27. The “contract sum” means the sum identified in the contract for the completion <strong>of</strong><br />

works as per contract.<br />

28. “Contractor/ bidder’s equipment” means all appliances or machinery <strong>of</strong> wh<strong>at</strong>soever<br />

n<strong>at</strong>ure m<strong>at</strong>erials or other things intended to form or forming part <strong>of</strong> the works.<br />

29. “Portion <strong>of</strong> the work” means a part <strong>of</strong> the work or section <strong>of</strong> the work.<br />

30. “Specific<strong>at</strong>ions” and “particular specific<strong>at</strong>ions” means the regul<strong>at</strong>ing guidelines<br />

contained in the Haryana PWD specific<strong>at</strong>ions, Manual <strong>of</strong> Sewerage and Sewage<br />

Tre<strong>at</strong>ment, Manual on W<strong>at</strong>er Supply and Tre<strong>at</strong>ment published by the Central Public<br />

Health and Environmental Engineering Organiz<strong>at</strong>ion (CPHEEO) under the Ministry<br />

<strong>of</strong> Works and Housing, Indian Standard specific<strong>at</strong>ions and codes, all <strong>of</strong> l<strong>at</strong>est<br />

editions and those contained in the tender documents and also those based on good<br />

engineering practices.<br />

31. “Time for completion” means the time as stipul<strong>at</strong>ed for completion <strong>of</strong> the works or<br />

any section or portion there-<strong>of</strong> as st<strong>at</strong>ed in the contract or as extended under clause<br />

and shall be calcul<strong>at</strong>ed from the d<strong>at</strong>e specified in the contract. It will be the d<strong>at</strong>e<br />

when the contract enters into force for fulfillment <strong>of</strong> any oblig<strong>at</strong>ion as per necessary<br />

legal, financial or administr<strong>at</strong>ive requirements.<br />

32. “Defect liability period” i.e. minimum 12 months means the period after actual<br />

completion <strong>of</strong> work as mentioned in clause 7 <strong>of</strong> Chapter ‘A’ during which the<br />

Contractor/ bidder will carry the full liability to make good to the complete<br />

s<strong>at</strong>isfaction <strong>of</strong> the Engineer-in-Charge, any defects in the completed work or any<br />

bad work.<br />

33. “Cost” means the amount which shall be deemed to include all overhead costs<br />

whether incurred on or <strong>of</strong>f the site, all taxes, excise duties, royalties etc. as<br />

applicable on the m<strong>at</strong>erials, labour or any other item which is required to complete<br />

the works.<br />

34. “Temporary Works” mean temporary works <strong>of</strong> every kind required in or about the<br />

execution <strong>of</strong> works.<br />

35. “Permanent Works” mean the permanent works to be executed and maintained in<br />

accordance with the Contract.<br />

36. “Construction / Working Drawing <strong>of</strong> a particular component / item / equipment <strong>of</strong><br />

the means the detailed engineering drawing <strong>of</strong> th<strong>at</strong> item submitted by the<br />

Contractor/ bidder and approved by the Engineer-in-charge, <strong>CDLU</strong>, SIRSA, prior to<br />

construction / fabric<strong>at</strong>ion / erection <strong>of</strong> th<strong>at</strong> component, and based on which the same<br />

shall be carried out.<br />

37. “As-built Drawing <strong>of</strong> a particular component / item / equipment means the<br />

engineering drawing submitted by the Contractor/ bidder prior to commissioning,<br />

showing the actual details on which the construction / fabric<strong>at</strong>ion / erection <strong>of</strong> th<strong>at</strong><br />

particular item has been carried out.<br />

20 Contractor