DProfiler Healthcare Example<br />

• 26 Hectare Campus<br />

• 17 Stories: ~90m High<br />

• P<strong>at</strong>ient Tower Length: 200m<br />

• Total Area Campus: ~300,000 m 2<br />

• Cost: $1.27 billion<br />

• Approx. 2 weeks working time <strong>and</strong> 2.5 people<br />

<strong>Beck</strong> <strong>Technology</strong><br />

Innov<strong>at</strong>ion in all Dimensions