August 2008 <strong>Water</strong>table map<br />

Given the challenging circumstances, the Groundwater<br />

<strong>and</strong> Salt Management Program has been able to continue<br />

to implement planned works <strong>and</strong> adapt its programs to<br />

meet the requirements of key stakeholders.<br />

Activities <strong>and</strong> achievements<br />

High Value Environmental Features Project<br />

Drilling <strong>and</strong> soil testing was completed to establish a trial<br />

pump site at the Millewa Nature Conservation Reserve.<br />

Public Groundwater Pumps<br />

Due to the continuation of drought conditions, the<br />

public salinity control groundwater pumping program<br />

concentrated on consolidating outst<strong>and</strong>ing works with<br />

no new works initiated. This approach saw one previously<br />

constructed pump h<strong>and</strong>ed over in 2008-2009 (CG 24)<br />

but was not rated for area served. The total of 48 public<br />

salinity control groundwater pumps are protecting<br />

more than 9,800ha. Two feasibility investigations were<br />

completed but will not progress to a new pump site.<br />

Private Groundwater Pumps<br />

Dem<strong>and</strong> for the Private Groundwater Pumping Program<br />

in both the Farm Exploratory Drilling Scheme <strong>and</strong><br />

Capital Grants programs was steady in 2008-2009. The<br />

Pasture Farm Exploratory Drilling Scheme completed<br />

43 investigations with one being declared successful <strong>and</strong><br />

another 10 identified as having potential to be public<br />

pump sites. There were three investigations still in<br />

progress <strong>and</strong> 11 properties on the high priority waiting<br />

list.<br />

There was no dem<strong>and</strong> for horticulture Farm Exploratory<br />

Drilling Scheme investigations.<br />

Capital Grants for Sub-surface Drainage<br />

Four new groundwater pumps were installed along<br />

with six being upgraded under the pasture private<br />

groundwater pumping program which are estimated to<br />

protect an additional 1020ha. This brings the cumulative<br />

total of pumps to 370 which includes 297 new pumps<br />

<strong>and</strong> 73 existing pumps upgraded. The overall Plan targets<br />