11.01.2013 Views

Dam Name: Emergency Action Plan (Based on Model Plan) Yes Not ...

Dam Name: Emergency Action Plan (Based on Model Plan) Yes Not ...

Dam Name: Emergency Action Plan (Based on Model Plan) Yes Not ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<str<strong>on</strong>g>Emergency</str<strong>on</strong>g> <str<strong>on</strong>g>Acti<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>Plan</str<strong>on</strong>g> Coordinati<strong>on</strong> Checklists Form Date 03/25/2011<br />

<str<strong>on</strong>g>Emergency</str<strong>on</strong>g> <str<strong>on</strong>g>Acti<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>Plan</str<strong>on</strong>g> (<str<strong>on</strong>g>Based</str<strong>on</strong>g> <strong>on</strong> <strong>Model</strong> <str<strong>on</strong>g>Plan</str<strong>on</strong>g>) <strong>Yes</strong><br />

18.b. <strong>Not</strong>ificati<strong>on</strong> Flow Chart for each <str<strong>on</strong>g>Emergency</str<strong>on</strong>g> Level with correct numbers<br />

18.c. Other <str<strong>on</strong>g>Emergency</str<strong>on</strong>g> Services C<strong>on</strong>tact Numbers<br />

19. Expected <str<strong>on</strong>g>Acti<strong>on</strong></str<strong>on</strong>g>s – Step 4 (19.25.12.18.B and D)<br />

19.a. Expected <str<strong>on</strong>g>Acti<strong>on</strong></str<strong>on</strong>g>s defined at each <str<strong>on</strong>g>Emergency</str<strong>on</strong>g> Level<br />

19.b. Examples of <str<strong>on</strong>g>Emergency</str<strong>on</strong>g> Remedial <str<strong>on</strong>g>Acti<strong>on</strong></str<strong>on</strong>g>s appropriate for the dam (must be prepared by a Professi<strong>on</strong>al Engineer)<br />

20. Terminati<strong>on</strong> resp<strong>on</strong>sibilities of each organizati<strong>on</strong> identified – Step 5 (19.25.12.18.C)<br />

21. EAP Maintenance (19.25.12.18.C)<br />

21.a. Annual Review and Revisi<strong>on</strong> Form<br />

21.b. <str<strong>on</strong>g>Plan</str<strong>on</strong>g>s for exercise of the EAP (Tabletop 3 year and Functi<strong>on</strong>al 5 year frequency)<br />

21.c. List of Official Record Holders of the c<strong>on</strong>trol copies of the EAP and mailing addresses<br />

21.d. List of Revisi<strong>on</strong>s and Updates Form<br />

21.e. C<strong>on</strong>currence Form if required by the Local <str<strong>on</strong>g>Emergency</str<strong>on</strong>g> Official. All parties having a major resp<strong>on</strong>sibility for implementing<br />

the EAP, not identified in the certificati<strong>on</strong>s, are included (19.25.12.18)<br />

22. Appendices (19.25.12.18)<br />

22.a C<strong>on</strong>tact Checklist Form<br />

22.b. Unusual or <str<strong>on</strong>g>Emergency</str<strong>on</strong>g> Event Log Form<br />

22.c. <str<strong>on</strong>g>Dam</str<strong>on</strong>g> <str<strong>on</strong>g>Emergency</str<strong>on</strong>g> Situati<strong>on</strong> Report Form<br />

22.d Any other form required by the Local <str<strong>on</strong>g>Emergency</str<strong>on</strong>g> Official (Opti<strong>on</strong>al)<br />

22.e. Glossary of Terms<br />

22.f. List of Resources available<br />

22.g. Locati<strong>on</strong> and Vicinity Map<br />

22.h. Evacuati<strong>on</strong> Maps (19.25.12.18.E)<br />

22.h.i. Extend until the c<strong>on</strong>sequences of dam failure no l<strong>on</strong>ger requires evacuati<strong>on</strong> or restricting access<br />

22.h.ii. Informati<strong>on</strong> at critical locati<strong>on</strong>s downstream as directed by the Local <str<strong>on</strong>g>Emergency</str<strong>on</strong>g> Official including any critical<br />

assumpti<strong>on</strong>s made when identifying the evacuati<strong>on</strong> z<strong>on</strong>e.<br />

22.h.iii Disclaimer of any limitati<strong>on</strong>s of the evacuati<strong>on</strong> map<br />

22.h.iv. GIS Shape files provided if created. Geo-referenced to NAD 1983 UTM Z<strong>on</strong>e 13N for submittal to OSE.<br />

22.i. Residents/Business/Highways at risk indentified<br />

22.j. Inundati<strong>on</strong> Maps (19.25.12.18.F)<br />

22.j.i. At critical locati<strong>on</strong>s downstream, the distance, arrival time of the leading edge of the flood wave, peak flow depth,<br />

incremental rise, water surface elevati<strong>on</strong> and average or peak velocity are included<br />

22.j.ii. Inundati<strong>on</strong> map identifies key assumpti<strong>on</strong>s from the breach analysis and disclaimer of limitati<strong>on</strong>s provided.<br />

22.j.iii Metadata documentati<strong>on</strong> for Inundati<strong>on</strong> Maps providing key assumpti<strong>on</strong>s<br />

22.k. <str<strong>on</strong>g>Plan</str<strong>on</strong>g> and profile view of dam<br />

22.l. Reservoir elevati<strong>on</strong>/storage data and max. outlet and spillway capacity or rating table<br />

<strong>Not</strong><br />

Required

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!