Water, Land and People - Goulburn Broken Catchment ...
Water, Land and People - Goulburn Broken Catchment ...
Water, Land and People - Goulburn Broken Catchment ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
August 2008 <strong>Water</strong>table map<br />
Given the challenging circumstances, the Groundwater<br />
<strong>and</strong> Salt Management Program has been able to continue<br />
to implement planned works <strong>and</strong> adapt its programs to<br />
meet the requirements of key stakeholders.<br />
Activities <strong>and</strong> achievements<br />
High Value Environmental Features Project<br />
Drilling <strong>and</strong> soil testing was completed to establish a trial<br />
pump site at the Millewa Nature Conservation Reserve.<br />
Public Groundwater Pumps<br />
Due to the continuation of drought conditions, the<br />
public salinity control groundwater pumping program<br />
concentrated on consolidating outst<strong>and</strong>ing works with<br />
no new works initiated. This approach saw one previously<br />
constructed pump h<strong>and</strong>ed over in 2008-2009 (CG 24)<br />
but was not rated for area served. The total of 48 public<br />
salinity control groundwater pumps are protecting<br />
more than 9,800ha. Two feasibility investigations were<br />
completed but will not progress to a new pump site.<br />
Private Groundwater Pumps<br />
Dem<strong>and</strong> for the Private Groundwater Pumping Program<br />
in both the Farm Exploratory Drilling Scheme <strong>and</strong><br />
Capital Grants programs was steady in 2008-2009. The<br />
Pasture Farm Exploratory Drilling Scheme completed<br />
43 investigations with one being declared successful <strong>and</strong><br />
another 10 identified as having potential to be public<br />
pump sites. There were three investigations still in<br />
progress <strong>and</strong> 11 properties on the high priority waiting<br />
list.<br />
There was no dem<strong>and</strong> for horticulture Farm Exploratory<br />
Drilling Scheme investigations.<br />
Capital Grants for Sub-surface Drainage<br />
Four new groundwater pumps were installed along<br />
with six being upgraded under the pasture private<br />
groundwater pumping program which are estimated to<br />
protect an additional 1020ha. This brings the cumulative<br />
total of pumps to 370 which includes 297 new pumps<br />
<strong>and</strong> 73 existing pumps upgraded. The overall Plan targets<br />
ACTIVITIES AND ACHIEVEMENTS<br />
27