A Doosan Babcock Perspective - AP1000
A Doosan Babcock Perspective - AP1000
A Doosan Babcock Perspective - AP1000
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1<br />
Westinghouse <strong>AP1000</strong><br />
UK Equipment Supplier<br />
Launch
<strong>Doosan</strong> <strong>Babcock</strong> Energy Limited<br />
Westinghouse <strong>AP1000</strong><br />
Equipment Suppliers Event<br />
9 th October 2008
Part of the Family - Our Parent<br />
Part of <strong>Doosan</strong> Heavy Industries & Construction (DHI&C)<br />
� <strong>Doosan</strong> Heavy Industries & Construction is part of <strong>Doosan</strong> Group - the oldest<br />
and<br />
one of the most successful conglomerates in Korea<br />
� <strong>Doosan</strong> Group is active in engineering and manufacturing of power plants,<br />
industrial facilities, desalination, engines, construction and construction<br />
equipment
D H I & C Manufacturing Capacities for Power Plants<br />
HRSG<br />
Generator<br />
Turbine<br />
Boiler<br />
5,800 MW/Year<br />
Thermal : 8 x 500 MW,<br />
Nuclear : 1.5 x 1,000 MW,<br />
Hydro : 1 x 300 MW<br />
4,000 MW/Year<br />
(8 x 500MW)<br />
8,300 MW/Year<br />
Nuclear : 1 Unit<br />
Thermal : 14 Units,<br />
Hydro : 1 Unit<br />
11,220 MW/Year<br />
(66 x 170MW)<br />
Nuclear Expanding to 5,000 MW/year
<strong>Doosan</strong> <strong>Babcock</strong> Energy Ltd<br />
<strong>Doosan</strong> <strong>Babcock</strong>, Renfrew, Scotland<br />
– Headquarters in UK<br />
– FY 2007 annual turnover ~ £500m<br />
(US$1000m approx)<br />
– Employees 5300 worldwide<br />
– An international boiler OEM<br />
– Strong aftermarket service<br />
business in nuclear and thermal<br />
power sectors<br />
– Number one M & E contractor in<br />
the UK power sector<br />
– Major EPC contractor at<br />
Sellafield, building new nuclear<br />
facilities
<strong>Doosan</strong> <strong>Babcock</strong> Resources<br />
• Total number of employees increased from 4000 to 5300 in last 2 years<br />
• 3000 are NUCLEAR Suitably Qualified and Experienced Personnel (SQEP)<br />
• 3500 active in nuclear and thermal power stations<br />
• Recruitment Programme<br />
– 75 graduates in 2008 (50 in 2007) plus future planned increase<br />
– 70 trade apprentices in 2008 (50 in 2007) plus future planned increase<br />
– Ex Armed Forces recruitment policy<br />
– Overseas recruitment of design and project engineers to work in UK<br />
• Training Programme<br />
– 60% of staff undergo personal training, external and internal<br />
– 1% of revenue budget spent on training<br />
– Largest welder training school in UK, 500 welders trained per year
Historical Nuclear OEM Capability<br />
1952 Calderhall Fabricate and Installation<br />
1990 Sizewell B Design Fabricate and Install<br />
2007 Residue Export Facility at Sellafield
Nuclear Services across BE Fleet<br />
Fleet wide Mechanical and Technology<br />
Services Contract across seven AGR<br />
stations.<br />
Seven year agreement from April 2007<br />
Anticipated value £550m<br />
Sizewell B<br />
• Provision of Design, Manufacture,<br />
Outage and Maintenance services<br />
• Re-fuelling Outages 2002 – 2008
Sizewell “B” Steam Generator & Primary Loop Pipework<br />
Manufacture for Westinghouse
Module Manufacture, Renfrew
Inspection and Inspection Validation<br />
• In Manufacture Automatic Inspection (IMAI)<br />
Pre Service Inspection (PSI)<br />
In Service Inspection (ISI)<br />
– Development of advanced technologies<br />
– Application to own manufacture<br />
– Application to third parties’ manufacture<br />
• Independent Third Party Inspection<br />
– Development of inspection philosophies<br />
– Validation of techniques, procedures, personnel<br />
– Application of independent inspections
<strong>Doosan</strong> <strong>Babcock</strong> relationships with Westinghouse<br />
• 1983 to 1994 discussions and contracts for UK’s Sizewell B PWR<br />
– Manufacturing licensee for WEC Model F steam generators<br />
• 2000 to 2004 when WEC owned by BNFL - WEC managed projects:-<br />
– Alliance with BNFL Magnox for supply of engineering and site implementation<br />
to Magnox fleet<br />
– Alliance with BNFL Sellafield for supply, installation & commissioning of<br />
Residue Export facility<br />
• 2007 to 2008 - Bid partner with WEC for Sizewell B refuelling outages<br />
• 2005 onward - Discussion & lobbying to promote UK nuclear new build<br />
• October 2007 - Confidentiality Agreement between WEC and <strong>Doosan</strong><br />
<strong>Babcock</strong><br />
• September 2008 - Quality Audit successfully completed<br />
• September 2008 - MoU between WEC & <strong>Doosan</strong> <strong>Babcock</strong> on new build
<strong>Doosan</strong> <strong>Babcock</strong> relationships in UK power industry<br />
• Acknowledged by Government, Utilities and Contractors as UK Number 1<br />
Mechanical Contactor and boiler plant OEM<br />
• Strategic Long Term Partnerships<br />
– British Energy for fleet wide engineering and site implementation of R&M, life<br />
extensions and upgrades<br />
– RWE technology, engineering, site implementation support for over 10 years<br />
– Energy Solutions (BNFL Magnox) engineering and site implementation till end of<br />
life<br />
• Significant involvement with E.On, EdF, Scottish & Southern Energy, Iberdrola :-<br />
– R&M<br />
– Plant Upgrades<br />
– Front End Engineering Design studies<br />
• Board Members of<br />
– National Skills Academy Nuclear<br />
– Engineering Industry Contractors Training Board
<strong>Doosan</strong> <strong>Babcock</strong> Procurement / Supply Chain Management<br />
Local and Global offices with single company approach …<br />
• Procurement /Supply Chain activities<br />
– Purchasing - Tactical & strategic purchase order placement & sourcing of suppliers<br />
– Expediting - Supplier performance in meeting deliverables/order dates<br />
– Shipping - Shipping materials & equipment from fabrication / manufacture to jobsite<br />
– Sub Contracts Management - Administration & management of subcontracts for EPC project<br />
delivery<br />
• Locations - same approach, same structure and same procedures<br />
–UK, Renfrew and Crawley (plus overseas offices)<br />
• Key drivers<br />
– Assurance of reliable, multi-source suppliers<br />
– Correct quality of procured materials/equipment/services<br />
– Shortest, reliable lead time for delivery<br />
– Minimal execution cost and risk<br />
– Subcontractors with capabilities to execute work
In Conclusion<br />
<strong>Doosan</strong> <strong>Babcock</strong><br />
• well connected to all the power utilities in the UK<br />
• strong nuclear pedigree in manufacture, site installation and<br />
commissioning<br />
• major UK employer of site installation and power plant service personnel<br />
• many successful experiences of working in alliances, as leader or member<br />
• well connected into UK supply chain<br />
• preparing for major involvement in UK nuclear new build programme