15.01.2013 Views

Schedule of Requirement - OGDCL

Schedule of Requirement - OGDCL

Schedule of Requirement - OGDCL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11) PROPOSED TECHNICAL EVALUATION CRITERIA<br />

Sr # Emergency Response<br />

Management<br />

Maximum<br />

Quantification<br />

Marks<br />

1 Experience (20) 20<br />

2 Nature <strong>of</strong> Business(10) 10<br />

3 Affiliation (05) 05<br />

4 Staff Pr<strong>of</strong>ile (15) 15<br />

5 Financial Strength in terms <strong>of</strong><br />

05<br />

Net Working Capital(05)<br />

6 Preventive Measures(05)<br />

6.1 Engineering control 02<br />

6.2 Administrative control 03<br />

7 Responsive Measures (20)<br />

7.1 Engineering Control 02<br />

7.2 Administrative Controls 03<br />

7.3 Fire response team 10<br />

7.4 Fire incident reports 05<br />

8 Roles, Responsibility And<br />

10<br />

Authority<br />

9 Drill and Training(10) 10<br />

Total Marks: 100<br />

Minimum Qualifying Marks 60<br />

Marks Obtained<br />

TENDER ENQUIRY NO. PROC-FD/CB/ HSEQ-669/2012 Page 20 <strong>of</strong> 39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!