Schedule of Requirement - OGDCL
Schedule of Requirement - OGDCL
Schedule of Requirement - OGDCL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
11) PROPOSED TECHNICAL EVALUATION CRITERIA<br />
Sr # Emergency Response<br />
Management<br />
Maximum<br />
Quantification<br />
Marks<br />
1 Experience (20) 20<br />
2 Nature <strong>of</strong> Business(10) 10<br />
3 Affiliation (05) 05<br />
4 Staff Pr<strong>of</strong>ile (15) 15<br />
5 Financial Strength in terms <strong>of</strong><br />
05<br />
Net Working Capital(05)<br />
6 Preventive Measures(05)<br />
6.1 Engineering control 02<br />
6.2 Administrative control 03<br />
7 Responsive Measures (20)<br />
7.1 Engineering Control 02<br />
7.2 Administrative Controls 03<br />
7.3 Fire response team 10<br />
7.4 Fire incident reports 05<br />
8 Roles, Responsibility And<br />
10<br />
Authority<br />
9 Drill and Training(10) 10<br />
Total Marks: 100<br />
Minimum Qualifying Marks 60<br />
Marks Obtained<br />
TENDER ENQUIRY NO. PROC-FD/CB/ HSEQ-669/2012 Page 20 <strong>of</strong> 39