Central Battery System ZB-S with STAR Technology - CEAG
Central Battery System ZB-S with STAR Technology - CEAG
Central Battery System ZB-S with STAR Technology - CEAG
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Main distribution board general lighting<br />
Visual display, monitoring and<br />
programming software<br />
Control and<br />
programming unit<br />
CG Controller<br />
<strong>ZB</strong>-S<br />
F3<br />
remote indicator<br />
R<br />
1)<br />
1) Operation CG-Controller<br />
<strong>ZB</strong>-S in combination <strong>with</strong><br />
CG Vision only in observer<br />
mode possible<br />
CG-S BUS<br />
7<br />
3<br />
2<br />
<strong>ZB</strong>-S<br />
Installation Example<br />
3<br />
ST-S<br />
3 (5)<br />
<strong>Central</strong> <strong>Battery</strong> <strong>System</strong> <strong>ZB</strong>-S<br />
3<br />
DLS<br />
3PH TLS<br />
3<br />
3<br />
3<br />
3<br />
3<br />
3<br />
General lighting<br />
RS485 BUS to other<br />
external modules<br />
to staircase light pushbuttons<br />
incl. glow lamp (230 V)<br />
to general lighting<br />
switches (230 V)<br />
Final circuits <strong>ZB</strong>-S<br />
max. 52 off per central<br />
Maintained light to substation<br />
3<br />
<strong>Battery</strong> cable E30 to substation<br />
Distribution to other substations<br />
CG-S BUS<br />
<strong>CEAG</strong> Notlichtsysteme GmbH 3/26