BUCKET WHEEL EXCAVATOR KWK-910 - SKW
BUCKET WHEEL EXCAVATOR KWK-910 - SKW
BUCKET WHEEL EXCAVATOR KWK-910 - SKW
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
GENESIS<br />
Deposit exploitation conditions<br />
- the basis for the project assumptions<br />
for <strong>KWK</strong>-<strong>910</strong> excavator.<br />
After many years of exploitation, Turoszów deposits are<br />
still evaluated to possess almost 500 mln tons of industrial<br />
resources of lignite but their further exploitation will be largely<br />
hindered by deteriorating geological and mining conditions.<br />
The deposits of the first lignite deck and overlay to be exploited<br />
are characterized by a highly complicated and irregular<br />
geological struc ture (irregular depositing, faults,<br />
multidirectional sloping, fractures and discontinuities) as well as<br />
highly differentiated digging characteristics (from considerably<br />
easily diggable to hard diggable layers, stone insertions and<br />
interlayers of cohesive rocks). The excavators currently operated<br />
in Turów opencast mine are not adapted to the efficient<br />
exploitation in such differentiated deposits, which results in<br />
their high mortality and, as a consequence, low actual capacity<br />
as compared to their theoretical parameters. The mentioned<br />
exploitation conditions of hard diggable formations in the<br />
overlay of the first lignite deck made it necessary to design an<br />
excavator:<br />
�with resistance suitable for the required digging<br />
parameters at the required capacity and with machine elements<br />
and the bearing structure durable enough,<br />
�with technological parameters such as the range of<br />
lowering and slewing of the extension arms, manoeuvrability,<br />
traction parameters, foundation pressure, etc. which ensure its<br />
proper functionality on highly complicated, short and sloppy<br />
exploitation frontlines.<br />
The above mentioned requirements were specified in<br />
details in the project assumptions for the “Contract of the main<br />
contractor of a single-unit wheel excavator of <strong>KWK</strong>-<strong>910</strong> type for<br />
the exploitation of hard diggable formations” signed on<br />
21.11.2003 by and between the Management Board of BOT<br />
KWB Turów S.A. and <strong>SKW</strong> Biuro Projektowo-Techniczne<br />
Sapkowski, Kanczewski, Wocka sp.j. in Zgorzelec.<br />
That was the decision to construct the first in Poland<br />
excavator for the exploitation of hard diggable formations; an<br />
excavator designed especially for deposit conditions of BOT<br />
KWB Turów S.A.