Project discription<br />

Pumpturbine<br />

2 vertikal pumpturbinen units<br />

Total capacity<br />

480 MW im pump- u. turbine mode<br />

Height:<br />

365 m<br />

Total costs<br />

405 Mio. €<br />

Construction time<br />

1,5 Jahre planing time<br />

5,5 Jahre construction time<br />