3: Development of a<br />

market for energy service providers<br />

Sub-Component 2.4: Technology<br />

dissem<strong>in</strong>ation and private sector<br />

cooperation<br />

Page 3


Summary of EE component results to date<br />

<strong>Energy</strong> <strong>Efficiency</strong><br />

• Policy mapp<strong>in</strong>g study launched as basis for a 1 st National <strong>Energy</strong> <strong>Efficiency</strong> Action<br />

Plan (NEEAP)<br />

• Support to the draft of new regulations (e.g. <strong>Energy</strong> Management)<br />

• Support to the design and implementation of various EE programmes:<br />

• SWH SOP; EE-Street Light<strong>in</strong>g; Public Build<strong>in</strong>gs<br />

• Tax Incentive Schemes (Guidel<strong>in</strong>es and onl<strong>in</strong>e Monitor<strong>in</strong>g System)<br />

• <strong>Energy</strong> Performance Certificate (EPC),<br />

• GIS Data Manager, etc.<br />

• <strong>Energy</strong> auditors tra<strong>in</strong>ed; tra<strong>in</strong><strong>in</strong>g carried-on by Eskom<br />

• Support to the <strong>Energy</strong> <strong>Efficiency</strong> Leadership Network (EELN)<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Page 4


EE - Historical background<br />

<strong>Energy</strong> consumption <strong>in</strong> <strong>Germany</strong> has been<br />

structurally high<br />

• a heavy <strong>in</strong>dustrialised economy<br />

• a densely populated country<br />

Limited fossil energy resources<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

„I am an energy saver“ campaign 1980<br />

• energy has always been comparatively scarce / expensive<br />

• high vulnerability from oil price shocks of the 1970s<br />

• s<strong>in</strong>ce mid 1970s: Regulatory measures def<strong>in</strong><strong>in</strong>g efficiency standards<br />

were implemented<br />

• not one major legal framework but a multitude of energy sav<strong>in</strong>gs<br />

approaches, ma<strong>in</strong>ly <strong>in</strong> build<strong>in</strong>g and <strong>in</strong>dustrial sectors<br />

Page 5


<strong>Energy</strong> related legislation 1991-2009<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Page 6


Precondition<br />

• Highly specialised German <strong>in</strong>dustrial sectors and suppliers, esp.<br />

mechanical eng<strong>in</strong>eer<strong>in</strong>g. In addition, high eng<strong>in</strong>eer<strong>in</strong>g standards + need for<br />

rational use of energy = high level of energy efficiency<br />

• S<strong>in</strong>ce early 1990s decoupl<strong>in</strong>g of GDP growth and energy consumption:<br />

energy productivity 1990-2008 raised by 40.7%<br />

• Primary energy consumption of less than 7 GJ per €1000 of GDP makes<br />

<strong>Germany</strong> one of the most energy efficient <strong>in</strong>dustrialised countries<br />

• Today, German <strong>in</strong>dustrial sectors provide a large number of high efficiency<br />

products and <strong>in</strong>novative approaches.<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Page 7


<strong>Energy</strong> Productivity PEC<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Goal<br />

Page 8


<strong>Energy</strong> Sav<strong>in</strong>g Potential<br />

Stand-by appliances:<br />

HVAC-Cool<strong>in</strong>g:<br />

Over 20% economic<br />

Approx. 47%<br />

sav<strong>in</strong>gs economic sav<strong>in</strong>gs<br />

Light<strong>in</strong>g <strong>in</strong> households:<br />

About 40% economic<br />

sav<strong>in</strong>gs<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

LED-Street lights:<br />

Up to 76% economic<br />

sav<strong>in</strong>gs<br />

Page 9


Example: Build<strong>in</strong>gs<br />

ENERGIEAUSWEIS für Wohngebäude<br />

gemäß den §§ 16 ff. Energiee<strong>in</strong>sparverordnung (EnEV)<br />

Berechneter Energiebedarf des Gebäudes<br />

Energiebedarf<br />

Primärenergiebedarf<br />

Gebäude Ist-W ert<br />

EnEV-Anforderungswert<br />

Endenergiebedarf<br />

Energieträger<br />

Sonstige Angaben<br />

E<strong>in</strong>setzbarkeit alternativer Energieversorgungssysteme<br />

� nach § 5 EnEV vor Baubeg<strong>in</strong>n berücksichtigt<br />

Alternative Energieversorgungssysteme werden<br />

genutzt für:<br />

� Heizung<br />

� Warmwasser<br />

� Lüftung<br />

� Kühlung<br />

Lüftungskonzept<br />

Die Lüftung erfolgt durch:<br />

� Fensterlüftung<br />

� Schachtlüftung<br />

� Lüftungsanlage ohne Wärmerückgew<strong>in</strong>nung<br />

� Lüftungsanlage mit W ärmerückgew<strong>in</strong>nung<br />

Endenergiebedarf<br />

kWh/(m ²·a)<br />

Nachweis der E<strong>in</strong>haltung des § 3 oder § 9 Abs. 1 EnEV 2 )<br />

kWh/(m²·a)<br />

kWh/(m²·a)<br />

Energetische Qualität der Gebäudehülle<br />

Gebäude Ist-W ert H T ’<br />

EnEV-Anforderungswert H T’<br />

Hilfsgeräte 3)<br />

Warm wasser<br />

Heizung<br />

Jährlicher Endenergiebedarf <strong>in</strong> kW h/(m 2 ·a) für<br />

CO 2 -Emissionen 1 ) kg/(m²·a)<br />

0 50 100 150 200 250 300 350 400 >400<br />

kWh/(m²·a)<br />

Erläuterungen zum Berechnungsverfahren<br />

Primärenergiebedarf („Gesam tenergieeffizienz“)<br />

Vergleichswerte Endenergiebedarf<br />

Gesamt <strong>in</strong> kWh/(m 2 ·a)<br />

Traditionally: Strong focus on legislation<br />

(<strong>Energy</strong> sav<strong>in</strong>g ord<strong>in</strong>ance etc.)<br />

Support schemes:<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

W/(m²·K)<br />

W/(m²·K)<br />

0 50 100 150 200 250 300 350 400 >400<br />

Das verwendete Berechnungsverfahren ist durch die Energiee<strong>in</strong>sparverordnung vorgegeben. Insbesondere wegen standardisierter Randbed<strong>in</strong>gungen<br />

erlauben die angegebenen W erte ke<strong>in</strong>e Rückschlüsse auf den tatsächlichen Energieverbrauch. Die ausgewiesenen Bedarfswerte<br />

s<strong>in</strong>d spezifische W erte nach der EnEV pro Quadratmeter Gebäudenutzfläche (A N ).<br />

1) freiwillige Angabe 3) ggf. e<strong>in</strong>schließlich Kühlung<br />

2) nur <strong>in</strong> den Fällen des Neubaus und der Modernisierung auszufüllen 4) EFH – E<strong>in</strong>familienhäuser, MFH – Mehrfamilienhäuser<br />

4 )<br />

2<br />

� CO2-build<strong>in</strong>g & rehabilitation<br />

programme<br />

� New build<strong>in</strong>gs: KfW support scheme<br />

“build ecologically”<br />

Information:<br />

<strong>Energy</strong> certificates & energy advisory services<br />

Page 10


Development of German Build<strong>in</strong>g Code<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

2019/2021<br />

EPBD Recast:<br />

“Nearly zero energy build<strong>in</strong>gs”<br />

Page 11


Heat energy consumption <strong>in</strong> dwell<strong>in</strong>gs<br />

kWh per m2 / year<br />

Heat energy consumption <strong>in</strong> dwell<strong>in</strong>gs <strong>in</strong> <strong>Germany</strong><br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Reduction 2002-2010: 22%<br />

Page 12


EE construction materials<br />

Insulat<strong>in</strong>g load-<br />

bear<strong>in</strong>g brick<br />

Thermal conductivity<br />

λ 0,07 W/mK<br />

Photos: Wienerberger,Sa<strong>in</strong>t Goba<strong>in</strong>, Teckentrup<br />

Alum<strong>in</strong>ium-Wood<br />

Triple-glazed w<strong>in</strong>dow<br />

U G Value 0,5 W/mK<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Special door/panel for<br />

heat/cold <strong>in</strong>sulation<br />

U D Value 0,07 W/mK<br />

Page 13


EE construction materials<br />

U- Value<br />

6.00<br />

5.00<br />

4.00<br />

3.00<br />

2.00<br />

1.00<br />

0.00<br />

Photos: REHAU<br />

5.7<br />

5.0<br />

Alum<strong>in</strong>um Ord<strong>in</strong>ary S<strong>in</strong>gle<br />

W<strong>in</strong>dow with<br />

S<strong>in</strong>gle Glaz<strong>in</strong>g<br />

Glass alone<br />

U-Value Diagram<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

3.4<br />

Alum<strong>in</strong>um<br />

W<strong>in</strong>dow with<br />

Double Glaz<strong>in</strong>g<br />

3.0<br />

Insulated<br />

Double Glaz<strong>in</strong>g<br />

alone<br />

2.7<br />

60 mm REHAU<br />

with Double<br />

Glaz<strong>in</strong>g 3.0<br />

1.7<br />

60 mm REHAU<br />

with Double<br />

Glaz<strong>in</strong>g 1.1<br />

1.3 1.2<br />

70 mm REHAU<br />

with Double<br />

Glaz<strong>in</strong>g 1.1<br />

70 mm REHAU<br />

with Triple<br />

Glaz<strong>in</strong>g<br />

Page 14


Current status of <strong>Green</strong> <strong>Economy</strong> <strong>in</strong> <strong>Germany</strong><br />

RE Sources & Storage Technologies<br />

� 23% of world market share<br />

Environmental technology & resource efficiency<br />

� 15% of world market share<br />

Jobs <strong>in</strong> <strong>Green</strong> Technology sector<br />

� 1,400,000 (2011)<br />

Source: BMU press release 4 /09/2012, <strong>Green</strong> Tech 3.0 / Roland Berger<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Page 15


Strength & Importance of <strong>Green</strong> Technologies<br />

based on traditional German <strong>in</strong>dustries<br />

�1.1m<br />

new jobs<br />

Electrical<br />

Eng<strong>in</strong>eer<strong>in</strong>g<br />

<strong>Green</strong> Technologies<br />

Mechanical<br />

Eng<strong>in</strong>eer<strong>in</strong>g<br />

<strong>Green</strong><br />

<strong>in</strong>dustry<br />

Source: Bundesregierung, <strong>Green</strong> Tech Made <strong>in</strong> <strong>Germany</strong> 2.0, Roland Berger<br />

Plant<br />

Eng<strong>in</strong>eer<strong>in</strong>g<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Services<br />

Potential Share of green<br />

technologies <strong>in</strong> CDP 2008<br />

Change until<br />

2020<br />

Page 16


Allocation of jobs <strong>in</strong> the <strong>Green</strong> Technology<br />

Sector, <strong>Germany</strong> 2011<br />

<strong>Energy</strong><br />

<strong>Efficiency</strong><br />

Environment<br />

friendly<br />

technologies<br />

and energy<br />

storage<br />

Source: <strong>Green</strong> Tech Made <strong>in</strong> <strong>Germany</strong> 3.0, Roland Berger<br />

Susta<strong>in</strong>able<br />

Water<br />

Management<br />

Susta<strong>in</strong>able<br />

Mobility<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Resource<br />

& material<br />

efficiency<br />

Recycl<strong>in</strong>g<br />

Sector<br />

Page 17


Product range of EE (“green”) products<br />

Source: www.topten.<strong>in</strong>fo , Global Annual Report 2011, topten.ch<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Page 18


Appliances EU Top Runner<br />

Push & Pull – approach:<br />

• Revise EU energy labell<strong>in</strong>g (Pull)<br />

• Strong signals to producers<br />

• Cool<strong>in</strong>g appliances: A+ und A++ Labels<br />

<strong>in</strong>troduced<br />

• Discussion on revision ongo<strong>in</strong>g<br />

• Ecodesign Directive (Push)<br />

• M<strong>in</strong>imum efficiency standards (stand<br />

by, light<strong>in</strong>g etc.)<br />

• Regular and dynamic update needed to keep<br />

strong <strong>in</strong>centives for <strong>in</strong>novations<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Page 19


EE targets <strong>in</strong> EU & <strong>Germany</strong> (1)<br />

• In 2007 European governments agreed on 2020 targets:<br />

• 20% reduction of CO 2 emissions <strong>in</strong> comparison with 1990 CO 2<br />

levels<br />

• 20% of EU energy consumption from renewable sources<br />

• 20% reduction of primary energy use compared to projected levels<br />

(reduction by means of improv<strong>in</strong>g energy efficiency)<br />

• <strong>Energy</strong> <strong>Efficiency</strong> Action plan<br />

• Reduce primary energy use <strong>in</strong> Europe by means of improv<strong>in</strong>g<br />

energy efficiency<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Page 20


EE targets <strong>in</strong> EU & <strong>Germany</strong> (2)<br />

• European Performance Build<strong>in</strong>g Directive (EPBD)<br />

• EU had a Directive for EE <strong>in</strong> build<strong>in</strong>gs s<strong>in</strong>ce 2002, the new Directive is<br />

a recast<br />

• All new build “nearly zero energy build<strong>in</strong>gs” as of 1 Jan 2021 (public<br />

sector: 1 Jan 2019). Rema<strong>in</strong><strong>in</strong>g energy need ma<strong>in</strong>ly covered by RES<br />

• Directive covers now all exist<strong>in</strong>g build<strong>in</strong>gs irrespective of their size<br />

both residential and non residential sector (previously only >1000 m2)<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Page 21


EE targets <strong>in</strong> EU & <strong>Germany</strong> (3)<br />

• EcoDesign Directive<br />

• Establish<strong>in</strong>g a framework for the sett<strong>in</strong>g of eco design requirements for<br />

energy-us<strong>in</strong>g products (EuP) <strong>in</strong>clud<strong>in</strong>g energy efficiency requirements<br />

• Entered <strong>in</strong>to force on 11 August 2005<br />

• <strong>Energy</strong> use targeted<br />

• All energy us<strong>in</strong>g products (except vehicles for transport) and cover<strong>in</strong>g<br />

all energy sources<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Page 22


EE targets <strong>in</strong> EU & <strong>Germany</strong> (4)<br />

• German environmental protection policy (<strong>in</strong> 2020)<br />

• 40% reduction of GHG <strong>in</strong> comparison to 1990<br />

(2010: -24%)<br />

• 30% <strong>in</strong>crease <strong>in</strong> renewable energy sources<br />

• Doubl<strong>in</strong>g of energy productivity 1990 – 2020<br />

(Source: NEEAP <strong>Germany</strong> 2007 and BMU, 2012)<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Page 23


Conclusion<br />

The German policy for energy efficiency:<br />

� A mix of regulation, f<strong>in</strong>ancial <strong>in</strong>centives and <strong>in</strong>formation<br />

� e.g. build<strong>in</strong>g codes, low <strong>in</strong>terest loans, advice campaigns and<br />

research<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Page 24


GIZ Head Office <strong>in</strong> Eschborn, <strong>Germany</strong><br />

Text<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Page 25


New KfW office build<strong>in</strong>g<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Page 26


“<strong>Energy</strong>+” House W<strong>in</strong>ner of the Solar Decathlon<br />

For more <strong>in</strong>formation, please follow this l<strong>in</strong>k with detailed downloads:<br />

http://www.bmvbs.de/SharedDocs/EN/Publikationen/effizienzhausplus_e<br />

lektromobil_en_aufl1.html<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Page 27


Thank you very much !<br />

Ulrich.Averesch@giz.de<br />

Christian.Borchard@giz.de<br />

27/28 Nov 2012 Dr. Ulrich Averesch – EE <strong>in</strong> <strong>Germany</strong><br />

Page 28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!