<strong>PROJECT</strong><br />

006-100-004<br />

Upgrade HVAC System (West),<br />

Phase 2, Capitol Building<br />

Springfield<br />

040-010-097<br />

Plan/Begin Renovation of Kent,<br />

Schapers B, Elmore<br />

Quincy Veterans’ Home<br />

040-060-013<br />

Plan & Begin a 40-50 Bed<br />

Addition, Anna Veterans' Home<br />

040-080-001<br />

Plan & Begin 200-Bed Facility –<br />

Chicago, Department of<br />

Veterans' Affairs<br />

104-148-008<br />

Purchase and Renovate Tinsley<br />

Shop, Springfield<br />

120-230-125<br />

Plan and Begin the Construction<br />

of Medical and Long Term Care<br />

Facility, Stateville<br />

Correctional Center, Joliet, IL<br />

120-230-126<br />

Plan and Begin Construction of<br />

an X-House<br />

Stateville Correctional Center -<br />

Joliet<br />

546-006-001<br />

Armory and Aviation Support<br />

Facility, Kankakee Aviation<br />

Support Facility<br />

<strong>CURRENT</strong> <strong>CDB</strong> <strong>GREEN</strong> <strong>PROJECT</strong> <strong>STATUS</strong> <strong>REPORT</strong><br />

<strong>April</strong> <strong>2012</strong><br />

<strong>GREEN</strong> LEVEL<br />

ESTIMATED<br />

<strong>PROJECT</strong><br />

Proposed Attained TOTAL A/E – P.M. <strong>STATUS</strong><br />

LEED Silver $43,761,500 Henneman, Raufeisen<br />

and Associates Inc.<br />

1<br />

Tim Patrick<br />

LEED Silver $57,000,000 Perkins Eastman<br />

Architects PC<br />

LEED Silver $16,000,000<br />

Bill Spainhour<br />

Image Architects Inc<br />

LEED Silver $65,500,000<br />

Erik Luckett<br />

Harley Ellis Devereaux<br />

LEED Silver $1,000,000<br />

Jane Gucker<br />

LEED Silver $60,340,000<br />

Terry Phelan<br />

HDR Architecture Inc<br />

Steve Halm<br />

LEED Silver $22,000,000 PSA Dewberry Inc<br />

LEED Silver $48,252,000<br />

(State Share<br />

$6,252,000)<br />

Steve Halm<br />

Bailey Edward Design,<br />

Inc.<br />

Mohammed Haq<br />

Phase 2 - OAC has requested significant<br />

changes. Proposals being developed to<br />

price these changes and to accelerate<br />

construction to meet original milestones.<br />

Phase 3 – In Design<br />

Phase 1 $15 mil. – 100% Design has begun.<br />

Phase 2 $42 mil. – Proceeding to 100%<br />

Design<br />

Schematic design that was due in March has<br />

not been received.<br />

The 50% Design was not accepted and will<br />

be resubmitted in <strong>April</strong>.<br />

Funds released. No scope. Not authorized<br />

to proceed.<br />

Schematic Design was accepted.<br />

The 50% Design is due in May.<br />

The 100% Design is due in July.


<strong>PROJECT</strong><br />

546-020-001<br />

Construct Readiness Center<br />

Normal, IL<br />

546-282-003<br />

Capital Improvements to<br />

Lincoln's ChalleNGe Academy<br />

Lincoln's ChalleNGe Academy -<br />

Rantoul<br />

630-200-006<br />

Study and Design of Wind<br />

Generation, Miss. Rapids Rest<br />

Area, IDOT<br />

810-010-005<br />

Student Services Center, Truman<br />

City College, Chicago<br />

810-015-002<br />

Renovate Humboldt Park Voc.<br />

Educational Center, Illinois<br />

Community College Board<br />

810-018-006<br />

Construct Academic Building,<br />

Olive-Harvey College,<br />

810-026-012<br />

Renovate/Expand Student<br />

Success Center, Richland<br />

Community College<br />

810-028-023<br />

Replace Temporary Facilities,<br />

College of Dupage<br />

810-032-023<br />

Eng. and Tech. Center<br />

Renovation, Harper College<br />

<strong>CURRENT</strong> <strong>CDB</strong> <strong>GREEN</strong> <strong>PROJECT</strong> <strong>STATUS</strong> <strong>REPORT</strong><br />

<strong>April</strong> <strong>2012</strong><br />

<strong>GREEN</strong> LEVEL<br />

ESTIMATED<br />

<strong>PROJECT</strong><br />

Proposed Attained TOTAL A/E – P.M. <strong>STATUS</strong><br />

LEED Silver $16,500,000<br />

(State Share<br />

Burns & McDonnell<br />

$6,500,000) Bill Mabie<br />

LEED Silver $38,140,000 RATIO Arch., Inc.<br />

Green<br />

Elements<br />

2<br />

Bill Mabie<br />

TBD Teng and Associates<br />

Tim Dietz<br />

LEED Silver $55,000,000 S T V, Inc.<br />

LEED Silver $6,666,000<br />

LEED Silver $41,300,000<br />

LEED Silver $4,670,000<br />

(State Share<br />

$3,524,000)<br />

LEED Silver $33,300,000<br />

(State Share<br />

$24,000,000)<br />

LEED Silver $27,115,700<br />

(State Share<br />

$20,336,800)<br />

John Nalis<br />

Chima Uwanamodo<br />

Karen Fredrickson<br />

BLDD Architects Inc.<br />

Jane Gucker<br />

Legat and Pepper<br />

Construction<br />

Andrea Bauer<br />

Holabird and Root<br />

Dan Bielski<br />

100% Design was not accepted and will<br />

need to be submitted for review.<br />

Fed Share $10 mil.<br />

Contract Executive is finalizing contract<br />

with architect.<br />

Study is due June <strong>2012</strong>.<br />

Ph. 1, 2, 3 & 4 Project has been completed.<br />

Ph. 5 Certificate of Substantial Completion<br />

was signed on March 29.<br />

Architect has not been selected.<br />

Architect has not been selected.<br />

This project is on hold.<br />

The Using Agency canceled the <strong>CDB</strong><br />

project and will complete building<br />

themselves.<br />

100% Design was not accepted and has<br />

been resubmitted.


<strong>PROJECT</strong><br />

810-032-024<br />

Construct Admissions and<br />

Campus/Student Center, William<br />

Rainey Harper College<br />

810-032-025<br />

Replace Hospitality Facility,<br />

William Rainey Harper College<br />

810-039-002<br />

Construct Collision Repair Tech.<br />

Center, Illinois Eastern College<br />

810-040-007<br />

Construct Technology Center,<br />

Lincoln Trail College<br />

810-044-013<br />

Construct Student Center,<br />

Wabash Valley College<br />

810-046-016<br />

Community Tech. Center<br />

Illinois Valley CC<br />

810-056-024<br />

Construct Student Services/Adult<br />

Education Center, College of<br />

Lake County<br />

810-056-025<br />

Classroom Building, Grayslake<br />

Campus, College of Lake County<br />

810-058-022<br />

Construct Rural Development<br />

<strong>CURRENT</strong> <strong>CDB</strong> <strong>GREEN</strong> <strong>PROJECT</strong> <strong>STATUS</strong> <strong>REPORT</strong><br />

<strong>April</strong> <strong>2012</strong><br />

<strong>GREEN</strong> LEVEL<br />

ESTIMATED<br />

<strong>PROJECT</strong><br />

Proposed Attained TOTAL A/E – P.M. <strong>STATUS</strong><br />

LEED Silver $54,205,200<br />

(State Share<br />

$40,653,900)<br />

LEED Silver $5,297,300<br />

(State Share<br />

$3,944,800)<br />

LEED Silver $1,497,000<br />

(State Share<br />

$1,122,800)<br />

LEED Silver $10,093,000<br />

LEED Silver $5,372,500<br />

LEED Silver $30,459,700<br />

(State Share<br />

$22,844,800)<br />

LEED Silver $47,902,600<br />

3<br />

O W P/P Engineers Inc.<br />

Dan Bielski<br />

Dan Bielski<br />

Image Architects, Inc.<br />

Marci Boudet<br />

Tom Poludniak<br />

Erik Luckett<br />

Basalay Cary & Alstadt<br />

Architects Ltd<br />

Steve Halm<br />

Bruce Locke<br />

LEED Silver $23,425,600 Legat Architects<br />

LEED Silver $10,032,100<br />

(State Share<br />

Bruce Locke<br />

Architect’s contract will be Program<br />

Analysis only to start. Contract Executive<br />

has completed negotiation and is preparing<br />

contract for the architect.<br />

Architect has not been selected. Funds have<br />

not been released.<br />

Waiting an approved architect contract.<br />

Architect has not been selected.<br />

Architect has not been selected.<br />

Ph. 1 - Buildings C and G construction<br />

began on 2-20. Site excavation/utility work<br />

is near completion. Foundation work is<br />

underway. Structural steel is scheduled to<br />

begin week of May 21.<br />

Ph. 2 – Construction is scheduled to bid<br />

May 10 and 17<br />

Ph. 3 – On Hold<br />

City of Waukegan and the college are<br />

working on site preparation and preplanning.<br />

Planning to start project in near<br />

future.<br />

Core group has started analyzing LEED<br />

Platinum implications with Legat's<br />

consultants. A/E working on first submittal,<br />

PA/SD.<br />

Architect has not been selected.


<strong>PROJECT</strong><br />

Tech. Center Addition, Lake<br />

Land College, Mattoon, IL<br />

810-058-023<br />

Construct Workforce Relocation<br />

Center, Lake Land College,<br />

Mattoon, IL<br />

810-062-024<br />

Renovate Logan and Mason<br />

Halls, Lincoln Land Community<br />

College, Springfield, IL<br />

810-074-017<br />

Student Services Center<br />

Parkland CC, Champaign, IL<br />

810-074-018<br />

Applied Technology Addition<br />

Parkland CC, Champaign, IL<br />

810-080-010<br />

Arts Instructional Center, Rock<br />

Valley College, Rockford, IL<br />

810-090-016<br />

Construct Multi-Purpose<br />

Building, Spoon River College,<br />

Canton, IL<br />

810-096-030<br />

Renovate Technology Building,<br />

Triton College - River Grove, IL<br />

810-098-014<br />

Replace Temporary Building A,<br />

Waubonsee Community College<br />

814-010-070<br />

Plan and Begin a Westside<br />

Campus, Chicago State<br />

<strong>CURRENT</strong> <strong>CDB</strong> <strong>GREEN</strong> <strong>PROJECT</strong> <strong>STATUS</strong> <strong>REPORT</strong><br />

<strong>April</strong> <strong>2012</strong><br />

<strong>GREEN</strong> LEVEL<br />

ESTIMATED<br />

<strong>PROJECT</strong><br />

Proposed Attained TOTAL A/E – P.M. <strong>STATUS</strong><br />

LEED Silver $13,175,600<br />

LEED Silver $3,988,200<br />

LEED Silver $27,500,000<br />

(State Share<br />

$7,524,100) John Begue<br />

$15,442,100)<br />

LEED Silver $13,648,000<br />

(State Share<br />

$9,180,000)<br />

LEED Gold $48,719,600<br />

(State Share<br />

$36,539,700)<br />

4<br />

John Begue<br />

Tim Patrick<br />

Perkins & Will<br />

Tim Patrick<br />

B L D D Architects Inc.<br />

Tim Patrick<br />

Booth Hansen &<br />

Associates Ltd<br />

Dan Bielski<br />

LEED Silver $5,369,400 BLDD Architects, Inc.<br />

LEED Silver $14,221,400<br />

(State Share<br />

$10,666,100)<br />

LEED Silver $3,486,900<br />

(State Share<br />

$2,615,200)<br />

LEED Silver $40,000,000<br />

Eddie Frazier<br />

FGM Architects, Inc.<br />

Andrea Bauer<br />

John Price<br />

TBD<br />

Architect has not been selected.<br />

State funding has not been released.<br />

Construction project was awarded. PM has<br />

requested a pre-construction meeting on 4-<br />

16-12.<br />

A coordination meeting is scheduled for 4-<br />

3-12.<br />

The college board has requested additional<br />

review of the Schematic Design and scope<br />

of work with the master plan. The college<br />

has asked the <strong>CDB</strong> to hold the design until<br />

they conclude their review.<br />

Orientation Meeting has been scheduled for<br />

the week of <strong>April</strong> 23, <strong>2012</strong>.<br />

Program Report just issued by the architect<br />

and is being reviewed by Triton and <strong>CDB</strong>.<br />

Architect has not been selected.<br />

Architect has not been selected.


<strong>PROJECT</strong><br />

University<br />

816-010-036<br />

Renovate Vacated Space and E<br />

& F Wings, Governors State<br />

University, University Park, IL<br />

817-010-055<br />

Construct an Education Building,<br />

Northeastern Illinois University,<br />

Chicago, IL<br />

818-010-096<br />

Construct Performing Arts<br />

Center, WIU, Macomb, IL<br />

818-020-004<br />

Renovate Riverfront Campus,<br />

WIU Quad Cities Campus,<br />

Moline, IL<br />

818-020-005 Phase II<br />

Renovate/Construct Riverfront<br />

Campus, WIU Quad Cities<br />

Campus, Moline, IL<br />

821-010-097<br />

Renovate Visual Arts Center,<br />

Illinois State Univ., Normal, IL<br />

822-010-120<br />

Renovate/Expand Stevens<br />

Building, Northern Illinois<br />

University, DeKalb, IL<br />

822-010-121<br />

Construct Computer Science and<br />

Technology Center, Northern<br />

Illinois University, DeKalb, IL<br />

825-020-143<br />

Construct Transportation<br />

Education Center, SIU,<br />

<strong>CURRENT</strong> <strong>CDB</strong> <strong>GREEN</strong> <strong>PROJECT</strong> <strong>STATUS</strong> <strong>REPORT</strong><br />

<strong>April</strong> <strong>2012</strong><br />

<strong>GREEN</strong> LEVEL<br />

ESTIMATED<br />

<strong>PROJECT</strong><br />

Proposed Attained TOTAL A/E – P.M. <strong>STATUS</strong><br />

LEED Silver $23,330,775 LCM Architects LLC<br />

LEED Silver $72,977,200<br />

LEED Silver $71,835,768 OWPP<br />

LEED Silver<br />

$18,436,620<br />

5<br />

Chima Uwanamodo<br />

Chima Uwanamodo<br />

Rich Meyer<br />

PSA-Dewberry<br />

LEED Silver $42,000,000<br />

Tim Dietz<br />

Holabird and Root<br />

LEED Silver $54,250,100<br />

Tim Dietz<br />

LEED Silver $24,517,600<br />

Eddie Frazier<br />

PSA-Dewberry<br />

LEED Silver $52,015,700<br />

Dan Bielski<br />

Steve Halm<br />

LEED Silver $62,830,779 FGM Architects<br />

Marci Boudet<br />

Demolition work for and around the<br />

associated project is about 95% complete<br />

and coordination activities between the two<br />

projects have started.<br />

Architect has not been selected.<br />

50% Design was not accepted. Review<br />

meeting was held <strong>April</strong> 4 at <strong>CDB</strong>.<br />

Contractors have completed most punch list<br />

items. The general, electrical, vent and<br />

heating contracts will remain open until<br />

change orders are completed.<br />

50% Design was not accepted. Review<br />

meeting was held on <strong>April</strong> 5 at <strong>CDB</strong>.<br />

Tentative bid opening scheduled for July.<br />

No funding has been received to-date.<br />

Program Analysis/ Schematic Design were<br />

approved. Design is on hold until additional<br />

funds are identified by NIU.<br />

State funding has not been released.<br />

Construction is continuing, approximately<br />

85 % complete.


<strong>PROJECT</strong><br />

Carbondale, IL<br />

825-020-146<br />

Renovate/Addition<br />

Communication Building, SIU,<br />

Carbondale, IL<br />

825-030-067<br />

Science Classroom & Lab<br />

Building, Southern Illinois<br />

University, Edwardsville, IL<br />

830-010-327<br />

Renovate Lincoln Hall,<br />

University of Illinois,<br />

Champaign, IL<br />

830-010-331<br />

Construct Electrical & Computer<br />

Eng. Bldg., University of<br />

Illinois, Champaign, IL<br />

830-010-332<br />

Integrated Bio-processing<br />

Research Lab, University of<br />

Illinois, Champaign, IL<br />

830-030-154<br />

Upgrade Campus Infrastructure<br />

& Renovate Campus Building,<br />

Univ. of Illinois, Chicago, IL<br />

830-080-014<br />

Renovate/Construct a Public<br />

Safety Building, University of<br />

Illinois, Springfield, IL<br />

<strong>CURRENT</strong> <strong>CDB</strong> <strong>GREEN</strong> <strong>PROJECT</strong> <strong>STATUS</strong> <strong>REPORT</strong><br />

<strong>April</strong> <strong>2012</strong><br />

<strong>GREEN</strong> LEVEL<br />

ESTIMATED<br />

<strong>PROJECT</strong><br />

Proposed Attained TOTAL A/E – P.M. <strong>STATUS</strong><br />

LEED Silver $61,592,800<br />

6<br />

Marci Boudet<br />

LEED Silver $81,758,442 Hastings – Chivetta<br />

Terry Phelan<br />

LEED Gold $60,450,198 OWP/P<br />

LEED<br />

Platinum<br />

Kirk Fernandes<br />

$86,990,000 Smith Group, Inc.<br />

Kirk Fernandes<br />

LEED Silver $23,229,574 Austin AECOM<br />

LEED Silver $20,800,000<br />

Tim Patrick<br />

KJWW<br />

LEED Silver $4,000,000<br />

Abdulgaffar Shedbalkar<br />

Tim Patrick<br />

Planning funding has been released.<br />

University should begin the QBS process.<br />

Ph. 1 Project has been completed.<br />

Ph. 2 Building’s enclosure is nearing<br />

completion. Temporary heat and<br />

dehumidification is in place. Windows are<br />

installed.<br />

Ph. 3 50% design phase due in <strong>April</strong>.<br />

Most of floors 2, 3 and 4 complete. 1st floor<br />

and LL are finishing up. All exterior flat<br />

work now complete. Dirt on east side in<br />

place and landscaping being placed.<br />

Fencing is up and top soil being removed.<br />

Excavation is 90% complete and spread<br />

footing for north building partially poured.<br />

Utilities are being relocated.<br />

AECOM and <strong>CDB</strong> to meet on 4-5-12 to<br />

reconcile modification to the scope.<br />

Contract Executive is waiting on completed<br />

contract from architect.<br />

State funding has been released.<br />

Q:\profservices\green information\current green project status report.doc 4/9/<strong>2012</strong> 12:59 PM