24.01.2013 Views

DNIT forFurnishing of squash court at CDLU Sirsa - Chaudhary Devi ...

DNIT forFurnishing of squash court at CDLU Sirsa - Chaudhary Devi ...

DNIT forFurnishing of squash court at CDLU Sirsa - Chaudhary Devi ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

exigencies <strong>of</strong> the work and stage <strong>of</strong> the works.<br />

43. Contractor/ bidder is advised to read carefully all chapters and give complete<br />

inform<strong>at</strong>ion regarding his proposals, substanti<strong>at</strong>ing the same with calcul<strong>at</strong>ions,<br />

drawings liter<strong>at</strong>ure, with clear reference to any standards adopted (which are not<br />

mentioned in the tender), in such manner th<strong>at</strong> there is no ambiguity or nothing is<br />

left to chance. All relevant inform<strong>at</strong>ion, so as to make the proposal understandable<br />

shall be given. Vague remarks and remarks like “will be given l<strong>at</strong>er” are not<br />

acceptable. If in the opinion <strong>of</strong> the Engineer-in-charge, the proposal is grossly<br />

incomplete, this will form sufficient reason for complete rejection <strong>of</strong> the tender on<br />

technical grounds.<br />

44. Contractor/ bidder shall note th<strong>at</strong> this is a Percentage/Item r<strong>at</strong>e tender. The<br />

Contractor shall give r<strong>at</strong>e as per volume - II for evalu<strong>at</strong>ion <strong>of</strong> tender and to<br />

facilit<strong>at</strong>e schedule <strong>of</strong> payments. However, his proposal is subject to scrutiny and<br />

approval. He shall therefore take utmost precaution to <strong>of</strong>fer very standard<br />

Equipment manufactured by only reputed manufacturers (wherever the makes are<br />

specified in the <strong>DNIT</strong>, the same shall be <strong>of</strong>fered).<br />

45. The Contractor should note th<strong>at</strong> after the tenders are opened, all modific<strong>at</strong>ions,<br />

corrections, changes shall be carried out entirely to the s<strong>at</strong>isfaction <strong>of</strong> the<br />

Engineer-in-Charge <strong>at</strong> no extra cost to <strong>CDLU</strong>, <strong>Sirsa</strong>. The Contractor/ bidder shall<br />

not be allowed to change the price quoted on his own.<br />

46. All the equipment/machinery supplied shall be guaranteed for Six (6) months<br />

after the commissioning <strong>of</strong> work. All defects shall be rectified to the entire<br />

s<strong>at</strong>isfaction <strong>of</strong> the Engineer-in-charge. Damaged or non-working parts shall be<br />

replaced <strong>at</strong> no extra cost to <strong>CDLU</strong>, <strong>Sirsa</strong>. Defect liability shall be for a period <strong>of</strong><br />

minimum 1 year after the completion <strong>of</strong> work i.e. from the d<strong>at</strong>e <strong>of</strong> final checking<br />

testing and commissioning <strong>of</strong> the complete work.<br />

47. Electric Connection or gener<strong>at</strong>or set required for the execution <strong>of</strong> work shall be<br />

arranged by the Contractor/ bidder <strong>at</strong> his own expenses.<br />

48. No claim shall be entertained if the work has to be curtailed/stopped due to any<br />

unavoidable circumstances.<br />

49. The tender should accompany the partnership deed or registr<strong>at</strong>ion certific<strong>at</strong>e <strong>of</strong><br />

the firm or company as the case may be.<br />

50. Details <strong>of</strong> estim<strong>at</strong>e as per schedule <strong>at</strong>tached from page 69 to 71<br />

Total estim<strong>at</strong>ed Cost Rs. 4.67 lac<br />

10 Contractor

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!