17.01.2013 Views

Beck Technology Virtual Design and Construction at Beck ... - CIFE

Beck Technology Virtual Design and Construction at Beck ... - CIFE

Beck Technology Virtual Design and Construction at Beck ... - CIFE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions<br />

<strong>Virtual</strong> <strong>Design</strong> <strong>and</strong> <strong>Construction</strong> <strong>at</strong> <strong>Beck</strong><br />

4 th - 5 th December 2011<br />

Stewart Carroll<br />

COO <strong>Beck</strong> <strong>Technology</strong><br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions


About The <strong>Beck</strong> Group<br />

� In oper<strong>at</strong>ion since 1912<br />

� Priv<strong>at</strong>ely held - 3rd gener<strong>at</strong>ion<br />

� Consistently ranked among the top 100<br />

building companies in the United St<strong>at</strong>es<br />

� 85% repe<strong>at</strong> customers<br />

� Integr<strong>at</strong>ed <strong>Design</strong>, <strong>Construction</strong>,<br />

Development <strong>and</strong> <strong>Technology</strong> firm<br />

� “Integr<strong>at</strong>ed Enterprise”<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions<br />

Hunt Oil Company Headquarters | Dallas, Texas


About <strong>Beck</strong> <strong>Technology</strong>…<br />

� Founded in 1996<br />

� Developers of p<strong>at</strong>ented Macro BIM Software<br />

� Commercially offering BIM software since 2006<br />

� Performing BIM consulting services since 2008<br />

� Holders of US Government BIM Contract<br />

� Offices in Dallas, Tampa, Washington DC <strong>and</strong><br />

Sao Paulo<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions


Our Industry Challenge<br />

Lowest Final<br />

Cost<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions<br />

Owner<br />

Highest Final Product<br />

Quality<br />

Shortest Delivery<br />

Schedule


Our Delivery Methods<br />

Conceptual<br />

Phase<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions<br />

Schem<strong>at</strong>ic<br />

Phase<br />

<strong>Design</strong><br />

Development<br />

Deliverable from A/E to Owner<br />

•Concept plans<br />

Rework<br />

<strong>Construction</strong><br />

Documents<br />

Bid<br />

Phase<br />

<strong>Construction</strong><br />

Phase<br />

Value Cost Engineering Reduction occurs<br />

•Preliminary cost estim<strong>at</strong>e +- 15-20% (Limited GC involvement)<br />

•Preliminary schedule (Limited GC involvement)


BIM: A Risk <strong>and</strong> Cost Control Tool<br />

Sources of Risk<br />

1. Inaccur<strong>at</strong>e early conceptual estim<strong>at</strong>es<br />

leading to misinformed decision making.<br />

2. Cost escal<strong>at</strong>ion stemming from<br />

miscommunic<strong>at</strong>ion of design intent <strong>and</strong><br />

re-work for design issues resolved in<br />

the field<br />

3. Hidden costs to account for<br />

assumptions <strong>and</strong> unknowns<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions<br />

BIM Solutions<br />

1. Gre<strong>at</strong>er scope <strong>and</strong> cost certainty early in the<br />

process.<br />

2. Improved communic<strong>at</strong>ion of scope <strong>and</strong><br />

design coordin<strong>at</strong>ion performed virtually,<br />

before construction begins.<br />

3. Reduces unknowns through providing<br />

gre<strong>at</strong>er design definition.


Building Inform<strong>at</strong>ion Modeling<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions<br />

Hunt Oil Headquarters<br />

Dallas, Texas


<strong>Virtual</strong> Building Toolkit<br />

B I M T o o l k i t<br />

Project Concept<br />

<strong>and</strong> Analysis<br />

(DProfiler)<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions<br />

<strong>Design</strong> <strong>and</strong> Document<strong>at</strong>ion<br />

(Revit)<br />

Visual<br />

Estim<strong>at</strong>ing<br />

(Innovaya)<br />

Coordin<strong>at</strong>ion & Visualiz<strong>at</strong>ions<br />

(Navisworks)<br />

4D Simul<strong>at</strong>ions<br />

(Synchro)<br />

Cost D<strong>at</strong>abase<br />

(Timberline)


Integr<strong>at</strong>ed <strong>Design</strong> Methodology<br />

Macro BIM Micro BIM<br />

Pre-<strong>Design</strong><br />

Planning<br />

Conceptual<br />

<strong>Design</strong><br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions<br />

Criteria<br />

<strong>Design</strong><br />

Detailed<br />

<strong>Design</strong><br />

Implement<strong>at</strong>ion<br />

Documents<br />

<strong>Construction</strong><br />

Administr<strong>at</strong>ion<br />

Direction Implement<strong>at</strong>ion


Project Planning - DProfiler<br />

• Simple 3D Computer Model<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions


Project Planning - DProfiler<br />

• Tied to d<strong>at</strong>a<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions


<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions<br />

Macro BIM Demo


DProfiler Healthcare Example<br />

• 26 Hectare Campus<br />

• 17 Stories: ~90m High<br />

• P<strong>at</strong>ient Tower Length: 200m<br />

• Total Area Campus: ~300,000 m 2<br />

• Cost: $1.27 billion<br />

• Approx. 2 weeks working time <strong>and</strong> 2.5 people<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions


DProfiler Healthcare Example<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions


DProfiler Healthcare Example<br />

Define Room Types th<strong>at</strong> represent major costs for<br />

equipment <strong>and</strong> finishes<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions<br />

OR<br />

Classific<strong>at</strong>ion Item Number Qty. Formula<br />

Floor<br />

Welded Sheet Vinyl Flooring Area S.F.<br />

Sheet Vinyl Integral Cove Perimeter L.F.<br />

Ceiling<br />

Gypsum Board Ceilings Area S.F.<br />

Paint Drywall Ceilings Area S.F.<br />

Walls<br />

1 Layer of 5/8" Type "X" Gyp Board WallArea S.F.<br />

Lead Lined Gypsum Board 0 S.F.<br />

Tape & Bed WallArea S.F.<br />

Paint Drywall Partitions - Epoxy Paint Perimeter*9 S.F.<br />

Interior Door/Frame/Hardware - 6/0x7/0 w/ vision panels Each Opng.<br />

Paint Door & Frame Each Ea.<br />

Specialties<br />

Wall Protection, Corner Guards, stainless steel, 16 ga, 3-<br />

1/2" leg<br />

4 L.F.<br />

R/F Sheilding (Braden Shielding or similar) WallArea/4 S.F.<br />

Other<br />

Uni-strut Medical Equipment Support Allowance Each All<br />

In-Wall Blocking - Upper Cabinets Perimeter/2 L.F.<br />

In-Wall Blocking - Base Cabinets Perimeter/2 L.F.<br />

In-Wall Blocking - Miscellaneous Perimeter/2 L.F.<br />

Solid Surface Vanity Top Perimeter/2 L.F.<br />

Cabinets, wall cabinets Perimeter/2 L.F.<br />

Cabinets, base cabinets, not including counter Perimeter/2 L.F.


Optimiz<strong>at</strong>ion – CDC Building 108


Baseline <strong>Design</strong>


<strong>Design</strong> Evalu<strong>at</strong>ion<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions<br />

19


<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions


<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions


Models for Document<strong>at</strong>ion<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions<br />

22


<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions<br />

23


Detailed Cost Estim<strong>at</strong>ing<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions


Constructability Evalu<strong>at</strong>ion – 4D Scheduling<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions


Detailed Coordin<strong>at</strong>ion<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions<br />

26


Constructability Evalu<strong>at</strong>ion – Laser Scanning<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions<br />

Laser Scan


Constructability Evalu<strong>at</strong>ion – Low Fidelity Laser Scanning<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions


Digital Prefabric<strong>at</strong>ion<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions


Prefabric<strong>at</strong>ion<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions


Prefabric<strong>at</strong>ion<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions


Prefabric<strong>at</strong>ion<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions


Prefabric<strong>at</strong>ion<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions


Prefabric<strong>at</strong>ion<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions


Q&A<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!