Case Study<br />
Riverside Resource Recovery Facility<br />
Location: South Bank of River Thames, Belvedere<br />
The RRR Facility is an energy recovery plant planned as an alternative to a<br />
landfill site. The facility is a river-served recovery plant with waste delivered<br />
by barges and tugs. The plant generates its own power and exports power to<br />
the National Grid.<br />
Specification: A bespoke feeder pillar, with a footprint of<br />
2800mm x 900mm, consisting of two standard feeder cubicles in a ‘back to<br />
back’ arrangement to service the following:<br />
General Power<br />
Sub Mains Circuit<br />
Low voltage 110V centre tapped earth socket outlets/connection units<br />
General area lighting and floodlighting<br />
Jetty Navigational Lighting and Emergency Lighting<br />
The pillar was to be sited on a jetty. Therefore it was recommended that<br />
it be fabricated in 5mm 316 grade stainless steel to suit the marine<br />
environment. Electrical distribution panels to be in modular polycarbonate,<br />
IP65 enclosures, with the following general specification:<br />
Material: Thermoplastic<br />
Application Areas: Harsh Environments/Outdoor Use<br />
Ambient Conditions: -5o C to +40o C<br />
Insulation: Protection Class II<br />
Impact Strength: IK 08 (5 Joule) to DIN EN 50 102<br />
Ingress Protection: IP65 – Dust Proof & Water Jets<br />
Electrical Parameters: Rated Current 630A Insulation Voltage AC/DC 690<br />
Burning Behaviour: Glow Wire Test 960o C to IEC 60 695-2-1<br />
Temperature Resistance: -40°C up to +120°C<br />
UV Resistance: Direct Sun Radiation<br />
Chemical Resistance: Acid & Lye 10%, Petrol & Mineral Oil<br />
Toxic Behaviour: Silicon & Halogen Free<br />
Design: After much discussion between <strong>CEL</strong> Designer and Consultant, a<br />
design was agreed, a unique product reference, PQ2909, allocated and<br />
outline drawings prepared and submitted to the client. The job subsequently<br />
went out to tender and prices were submitted by contractors.<br />
Manufacture: Once the formal order was received, detailed circuit<br />
diagrams were prepared and submitted for approval. Several design<br />
changes occurred as the project progressed and once final design was<br />
approved, fabrication of the pillar and assembly of the electrical equipment<br />
began.<br />
Testing: Carried out to BSEN 60439-1. Because of the very special<br />
requirements for this project the customer sent a representative to witness<br />
the test.<br />
Delivery: Due to the nature of the site and the product, a specific delivery<br />
date and time was arranged.<br />