16.01.2013 Views

Wind Energy Resource Zone Board Update

Wind Energy Resource Zone Board Update

Wind Energy Resource Zone Board Update

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MPSC Activities<br />

�� Issue an order designating the area of the state likely to<br />

be most productive as the primary wind energy resource<br />

zone (additional zones may also be designated)<br />

�� Evaluate the projected costs and benefits in terms of the<br />

long-term long term production capacity and long-term long term needs for<br />

transmission<br />

�� Ensure that the designation of a wind zone does not<br />

represent an unreasonable threat to the public<br />

convenience, health, and safety and that any adverse<br />

impacts on private property values are minimal<br />

�� Expedited transmission siting process (180 days)<br />

�� Annual reporting to the governor and legislature

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!