Westinghouse <strong>AP1000</strong><br />

UK Equipment Supplier<br />

Launch


<strong>Doosan</strong> <strong>Babcock</strong> Energy Limited<br />

Westinghouse <strong>AP1000</strong><br />

Equipment Suppliers Event<br />

9 th October 2008


Part of the Family - Our Parent<br />

Part of <strong>Doosan</strong> Heavy Industries & Construction (DHI&C)<br />

� <strong>Doosan</strong> Heavy Industries & Construction is part of <strong>Doosan</strong> Group - the oldest<br />

and<br />

one of the most successful conglomerates in Korea<br />

� <strong>Doosan</strong> Group is active in engineering and manufacturing of power plants,<br />

industrial facilities, desalination, engines, construction and construction<br />

equipment


D H I & C Manufacturing Capacities for Power Plants<br />

HRSG<br />

Generator<br />

Turbine<br />

Boiler<br />

5,800 MW/Year<br />

Thermal : 8 x 500 MW,<br />

Nuclear : 1.5 x 1,000 MW,<br />

Hydro : 1 x 300 MW<br />

4,000 MW/Year<br />

(8 x 500MW)<br />

8,300 MW/Year<br />

Nuclear : 1 Unit<br />

Thermal : 14 Units,<br />

Hydro : 1 Unit<br />

11,220 MW/Year<br />

(66 x 170MW)<br />

Nuclear Expanding to 5,000 MW/year


<strong>Doosan</strong> <strong>Babcock</strong> Energy Ltd<br />

<strong>Doosan</strong> <strong>Babcock</strong>, Renfrew, Scotland<br />

– Headquarters in UK<br />

– FY 2007 annual turnover ~ £500m<br />

(US$1000m approx)<br />

– Employees 5300 worldwide<br />

– An international boiler OEM<br />

– Strong aftermarket service<br />

business in nuclear and thermal<br />

power sectors<br />

– Number one M & E contractor in<br />

the UK power sector<br />

– Major EPC contractor at<br />

Sellafield, building new nuclear<br />

facilities


<strong>Doosan</strong> <strong>Babcock</strong> Resources<br />

• Total number of employees increased from 4000 to 5300 in last 2 years<br />

• 3000 are NUCLEAR Suitably Qualified and Experienced Personnel (SQEP)<br />

• 3500 active in nuclear and thermal power stations<br />

• Recruitment Programme<br />

– 75 graduates in 2008 (50 in 2007) plus future planned increase<br />

– 70 trade apprentices in 2008 (50 in 2007) plus future planned increase<br />

– Ex Armed Forces recruitment policy<br />

– Overseas recruitment of design and project engineers to work in UK<br />

• Training Programme<br />

– 60% of staff undergo personal training, external and internal<br />

– 1% of revenue budget spent on training<br />

– Largest welder training school in UK, 500 welders trained per year


Historical Nuclear OEM Capability<br />

1952 Calderhall Fabricate and Installation<br />

1990 Sizewell B Design Fabricate and Install<br />

2007 Residue Export Facility at Sellafield


Nuclear Services across BE Fleet<br />

Fleet wide Mechanical and Technology<br />

Services Contract across seven AGR<br />

stations.<br />

Seven year agreement from April 2007<br />

Anticipated value £550m<br />

Sizewell B<br />

• Provision of Design, Manufacture,<br />

Outage and Maintenance services<br />

• Re-fuelling Outages 2002 – 2008


Sizewell “B” Steam Generator & Primary Loop Pipework<br />

Manufacture for Westinghouse


Module Manufacture, Renfrew


Inspection and Inspection Validation<br />

• In Manufacture Automatic Inspection (IMAI)<br />

Pre Service Inspection (PSI)<br />

In Service Inspection (ISI)<br />

– Development of advanced technologies<br />

– Application to own manufacture<br />

– Application to third parties’ manufacture<br />

• Independent Third Party Inspection<br />

– Development of inspection philosophies<br />

– Validation of techniques, procedures, personnel<br />

– Application of independent inspections


<strong>Doosan</strong> <strong>Babcock</strong> relationships with Westinghouse<br />

• 1983 to 1994 discussions and contracts for UK’s Sizewell B PWR<br />

– Manufacturing licensee for WEC Model F steam generators<br />

• 2000 to 2004 when WEC owned by BNFL - WEC managed projects:-<br />

– Alliance with BNFL Magnox for supply of engineering and site implementation<br />

to Magnox fleet<br />

– Alliance with BNFL Sellafield for supply, installation & commissioning of<br />

Residue Export facility<br />

• 2007 to 2008 - Bid partner with WEC for Sizewell B refuelling outages<br />

• 2005 onward - Discussion & lobbying to promote UK nuclear new build<br />

• October 2007 - Confidentiality Agreement between WEC and <strong>Doosan</strong><br />

<strong>Babcock</strong><br />

• September 2008 - Quality Audit successfully completed<br />

• September 2008 - MoU between WEC & <strong>Doosan</strong> <strong>Babcock</strong> on new build


<strong>Doosan</strong> <strong>Babcock</strong> relationships in UK power industry<br />

• Acknowledged by Government, Utilities and Contractors as UK Number 1<br />

Mechanical Contactor and boiler plant OEM<br />

• Strategic Long Term Partnerships<br />

– British Energy for fleet wide engineering and site implementation of R&M, life<br />

extensions and upgrades<br />

– RWE technology, engineering, site implementation support for over 10 years<br />

– Energy Solutions (BNFL Magnox) engineering and site implementation till end of<br />

life<br />

• Significant involvement with E.On, EdF, Scottish & Southern Energy, Iberdrola :-<br />

– R&M<br />

– Plant Upgrades<br />

– Front End Engineering Design studies<br />

• Board Members of<br />

– National Skills Academy Nuclear<br />

– Engineering Industry Contractors Training Board


<strong>Doosan</strong> <strong>Babcock</strong> Procurement / Supply Chain Management<br />

Local and Global offices with single company approach …<br />

• Procurement /Supply Chain activities<br />

– Purchasing - Tactical & strategic purchase order placement & sourcing of suppliers<br />

– Expediting - Supplier performance in meeting deliverables/order dates<br />

– Shipping - Shipping materials & equipment from fabrication / manufacture to jobsite<br />

– Sub Contracts Management - Administration & management of subcontracts for EPC project<br />

delivery<br />

• Locations - same approach, same structure and same procedures<br />

–UK, Renfrew and Crawley (plus overseas offices)<br />

• Key drivers<br />

– Assurance of reliable, multi-source suppliers<br />

– Correct quality of procured materials/equipment/services<br />

– Shortest, reliable lead time for delivery<br />

– Minimal execution cost and risk<br />

– Subcontractors with capabilities to execute work


In Conclusion<br />

<strong>Doosan</strong> <strong>Babcock</strong><br />

• well connected to all the power utilities in the UK<br />

• strong nuclear pedigree in manufacture, site installation and<br />

commissioning<br />

• major UK employer of site installation and power plant service personnel<br />

• many successful experiences of working in alliances, as leader or member<br />

• well connected into UK supply chain<br />

• preparing for major involvement in UK nuclear new build programme