13.01.2013 Views

Direct Testimony of James T. Selecky On Behalf of ABATE

Direct Testimony of James T. Selecky On Behalf of ABATE

Direct Testimony of James T. Selecky On Behalf of ABATE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

TABLE 2<br />

Christopher Seiple Analysis<br />

Description<br />

BRUBAKER & ASSOCIATES, INC.<br />

Net Benefit<br />

($Million)<br />

Steam $3,294<br />

Pump Storage (51)<br />

Gas Turbines (106)<br />

Power Purchases (44)<br />

Subtotal<br />

$3,093<br />

Fermi 2<br />

Total<br />

($2,333)<br />

$ 760<br />

<strong>James</strong> T. <strong>Selecky</strong><br />

Page 9<br />

<strong>ABATE</strong> witness Dr. Richard Tabors provided an analysis that determined<br />

DECo’s net stranded costs to be a negative $826 million. DECo’s stranded benefit<br />

exceeds its stranded cost. Since Dr. Tabors’ analysis did not reflect any net stranded<br />

costs associated with DECo’s power purchase and power sales obligations, I have<br />

utilized the results <strong>of</strong> the power purchase analysis performed by Mr. Seiple, and<br />

included that in Dr. Tabors’ analysis. The results are shown below in Table 3.<br />

TABLE 3<br />

Richard Tabors Analysis<br />

Comparable Book Net<br />

Value Value Benefit<br />

Description ($Million) ($Million) ($Million)<br />

Generation $5,724 $4,898 $826<br />

Power Purchases – – ($44)<br />

Total<br />

$782

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!