DProfiler Healthcare Example<br />
• 26 Hectare Campus<br />
• 17 Stories: ~90m High<br />
• P<strong>at</strong>ient Tower Length: 200m<br />
• Total Area Campus: ~300,000 m 2<br />
• Cost: $1.27 billion<br />
• Approx. 2 weeks working time <strong>and</strong> 2.5 people<br />
<strong>Beck</strong> <strong>Technology</strong><br />
Innov<strong>at</strong>ion in all Dimensions