19.01.2013 Views

Download - The Institution of Engineers, Sri Lanka

Download - The Institution of Engineers, Sri Lanka

Download - The Institution of Engineers, Sri Lanka

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ting<br />

the<br />

ADB<br />

the<br />

from<br />

EA<br />

eers<br />

plete<br />

lays<br />

ther<br />

have<br />

s<strong>of</strong>t<br />

ents<br />

en a<br />

on<br />

Executing Agency (EA). It took 332 days from<br />

because the Expression <strong>of</strong> an <strong>of</strong> intervention Interests (EOIs) by a for competing the EA<br />

bidder, and the selected questioning firm to the sign eligibility the contract. <strong>of</strong> the<br />

competitor. After clarification, the ADB<br />

approved It is generally the accepted ranking by as the proposed design engineers by the<br />

Executing interviewed Agency that, (EA). Inadequate It took and 332 days incomplete from<br />

because <strong>of</strong> an intervention by a competing<br />

the investigations Expression have <strong>of</strong> Interests caused (EOIs) significant for the delays EA<br />

bidder, questioning the eligibility <strong>of</strong> the<br />

and during the the selected implementation firm to sign stage. the contract. On the other<br />

competitor. After clarification, the ADB<br />

hand, incomplete site investigations have<br />

approved the ranking as proposed by the<br />

It resulted is generally in time accepted consuming by the activities design engineers like s<strong>of</strong>t<br />

Executing Agency (EA). It took 332 days from<br />

interviewed soil treatment that, later at Inadequate the execution and stage. incomplete<br />

the Expression <strong>of</strong> Interests (EOIs) for the EA<br />

investigations have caused significant delays<br />

and the selected firm to sign the contract.<br />

during At this the stage, implementation preparation <strong>of</strong> stage. tender On documents the other<br />

hand, according incomplete to the available site investigations standards has been have a<br />

It is generally accepted by the design engineers<br />

resulted tedious in task. time Quantitative consuming activities information like s<strong>of</strong>t on<br />

interviewed that, Inadequate and incomplete<br />

soil delays treatment were available later at the for execution only seven stage. projects<br />

investigations have caused significant delays<br />

(P5 – P6, P8 - P12) out <strong>of</strong> the 24 projects<br />

during the implementation stage. On the other<br />

At examined. this stage, Overall, preparation the delay <strong>of</strong> tender caused documents in this<br />

hand, incomplete site investigations have<br />

according stage was to the accounted available from standards the has examined been a<br />

resulted in time consuming activities like s<strong>of</strong>t<br />

tedious projects (see task. Fig.1) Quantitative as 23% on information average. <strong>The</strong> on<br />

soil treatment later at the execution stage.<br />

delays research were revealed available that, for only Incomplete seven projects and<br />

(P5 improperly – P6, P8 harmonized - P12) out tender <strong>of</strong> the documents 24 projects and<br />

At this stage, preparation <strong>of</strong> tender documents<br />

examined. ambiguous specifications Overall, the result delay in caused repetition in this <strong>of</strong><br />

according to the available standards has been a<br />

stage work was thus, accounted causing further from the delay examined in the<br />

tedious task. Quantitative information on<br />

projects process. <strong>The</strong> (see bids Fig.1) submitted as 23% by on the average. contractors <strong>The</strong><br />

delays were available for only seven projects<br />

research were also revealed not substantially that, responsive. Incomplete Even and<br />

(P5 – P6, P8 - P12) out <strong>of</strong> the 24 projects<br />

improperly the qualified harmonized bidders tender were documents called and for<br />

examined. Overall, the delay caused in this<br />

ambiguous clarification specifications on their shortcomings result in on repetition the contract <strong>of</strong><br />

stage was accounted from the examined<br />

work documents thus, submitted causing and further this has delay been observed in the<br />

projects (see Fig.1) as 23% on average. <strong>The</strong><br />

process. to be one <strong>The</strong> <strong>of</strong> bids the submitted most significant by the contractors causes <strong>of</strong><br />

research revealed that, Incomplete and<br />

were delay also in this not stage. substantially In one <strong>of</strong> responsive. the special Even cases<br />

improperly harmonized tender documents and<br />

the examined, qualified the condition bidders made were in called the tender for<br />

ambiguous specifications result in repetition <strong>of</strong><br />

clarification document such on their as shortcomings “the contractors on the contract should<br />

work thus, causing further delay in the<br />

documents possess ownership submitted and <strong>of</strong> 70% this has <strong>of</strong> been the plant observed and<br />

process. <strong>The</strong> bids submitted by the contractors<br />

to equipment” be one <strong>of</strong> created the most controversial significant issues causes and <strong>of</strong><br />

were also not substantially responsive. Even<br />

delay resulted in this in retendering stage. In one causing <strong>of</strong> the special more cases than<br />

the qualified bidders were called for<br />

examined, double the the period condition generally made in followed the tender for<br />

clarification on their shortcomings on the contract<br />

document procurement. such In as Tsunami “the contractors Affected should Areas<br />

documents submitted and this has been observed<br />

possess Rebuilding ownership Projects (TAARP) <strong>of</strong> 70% <strong>of</strong> the the procurement plant and<br />

to be one <strong>of</strong> the most significant causes <strong>of</strong><br />

equipment” process was delayed created by controversial more than 100% issues <strong>of</strong> and the<br />

delay in this stage. In one <strong>of</strong> the special cases<br />

resulted in retendering causing more than<br />

examined, the condition made in the tender<br />

double 3.2.3 Project the implementation period generally stage followed for<br />

document such as “the contractors should<br />

procurement. In Tsunami Affected Areas<br />

possess ownership <strong>of</strong> 70% <strong>of</strong> the plant and<br />

Rebuilding <strong>The</strong> actual Projects construction (TAARP) <strong>of</strong> the the road procurement is carried<br />

equipment” created controversial issues and<br />

process out at was this delayed stage which by more is than susceptible 100% <strong>of</strong> the to<br />

resulted in retendering causing more than<br />

.<br />

double the period generally followed for<br />

3.2.3 Project implementation stage<br />

procurement. In Tsunami Affected Areas<br />

<strong>The</strong><br />

Rebuilding<br />

actual construction<br />

Projects (TAARP)<br />

<strong>of</strong> the<br />

the<br />

road<br />

procurement<br />

is carried<br />

out<br />

process<br />

at this<br />

was delayed<br />

stage which<br />

by more<br />

is<br />

than<br />

susceptible<br />

100% <strong>of</strong> the<br />

to<br />

.<br />

planned duration due to improperly harmonized<br />

3.2.3 tender Project documents. implementation stage<br />

<strong>The</strong> Overall, actual 68% construction <strong>of</strong> the delays <strong>of</strong> were the road caused is carried due to<br />

out the shortcomings at this stage in which the contract is susceptible documents to<br />

. and 32% <strong>of</strong> delays were due to the approvals<br />

<strong>of</strong> authorities such as Cabinet Appointed<br />

Procurement Committee (CAPC) and donor<br />

(see Fig. 2).<br />

ENGINEER 70<br />

Executing the shortcomings Agency (EA). in the It contract took 332 documents days from<br />

planned the and Expression 32% duration <strong>of</strong> delays <strong>of</strong> due Interests were to improperly due (EOIs) to the for harmonized approvals the EA<br />

tender and <strong>of</strong> authorities the documents. selected such firm to as sign Cabinet the contract. Appointed<br />

Procurement Committee (CAPC) and donor<br />

Overall, It (see is generally Fig. 68% 2). <strong>of</strong> accepted the delays by the were design caused engineers due to<br />

the interviewed shortcomings that, in Inadequate the contract and documents incomplete<br />

and<br />

planned duration due to improperly harmonized<br />

investigations 32% <strong>of</strong> delays have were caused due significant to the approvals delays<br />

tender documents.<br />

<strong>of</strong> during authorities the implementation such as Cabinet stage. On Appointed the other<br />

Procurement hand,<br />

Overall,<br />

incomplete Committee<br />

68% <strong>of</strong> the<br />

site<br />

delays<br />

investigations (CAPC) and donor<br />

were caused due<br />

have<br />

to<br />

(see resulted Fig. 2).<br />

the shortcomings<br />

in time consuming<br />

in the contract<br />

activities<br />

documents<br />

like s<strong>of</strong>t<br />

soil<br />

and<br />

treatment<br />

32% <strong>of</strong> delays<br />

later at<br />

were<br />

the execution<br />

due to the<br />

stage.<br />

approvals<br />

<strong>of</strong> authorities such as Cabinet Appointed<br />

At<br />

Procurement<br />

this stage, preparation<br />

Committee<br />

<strong>of</strong><br />

(CAPC)<br />

tender documents<br />

and donor<br />

according<br />

(see Fig. 2).<br />

to the available standards has been a<br />

tedious task. Quantitative information on<br />

delays were available for only seven projects<br />

(P5 – P6, P8 - P12) out <strong>of</strong> the 24 projects<br />

examined. Figure 1 - Design Overall, and the tendering delay caused stage in delay this<br />

stage as a percentage was accounted <strong>of</strong> original from duration the examined<br />

projects (see Fig.1) as 23% on average. <strong>The</strong><br />

research <strong>The</strong> overall revealed results indicate that, that, Incomplete the root cause and<br />

improperly for the above harmonized being tender the incomplete documents and<br />

Figure ambiguous improperly 1 - Design specifications harmonized and tendering result tender in repetition stage documents, delay <strong>of</strong><br />

as work and a percentage inadequate thus, causing <strong>of</strong> capacity original further duration <strong>of</strong> contractors delay in the in<br />

process. preparing <strong>The</strong> bids bids to the submitted required by standards. the contractors<br />

<strong>The</strong> were overall also not results substantially indicate that, responsive. the root cause Even<br />

for the the qualified above bidders being the were incomplete called and for<br />

Figure 1 - Design and tendering stage delay<br />

improperly clarification on harmonized their shortcomings tender on documents, the contract<br />

as a percentage <strong>of</strong> original duration<br />

and documents inadequate submitted capacity and this <strong>of</strong> has contractors been observed in<br />

preparing to be one bids <strong>of</strong> the to the most required significant standards. causes <strong>of</strong><br />

delay <strong>The</strong> overall in this results stage. In indicate one <strong>of</strong> that, the the special root cases cause<br />

examined, for the above the condition being the made incomplete in the tender and<br />

document improperly such harmonized as “the contractors tender documents, should<br />

possess and inadequate ownership capacity <strong>of</strong> 70% <strong>of</strong> <strong>of</strong> the contractors plant and in<br />

equipment” preparing bids created to the controversial required standards. issues and<br />

resulted in retendering causing more than<br />

double Figure 2 the - Average period generally delay percentage followed for<br />

procurement. causes <strong>of</strong> delays In Tsunami – Design Affected and tendering Areas<br />

Rebuilding stage Projects (TAARP) the procurement<br />

process was delayed by more than 100% <strong>of</strong> the<br />

significant delays (see Fig. 3 & Fig. 4). <strong>The</strong><br />

Figure 3.2.3 overall Project delay 2 - implementation Average in this phase delay was stage percentage 69% on average for<br />

causes among the <strong>of</strong> projects delays examined. – Design and tendering<br />

stage <strong>The</strong> actual construction <strong>of</strong> the road is carried<br />

out at this stage which is susceptible to<br />

significant .<br />

delays (see Fig. 3 & Fig. 4). <strong>The</strong><br />

overall Figure delay 2 - in Average this phase delay was 69% percentage on average for<br />

among causes the <strong>of</strong> projects delays examined. – Design and tendering<br />

stage<br />

significant delays (see Fig. 3 & Fig. 4). <strong>The</strong><br />

overall delay in this phase was 69% on average<br />

among the projects examined.<br />

the shortcom<br />

and 32% <strong>of</strong><br />

<strong>of</strong> authoriti<br />

Procuremen<br />

(see Fig. 2).<br />

Figure 1 - D<br />

as a percent<br />

<strong>The</strong> overall<br />

for the ab<br />

improperly<br />

and inadeq<br />

preparing bi<br />

Figure 2 -<br />

causes <strong>of</strong> d<br />

stage<br />

significant d<br />

overall delay<br />

among the p