Executing Agency (EA). It took 332 days from<br />
because the Expression <strong>of</strong> an <strong>of</strong> intervention Interests (EOIs) by a for competing the EA<br />
bidder, and the selected questioning firm to the sign eligibility the contract. <strong>of</strong> the<br />
competitor. After clarification, the ADB<br />
approved It is generally the accepted ranking by as the proposed design engineers by the<br />
Executing interviewed Agency that, (EA). Inadequate It took and 332 days incomplete from<br />
because <strong>of</strong> an intervention by a competing<br />
the investigations Expression have <strong>of</strong> Interests caused (EOIs) significant for the delays EA<br />
bidder, questioning the eligibility <strong>of</strong> the<br />
and during the the selected implementation firm to sign stage. the contract. On the other<br />
competitor. After clarification, the ADB<br />
hand, incomplete site investigations have<br />
approved the ranking as proposed by the<br />
It resulted is generally in time accepted consuming by the activities design engineers like s<strong>of</strong>t<br />
Executing Agency (EA). It took 332 days from<br />
interviewed soil treatment that, later at Inadequate the execution and stage. incomplete<br />
the Expression <strong>of</strong> Interests (EOIs) for the EA<br />
investigations have caused significant delays<br />
and the selected firm to sign the contract.<br />
during At this the stage, implementation preparation <strong>of</strong> stage. tender On documents the other<br />
hand, according incomplete to the available site investigations standards has been have a<br />
It is generally accepted by the design engineers<br />
resulted tedious in task. time Quantitative consuming activities information like s<strong>of</strong>t on<br />
interviewed that, Inadequate and incomplete<br />
soil delays treatment were available later at the for execution only seven stage. projects<br />
investigations have caused significant delays<br />
(P5 – P6, P8 - P12) out <strong>of</strong> the 24 projects<br />
during the implementation stage. On the other<br />
At examined. this stage, Overall, preparation the delay <strong>of</strong> tender caused documents in this<br />
hand, incomplete site investigations have<br />
according stage was to the accounted available from standards the has examined been a<br />
resulted in time consuming activities like s<strong>of</strong>t<br />
tedious projects (see task. Fig.1) Quantitative as 23% on information average. <strong>The</strong> on<br />
soil treatment later at the execution stage.<br />
delays research were revealed available that, for only Incomplete seven projects and<br />
(P5 improperly – P6, P8 harmonized - P12) out tender <strong>of</strong> the documents 24 projects and<br />
At this stage, preparation <strong>of</strong> tender documents<br />
examined. ambiguous specifications Overall, the result delay in caused repetition in this <strong>of</strong><br />
according to the available standards has been a<br />
stage work was thus, accounted causing further from the delay examined in the<br />
tedious task. Quantitative information on<br />
projects process. <strong>The</strong> (see bids Fig.1) submitted as 23% by on the average. contractors <strong>The</strong><br />
delays were available for only seven projects<br />
research were also revealed not substantially that, responsive. Incomplete Even and<br />
(P5 – P6, P8 - P12) out <strong>of</strong> the 24 projects<br />
improperly the qualified harmonized bidders tender were documents called and for<br />
examined. Overall, the delay caused in this<br />
ambiguous clarification specifications on their shortcomings result in on repetition the contract <strong>of</strong><br />
stage was accounted from the examined<br />
work documents thus, submitted causing and further this has delay been observed in the<br />
projects (see Fig.1) as 23% on average. <strong>The</strong><br />
process. to be one <strong>The</strong> <strong>of</strong> bids the submitted most significant by the contractors causes <strong>of</strong><br />
research revealed that, Incomplete and<br />
were delay also in this not stage. substantially In one <strong>of</strong> responsive. the special Even cases<br />
improperly harmonized tender documents and<br />
the examined, qualified the condition bidders made were in called the tender for<br />
ambiguous specifications result in repetition <strong>of</strong><br />
clarification document such on their as shortcomings “the contractors on the contract should<br />
work thus, causing further delay in the<br />
documents possess ownership submitted and <strong>of</strong> 70% this has <strong>of</strong> been the plant observed and<br />
process. <strong>The</strong> bids submitted by the contractors<br />
to equipment” be one <strong>of</strong> created the most controversial significant issues causes and <strong>of</strong><br />
were also not substantially responsive. Even<br />
delay resulted in this in retendering stage. In one causing <strong>of</strong> the special more cases than<br />
the qualified bidders were called for<br />
examined, double the the period condition generally made in followed the tender for<br />
clarification on their shortcomings on the contract<br />
document procurement. such In as Tsunami “the contractors Affected should Areas<br />
documents submitted and this has been observed<br />
possess Rebuilding ownership Projects (TAARP) <strong>of</strong> 70% <strong>of</strong> the the procurement plant and<br />
to be one <strong>of</strong> the most significant causes <strong>of</strong><br />
equipment” process was delayed created by controversial more than 100% issues <strong>of</strong> and the<br />
delay in this stage. In one <strong>of</strong> the special cases<br />
resulted in retendering causing more than<br />
examined, the condition made in the tender<br />
double 3.2.3 Project the implementation period generally stage followed for<br />
document such as “the contractors should<br />
procurement. In Tsunami Affected Areas<br />
possess ownership <strong>of</strong> 70% <strong>of</strong> the plant and<br />
Rebuilding <strong>The</strong> actual Projects construction (TAARP) <strong>of</strong> the the road procurement is carried<br />
equipment” created controversial issues and<br />
process out at was this delayed stage which by more is than susceptible 100% <strong>of</strong> the to<br />
resulted in retendering causing more than<br />
.<br />
double the period generally followed for<br />
3.2.3 Project implementation stage<br />
procurement. In Tsunami Affected Areas<br />
<strong>The</strong><br />
Rebuilding<br />
actual construction<br />
Projects (TAARP)<br />
<strong>of</strong> the<br />
the<br />
road<br />
procurement<br />
is carried<br />
out<br />
process<br />
at this<br />
was delayed<br />
stage which<br />
by more<br />
is<br />
than<br />
susceptible<br />
100% <strong>of</strong> the<br />
to<br />
.<br />
planned duration due to improperly harmonized<br />
3.2.3 tender Project documents. implementation stage<br />
<strong>The</strong> Overall, actual 68% construction <strong>of</strong> the delays <strong>of</strong> were the road caused is carried due to<br />
out the shortcomings at this stage in which the contract is susceptible documents to<br />
. and 32% <strong>of</strong> delays were due to the approvals<br />
<strong>of</strong> authorities such as Cabinet Appointed<br />
Procurement Committee (CAPC) and donor<br />
(see Fig. 2).<br />
ENGINEER 70<br />
Executing the shortcomings Agency (EA). in the It contract took 332 documents days from<br />
planned the and Expression 32% duration <strong>of</strong> delays <strong>of</strong> due Interests were to improperly due (EOIs) to the for harmonized approvals the EA<br />
tender and <strong>of</strong> authorities the documents. selected such firm to as sign Cabinet the contract. Appointed<br />
Procurement Committee (CAPC) and donor<br />
Overall, It (see is generally Fig. 68% 2). <strong>of</strong> accepted the delays by the were design caused engineers due to<br />
the interviewed shortcomings that, in Inadequate the contract and documents incomplete<br />
and<br />
planned duration due to improperly harmonized<br />
investigations 32% <strong>of</strong> delays have were caused due significant to the approvals delays<br />
tender documents.<br />
<strong>of</strong> during authorities the implementation such as Cabinet stage. On Appointed the other<br />
Procurement hand,<br />
Overall,<br />
incomplete Committee<br />
68% <strong>of</strong> the<br />
site<br />
delays<br />
investigations (CAPC) and donor<br />
were caused due<br />
have<br />
to<br />
(see resulted Fig. 2).<br />
the shortcomings<br />
in time consuming<br />
in the contract<br />
activities<br />
documents<br />
like s<strong>of</strong>t<br />
soil<br />
and<br />
treatment<br />
32% <strong>of</strong> delays<br />
later at<br />
were<br />
the execution<br />
due to the<br />
stage.<br />
approvals<br />
<strong>of</strong> authorities such as Cabinet Appointed<br />
At<br />
Procurement<br />
this stage, preparation<br />
Committee<br />
<strong>of</strong><br />
(CAPC)<br />
tender documents<br />
and donor<br />
according<br />
(see Fig. 2).<br />
to the available standards has been a<br />
tedious task. Quantitative information on<br />
delays were available for only seven projects<br />
(P5 – P6, P8 - P12) out <strong>of</strong> the 24 projects<br />
examined. Figure 1 - Design Overall, and the tendering delay caused stage in delay this<br />
stage as a percentage was accounted <strong>of</strong> original from duration the examined<br />
projects (see Fig.1) as 23% on average. <strong>The</strong><br />
research <strong>The</strong> overall revealed results indicate that, that, Incomplete the root cause and<br />
improperly for the above harmonized being tender the incomplete documents and<br />
Figure ambiguous improperly 1 - Design specifications harmonized and tendering result tender in repetition stage documents, delay <strong>of</strong><br />
as work and a percentage inadequate thus, causing <strong>of</strong> capacity original further duration <strong>of</strong> contractors delay in the in<br />
process. preparing <strong>The</strong> bids bids to the submitted required by standards. the contractors<br />
<strong>The</strong> were overall also not results substantially indicate that, responsive. the root cause Even<br />
for the the qualified above bidders being the were incomplete called and for<br />
Figure 1 - Design and tendering stage delay<br />
improperly clarification on harmonized their shortcomings tender on documents, the contract<br />
as a percentage <strong>of</strong> original duration<br />
and documents inadequate submitted capacity and this <strong>of</strong> has contractors been observed in<br />
preparing to be one bids <strong>of</strong> the to the most required significant standards. causes <strong>of</strong><br />
delay <strong>The</strong> overall in this results stage. In indicate one <strong>of</strong> that, the the special root cases cause<br />
examined, for the above the condition being the made incomplete in the tender and<br />
document improperly such harmonized as “the contractors tender documents, should<br />
possess and inadequate ownership capacity <strong>of</strong> 70% <strong>of</strong> <strong>of</strong> the contractors plant and in<br />
equipment” preparing bids created to the controversial required standards. issues and<br />
resulted in retendering causing more than<br />
double Figure 2 the - Average period generally delay percentage followed for<br />
procurement. causes <strong>of</strong> delays In Tsunami – Design Affected and tendering Areas<br />
Rebuilding stage Projects (TAARP) the procurement<br />
process was delayed by more than 100% <strong>of</strong> the<br />
significant delays (see Fig. 3 & Fig. 4). <strong>The</strong><br />
Figure 3.2.3 overall Project delay 2 - implementation Average in this phase delay was stage percentage 69% on average for<br />
causes among the <strong>of</strong> projects delays examined. – Design and tendering<br />
stage <strong>The</strong> actual construction <strong>of</strong> the road is carried<br />
out at this stage which is susceptible to<br />
significant .<br />
delays (see Fig. 3 & Fig. 4). <strong>The</strong><br />
overall Figure delay 2 - in Average this phase delay was 69% percentage on average for<br />
among causes the <strong>of</strong> projects delays examined. – Design and tendering<br />
stage<br />
significant delays (see Fig. 3 & Fig. 4). <strong>The</strong><br />
overall delay in this phase was 69% on average<br />
among the projects examined.<br />
the shortcom<br />
and 32% <strong>of</strong><br />
<strong>of</strong> authoriti<br />
Procuremen<br />
(see Fig. 2).<br />
Figure 1 - D<br />
as a percent<br />
<strong>The</strong> overall<br />
for the ab<br />
improperly<br />
and inadeq<br />
preparing bi<br />
Figure 2 -<br />
causes <strong>of</strong> d<br />
stage<br />
significant d<br />
overall delay<br />
among the p