Fall 2005 - Ontario Sewer and Watermain Construction Association
Fall 2005 - Ontario Sewer and Watermain Construction Association
Fall 2005 - Ontario Sewer and Watermain Construction Association
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Message from Kathleen Grimes, President, OSWCA<br />
When I first<br />
assumed the<br />
role of President<br />
of the<br />
OSWCA in February<br />
of <strong>2005</strong>, I anticipated a challenge,<br />
however I never expected<br />
that our Executive Director, Sam<br />
Morra, would resign from his position<br />
during my Presidency. It was<br />
over six years ago that Sam encouraged<br />
me to participate as a Board<br />
Member of the OSWCA <strong>and</strong> that, in<br />
itself, clearly demonstrates the progressive<br />
<strong>and</strong> dynamic approach that<br />
he has brought to the <strong>Association</strong>.<br />
Sam’s departure certainly adds a<br />
new dimension to the challenges<br />
that we, as an association, will face<br />
over the next few months. As an<br />
individual, Sam has made a very significant<br />
contribution to the<br />
OSWCA, not only in terms of his<br />
day to day tasks, but also in terms of<br />
the <strong>Association</strong>’s growth <strong>and</strong> expan-<br />
sion as a well-respected <strong>and</strong> powerful<br />
organization in <strong>Ontario</strong>. Sam is,<br />
underst<strong>and</strong>ably, returning to his<br />
roots as a contractor <strong>and</strong> as an <strong>Association</strong><br />
we wish him the best <strong>and</strong><br />
look forward to his participation in<br />
the <strong>Association</strong> as a contractor<br />
member.<br />
The OSWCA, in conjunction<br />
with the Greater Toronto <strong>Sewer</strong> <strong>and</strong><br />
<strong>Watermain</strong> Contractors <strong>Association</strong>,<br />
has begun the search for a new<br />
Executive Director <strong>and</strong>, until such<br />
time as a new Executive Director has<br />
joined the <strong>Association</strong>, the OSWCA<br />
Board of Directors has established a<br />
system that will provide the basis<br />
for transition to a new Executive<br />
Director. More specifically, the<br />
Board of Directors has appointed a<br />
transition team comprised of four<br />
board members who, along with<br />
myself, will oversee the operation of<br />
the <strong>Association</strong> <strong>and</strong> provide guidance<br />
<strong>and</strong> assistance to the new Executive<br />
Director. In addition, Board<br />
Members have committed to more<br />
active roles during this transition<br />
period <strong>and</strong> correspondingly will be<br />
relied upon for their experience <strong>and</strong><br />
expertise as required.<br />
At any given point in time there is an issue<br />
that dominates the day <strong>and</strong>, at this particular<br />
point in time, that would be the Expert Water<br />
Panel Report which was released on Friday,<br />
July 22, <strong>2005</strong>.<br />
At any given point in time there<br />
is an issue that dominates the day<br />
<strong>and</strong>, at this particular point in time,<br />
that would be the Expert Water<br />
Panel Report which was released on<br />
Friday, July 22, <strong>2005</strong>. The Expert<br />
The Undergrounder / <strong>Fall</strong> <strong>2005</strong> • 7