12.01.2013 Views

View as PDF - CIBSE Journal

View as PDF - CIBSE Journal

View as PDF - CIBSE Journal

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Burning<br />

AAV<br />

Load<br />

mixing<br />

valve<br />

tp<br />

P T<br />

T3<br />

CS1<br />

HM 1<br />

Drench<br />

valve<br />

SV<br />

T<br />

P<br />

Safety<br />

Heat<br />

issues<br />

Exchanger<br />

Drench<br />

water Biom<strong>as</strong>s<br />

supply Boiler<br />

DC<br />

4-port<br />

CS1<br />

Thermal Store<br />

Biom<strong>as</strong>s<br />

boiler<br />

pumpset<br />

Back-e nd<br />

Tr tp P T<br />

T<br />

T5<br />

T<br />

Valve MV1<br />

HM 2<br />

T1<br />

Biom<strong>as</strong>s boilers will be key to System thousands of projects<br />

MV3<br />

pressurisation<br />

& expansion<br />

DC<br />

meeting carbon targets so it is essential they are<br />

designed and specified correctly. Here are the most<br />

pertinent issues surrounding their safe and efficient<br />

design, according to four industry experts<br />

22<br />

There is absolutely no place<br />

for an architect to define the<br />

chimney height or boilerhouse<br />

location without being<br />

supported by a fully trained<br />

professional engineer at the<br />

very earliest concept stage<br />

Burner<br />

CS2<br />

DC<br />

SV<br />

Condensing boiler<br />

with modulating<br />

burner<br />

Despite being a relatively<br />

immature industry in the UK,<br />

biom<strong>as</strong>s h<strong>as</strong> become one of the<br />

key low carbon technologies<br />

expected to help the country achieve its<br />

tough 2020 carbon reduction targets.<br />

However, reports by building services<br />

experts and a Health and Safety Executive<br />

(HSE) Safety Notice 1 suggest that a<br />

major overhaul of training programmes<br />

is required if biom<strong>as</strong>s boiler system<br />

installations are to be both safe and<br />

efficient.<br />

According to the Carbon Trust’s<br />

report, Biom<strong>as</strong>s Heat Accelerator: overview<br />

and summary of output 2 , many large<br />

construction projects – such <strong>as</strong> schools and<br />

housing developments – do not involve<br />

biom<strong>as</strong>s specialists. Thus, the installation<br />

AAV<br />

T4<br />

Fossil<br />

fuel<br />

boiler<br />

pumpset<br />

Tr<br />

tp<br />

Split<br />

Headers<br />

of a biom<strong>as</strong>s appliance is treated like a<br />

standard g<strong>as</strong> installation, incorporating<br />

the biom<strong>as</strong>s boiler into a standard heating<br />

system. According to the Carbon Trust, this<br />

lack of knowledge of both correct system<br />

sizing and integration with fossil fuel backup<br />

technologies, h<strong>as</strong> led to installations<br />

that do not achieve expected cost and<br />

carbon savings.<br />

This lack of knowledge is compromising<br />

safety too. Badly installed boilers and<br />

wrongly specified storage are<strong>as</strong> pose a<br />

risk of explosions due to build up of flue<br />

g<strong>as</strong>es and build up of static electricity while<br />

filling containers. A badly designed wood<br />

pellet store could potentially cause carbon<br />

monoxide poisoning or farmer’s lung.<br />

<strong>CIBSE</strong> is now producing an<br />

Application Manual on Biom<strong>as</strong>s Heating<br />