<strong>PROJECT</strong><br />

University<br />

816-010-036<br />

Renovate Vacated Space and E<br />

& F Wings, Governors State<br />

University, University Park, IL<br />

817-010-055<br />

Construct an Education Building,<br />

Northeastern Illinois University,<br />

Chicago, IL<br />

818-010-096<br />

Construct Performing Arts<br />

Center, WIU, Macomb, IL<br />

818-020-004<br />

Renovate Riverfront Campus,<br />

WIU Quad Cities Campus,<br />

Moline, IL<br />

818-020-005 Phase II<br />

Renovate/Construct Riverfront<br />

Campus, WIU Quad Cities<br />

Campus, Moline, IL<br />

821-010-097<br />

Renovate Visual Arts Center,<br />

Illinois State Univ., Normal, IL<br />

822-010-120<br />

Renovate/Expand Stevens<br />

Building, Northern Illinois<br />

University, DeKalb, IL<br />

822-010-121<br />

Construct Computer Science and<br />

Technology Center, Northern<br />

Illinois University, DeKalb, IL<br />

825-020-143<br />

Construct Transportation<br />

Education Center, SIU,<br />

<strong>CURRENT</strong> <strong>CDB</strong> <strong>GREEN</strong> <strong>PROJECT</strong> <strong>STATUS</strong> <strong>REPORT</strong><br />

<strong>April</strong> <strong>2012</strong><br />

<strong>GREEN</strong> LEVEL<br />

ESTIMATED<br />

<strong>PROJECT</strong><br />

Proposed Attained TOTAL A/E – P.M. <strong>STATUS</strong><br />

LEED Silver $23,330,775 LCM Architects LLC<br />

LEED Silver $72,977,200<br />

LEED Silver $71,835,768 OWPP<br />

LEED Silver<br />

$18,436,620<br />

5<br />

Chima Uwanamodo<br />

Chima Uwanamodo<br />

Rich Meyer<br />

PSA-Dewberry<br />

LEED Silver $42,000,000<br />

Tim Dietz<br />

Holabird and Root<br />

LEED Silver $54,250,100<br />

Tim Dietz<br />

LEED Silver $24,517,600<br />

Eddie Frazier<br />

PSA-Dewberry<br />

LEED Silver $52,015,700<br />

Dan Bielski<br />

Steve Halm<br />

LEED Silver $62,830,779 FGM Architects<br />

Marci Boudet<br />

Demolition work for and around the<br />

associated project is about 95% complete<br />

and coordination activities between the two<br />

projects have started.<br />

Architect has not been selected.<br />

50% Design was not accepted. Review<br />

meeting was held <strong>April</strong> 4 at <strong>CDB</strong>.<br />

Contractors have completed most punch list<br />

items. The general, electrical, vent and<br />

heating contracts will remain open until<br />

change orders are completed.<br />

50% Design was not accepted. Review<br />

meeting was held on <strong>April</strong> 5 at <strong>CDB</strong>.<br />

Tentative bid opening scheduled for July.<br />

No funding has been received to-date.<br />

Program Analysis/ Schematic Design were<br />

approved. Design is on hold until additional<br />

funds are identified by NIU.<br />

State funding has not been released.<br />

Construction is continuing, approximately<br />

85 % complete.