16.01.2013 Views

2007 RDF Guide - Harte-Hanks CI Technology Database CITDB ...

2007 RDF Guide - Harte-Hanks CI Technology Database CITDB ...

2007 RDF Guide - Harte-Hanks CI Technology Database CITDB ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CiTDB <strong>RDF</strong> Structure v10 – Section 3 Site Computing Summary Table<br />

Site Computing Summary Table<br />

The Site Computing Summary Table supplies a summary of the hardware related resources at a site,<br />

including servers, printers, storage devices, networking equipment, and more. This table includes many of<br />

the most commonly requested totals, such as total number of servers or PCs, both installed and planned.<br />

The totals have been calculated for you, so finding a relevant value is easy and convenient.<br />

Note: Geography and Subscription Requirements for each field are subject to change.<br />

Layout for Table (G) – 89 Fields<br />

FieldOrder FieldName Format Length Short Description Subscription Requirement<br />

1. RE<strong>CI</strong>D A 2 OG - Computing Summary Record-ID<br />

2. SITEID I 9 Site-ID – <strong>Harte</strong>-<strong>Hanks</strong> Assigned<br />

3. ITUPDATE A 6 IT <strong>Technology</strong> Update<br />

4. SVRPURCH A 6 Server Purchasing Decisions (Local/Parent) Standard<br />

5. PCPURCH A 6 PC Purchasing Decisions (Local/Parent) Standard<br />

6. TOTPC I 6 Total Installed Personal Computers Standard<br />

7. PLANPC I 6 Total Planned Personal Computers Standard<br />

8. TOTDESK I 6 Total Installed Desktop Personal Computers Standard<br />

9. PLANDESK I 6 Total Planned Desktop Personal Computers Enhanced - Plan PCs<br />

10. TOTPORT I 6 Total Installed Portable Personal Computers Standard<br />

11. PLANPORT I 6 Total Planned Portable Personal Computers Enhanced - Plan PCs<br />

12. TOTAPPLE I 6 Total Installed Apple Computers Enhanced - PCs<br />

13. PLANAPPLE I 6 Total Planned Apple Computers Enhanced - Plan PCs<br />

14. PCTINTELDESK A 3 Percent Desktop PCs with Intel Chips Enhanced - PCs<br />

15. PCTAMDDESK A 3 Percent Desktop PCs with AMD Chips Enhanced - PCs<br />

16. PCT3YRDESK A 3 Percent Desktop PCs Over 3 Years Old Enhanced - PCs<br />

17. PCTINTELPORT A 3 Percent Portable PCs with Intel Chips Enhanced - PCs<br />

18. PCTAMDPORT A 3 Percent Portable PCs with AMD Chips Enhanced - PCs<br />

19. PCT3YRPORT A 3 Percent Portable PCs Over 3 Years Old Enhanced - PCs<br />

20. PORT-PRES A 3 Presence of Portable PCs Standard<br />

21. DESKTOP-MANUF A 11 Prevalent Desktop PC Manufacturer Standard<br />

22. PORTABLE-MANUF A 11 Prevalent Portable PC Manufacturer Standard<br />

23. PREFERRED-DESKTOP A 11 Preferred Desktop PC Manufacturer Enhanced - PCs<br />

24. PREFERRED-PORTABLE A 11 Preferred Portable PC Manufacturer Enhanced - PCs<br />

25. TOTAL-PCS-IN-COUNTRY I 6 Total PCs in Company in Country Standard<br />

26. TOTTHINCLIENTS I 6 Total Installed Thin Clients Enhanced - PCs<br />

27. PLANTHINCLIENTS I 6 Total Planned Thin Clients Enhanced – Plan PCs<br />

28. TOTSERVER I 6 Total Installed Servers Standard<br />

29. PLANSERVER I 6 Total Planned Servers Standard<br />

30. TOTPCSUSEDASSERVER I 6 Total Servers-Including All PCs Used As A Server Enhanced - Servers<br />

31. TOTSOLDASSERVER I 6 Total Servers–Including CPUs Sold As A Server Only Enhanced - Servers<br />

32. TOTWKS I 6 Total Installed High Performance Workstations Standard<br />

Last Update: June <strong>2007</strong> 3.1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!