<strong>PROJECT</strong><br />

546-020-001<br />

Construct Readiness Center<br />

Normal, IL<br />

546-282-003<br />

Capital Improvements to<br />

Lincoln's ChalleNGe Academy<br />

Lincoln's ChalleNGe Academy -<br />

Rantoul<br />

630-200-006<br />

Study and Design of Wind<br />

Generation, Miss. Rapids Rest<br />

Area, IDOT<br />

810-010-005<br />

Student Services Center, Truman<br />

City College, Chicago<br />

810-015-002<br />

Renovate Humboldt Park Voc.<br />

Educational Center, Illinois<br />

Community College Board<br />

810-018-006<br />

Construct Academic Building,<br />

Olive-Harvey College,<br />

810-026-012<br />

Renovate/Expand Student<br />

Success Center, Richland<br />

Community College<br />

810-028-023<br />

Replace Temporary Facilities,<br />

College of Dupage<br />

810-032-023<br />

Eng. and Tech. Center<br />

Renovation, Harper College<br />

<strong>CURRENT</strong> <strong>CDB</strong> <strong>GREEN</strong> <strong>PROJECT</strong> <strong>STATUS</strong> <strong>REPORT</strong><br />

<strong>April</strong> <strong>2012</strong><br />

<strong>GREEN</strong> LEVEL<br />

ESTIMATED<br />

<strong>PROJECT</strong><br />

Proposed Attained TOTAL A/E – P.M. <strong>STATUS</strong><br />

LEED Silver $16,500,000<br />

(State Share<br />

Burns & McDonnell<br />

$6,500,000) Bill Mabie<br />

LEED Silver $38,140,000 RATIO Arch., Inc.<br />

Green<br />

Elements<br />

2<br />

Bill Mabie<br />

TBD Teng and Associates<br />

Tim Dietz<br />

LEED Silver $55,000,000 S T V, Inc.<br />

LEED Silver $6,666,000<br />

LEED Silver $41,300,000<br />

LEED Silver $4,670,000<br />

(State Share<br />

$3,524,000)<br />

LEED Silver $33,300,000<br />

(State Share<br />

$24,000,000)<br />

LEED Silver $27,115,700<br />

(State Share<br />

$20,336,800)<br />

John Nalis<br />

Chima Uwanamodo<br />

Karen Fredrickson<br />

BLDD Architects Inc.<br />

Jane Gucker<br />

Legat and Pepper<br />

Construction<br />

Andrea Bauer<br />

Holabird and Root<br />

Dan Bielski<br />

100% Design was not accepted and will<br />

need to be submitted for review.<br />

Fed Share $10 mil.<br />

Contract Executive is finalizing contract<br />

with architect.<br />

Study is due June <strong>2012</strong>.<br />

Ph. 1, 2, 3 & 4 Project has been completed.<br />

Ph. 5 Certificate of Substantial Completion<br />

was signed on March 29.<br />

Architect has not been selected.<br />

Architect has not been selected.<br />

This project is on hold.<br />

The Using Agency canceled the <strong>CDB</strong><br />

project and will complete building<br />

themselves.<br />

100% Design was not accepted and has<br />

been resubmitted.