15.01.2013 Views

Schedule of Requirement - OGDCL

Schedule of Requirement - OGDCL

Schedule of Requirement - OGDCL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

10) MINIMUM TECHNICAL STAFF REQUIREMENT<br />

The contractor will have to submit the minimum staff deployment for the each building.<br />

The contractor shall submit pro<strong>of</strong> <strong>of</strong> payment <strong>of</strong> wages not less than the minimum wage<br />

fixed by the GoP every month to <strong>OGDCL</strong> along with the monthly invoice. The same shall<br />

be deducted if non compliance is found.<br />

Minimum requirement for each location is tabulated below. However, the contractor<br />

may quote the staff requirement after visiting the each location and assessing the<br />

existing fire fighting arrangements.<br />

Sr<br />

#<br />

Description <strong>OGDCL</strong> House<br />

Medical<br />

Centre<br />

I-9 Complex<br />

Bobi Oil<br />

Complex<br />

1 Fire Chief Maximum - - - -<br />

2 Fire<br />

Supervisor<br />

Minimum 1 - - -<br />

Maximum - - - -<br />

Minimum 3 1 3 2<br />

3 Fireman Maximum - - - -<br />

Minimum 12 9 12 5<br />

Total = 48<br />

The staff will work in shifts <strong>of</strong> 8 hours each. The contractor may propose his own<br />

arrangement for all the three locations. However, staff should be available round the<br />

clock fully prepared to combat emergency situation.<br />

PROC-FD/CB/HSEQ-669/2012 Page 19/38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!