Work Pass Divisi<strong>on</strong><br />

18 Havelock Road<br />

Singapore 059764<br />

Tel: 6438 5122<br />

http://www.mom.gov.sg<br />

mom_wpd@mom.gov.sg<br />

Please read the <str<strong>on</strong>g>Guidelines</str<strong>on</strong>g> <strong>on</strong> <strong>Prior</strong> <strong>Approval</strong> Applicati<strong>on</strong>.<br />

1. <strong>Prior</strong> <strong>Approval</strong> Applicati<strong>on</strong> Forms (Page 2 to 5) and the supporting documents should be sent by post to:<br />

� C<strong>on</strong>structi<strong>on</strong> Permit Secti<strong>on</strong>, Work Pass Divisi<strong>on</strong>, <strong>Ministry</strong> <strong>of</strong> <strong>Manpower</strong>, 18 Havelock Road,<br />

Singapore 059764<br />

Please note that incomplete applicati<strong>on</strong> form and insufficient supporting documents will be rejected.<br />

2. The applicant company must submit the following duly completed forms in its <strong>Prior</strong> <strong>Approval</strong> (<strong>PA</strong>)<br />

applicati<strong>on</strong>:<br />

Form 1A & 1B: to be completed by the applicant company<br />

Form 1C: to be completed by the main c<strong>on</strong>tractor if applicant company is a sub-c<strong>on</strong>tractor.<br />

The processing time for the <strong>PA</strong> applicati<strong>on</strong> is 14 working days after we received it with all the documents in order.<br />

The outcome <strong>of</strong> the applicati<strong>on</strong> will be mailed to the applicant company.<br />

The Work Pass Divisi<strong>on</strong> (WPD) will not accept new <strong>PA</strong> applicati<strong>on</strong> after the completi<strong>on</strong> <strong>of</strong> the projects.<br />

Kindly note that <strong>on</strong>ce a <strong>PA</strong> has been utilised, it will not be returned to the applicant company.<br />

3. In additi<strong>on</strong> to the duly completed applicati<strong>on</strong> forms, the applicant company must submit:<br />

(a) A photocopy <strong>of</strong> the firm’s / partnership’s / company’s latest Accounting and Corporate Regulatory Authority<br />

(ACRA) Instant Informati<strong>on</strong> Pr<strong>of</strong>ile Printout (printed within the last 3 m<strong>on</strong>ths from the date <strong>of</strong> applicati<strong>on</strong>).<br />

C<strong>on</strong>structi<strong>on</strong> activity must be reflected as <strong>on</strong>e <strong>of</strong> the company’s principal activities in the printout<br />

(b) A photocopy <strong>of</strong> the valid Registrati<strong>on</strong> certificate issued by the Building & C<strong>on</strong>structi<strong>on</strong> Authority (BCA) or the<br />

valid SLOTS (Singapore List <strong>of</strong> Trade Subc<strong>on</strong>tractors) Certificate issued by the Singapore C<strong>on</strong>tractors<br />

Associati<strong>on</strong> Limited (SCAL) when applying for <strong>PA</strong> for NTS workers. Kindly note that under the BCA’s C<strong>on</strong>tractor<br />

Registrati<strong>on</strong> System, the Supply workheads (SY) are not acceptable for <strong>PA</strong> applicati<strong>on</strong>.<br />

4. Please note that Form 1B and 1C must be signed <strong>on</strong>ly by the director / partner / sole proprietor <strong>of</strong> the company /<br />

Business as registered with ACRA. If a managerial employee is authorised by the director to endorse and sign <strong>on</strong> Form<br />

1B or Form 1C, the said director must submit an original authorisati<strong>on</strong> letter with a specimen <strong>of</strong> the authorised pers<strong>on</strong>’s<br />

signature to c<strong>on</strong>firm the arrangement.<br />

5. The applicant’s company must be ready to produce the following for this Divisi<strong>on</strong>’s verificati<strong>on</strong> when required:<br />

(a) A photocopy <strong>of</strong> the valid Man-Year Entitlement (MYE) Certificate<br />

(b) A photocopy <strong>of</strong> the last 3 m<strong>on</strong>thly CPF C<strong>on</strong>tributi<strong>on</strong> Statements i.e. Form 90 (e.g. A <strong>PA</strong> applicati<strong>on</strong> submitted in<br />

December 2011 must be accompanied by CPF C<strong>on</strong>tributi<strong>on</strong> Statements for the m<strong>on</strong>ths <strong>of</strong> August, September,<br />

October 2011)<br />

(c) A photocopy <strong>of</strong> the applicant’s company’s declarant NRIC or a photocopy <strong>of</strong> his/her Passport and Embarkati<strong>on</strong> /<br />

Disembarkati<strong>on</strong> card if the declarant is a n<strong>on</strong>-Singapore Citizen<br />

(d) A photocopy <strong>of</strong> its direct c<strong>on</strong>tract or its preceding sub-c<strong>on</strong>tractors’ c<strong>on</strong>tracts/ documents for this Department’s<br />

verificati<strong>on</strong> when required.<br />

6. Please note that the applicant company must have a valid CPF account solely for C<strong>on</strong>structi<strong>on</strong> Work Permit<br />

applicati<strong>on</strong>.<br />

7. Should the supporting c<strong>on</strong>tract awarded to the applicant’s company be terminated at any point in time during the<br />

validity period <strong>of</strong> the <strong>Prior</strong> <strong>Approval</strong>, the main c<strong>on</strong>tractor must notify the WPD, in writing, to withdraw the <strong>Prior</strong><br />

<strong>Approval</strong> immediately.<br />

WPCP 101<br />

<str<strong>on</strong>g>Guidelines</str<strong>on</strong>g> <strong>on</strong> <strong>Prior</strong> <strong>Approval</strong> (<strong>PA</strong>) Applicati<strong>on</strong> to<br />

recruit Foreign Workers (C<strong>on</strong>structi<strong>on</strong>)


Work Pass Divisi<strong>on</strong><br />

18 Havelock Road<br />

Singapore 059764<br />

Tel: 6438 5122<br />

http://www.mom.gov.sg<br />

mom_wpd@mom.gov.sg<br />

WPCP 101<br />

<strong>Prior</strong> <strong>Approval</strong> (<strong>PA</strong>) Applicati<strong>on</strong> to recruit<br />

Foreign Workers (C<strong>on</strong>structi<strong>on</strong>)<br />

This form may take you 15 minutes to fill in. You will need the following informati<strong>on</strong> to fill in the form:<br />

� The company’s CPF Submissi<strong>on</strong> No. and Registrati<strong>on</strong> No. (ACRA) � The MYE certificate number<br />

� The expiry date for SLOTS and BCA certificate � The details <strong>of</strong> the project / c<strong>on</strong>tract<br />

Note: Please refer to the guide <strong>on</strong> page 1 before completing Form 1A, 1B and 1C.<br />

Form 1A<br />

Part 1 – Applicant Company’s Particulars (applicant company must complete Form 1A and 1B)<br />

Company’s CPF Submissi<strong>on</strong> No.:<br />

Company’s Registrati<strong>on</strong> No. (ACRA):<br />

Company’s name:<br />

Company’s address:<br />

SLOTS registered c<strong>on</strong>tractor: Yes No Expiry Date:<br />

BCA registered c<strong>on</strong>tractor:<br />

BCA Builder Licence<br />

Yes, please indicate highest Grade No: __________ No<br />

Yes No<br />

Date <strong>of</strong> BCA c<strong>on</strong>tractor’s Registrati<strong>on</strong> Certificate expiry:<br />

Teleph<strong>on</strong>e: Fax:<br />

Part 2 – Sub-c<strong>on</strong>tract Details (Only to be completed if the applicant is a Sub-c<strong>on</strong>tractor <strong>of</strong> the project)<br />

Name <strong>of</strong> the company awarding c<strong>on</strong>tract to applicant company:<br />

*Project Durati<strong>on</strong>: From to<br />

*Project Value S$:<br />

*to follow the durati<strong>on</strong> and value stated in the sub-c<strong>on</strong>tract<br />

Part 3 – Type <strong>of</strong> <strong>Prior</strong> <strong>Approval</strong> Applying For<br />

Please submit separate <strong>PA</strong> applicati<strong>on</strong>s for N<strong>on</strong>-Traditi<strong>on</strong>al Source (NTS) and People’s Republic <strong>of</strong> China (PRC)<br />

workers respectively.<br />

Man-Year Certificate No:<br />

Source <strong>of</strong> Workers (please tick):<br />

NTS (Bangladesh, India, Thailand, The Republic <strong>of</strong> the Uni<strong>on</strong> <strong>of</strong><br />

Myanmar, Philippines or Sri Lanka)<br />

PRC<br />

2


Please √ the appropriate box.<br />

One-Year Work Permit<br />

WPCP 101<br />

No <strong>of</strong> New workers: __________________________(a)<br />

No <strong>of</strong> Renewal workers: __________________________(b)<br />

No <strong>of</strong> Transfer workers: __________________________(c)<br />

Two-Year Work Permit<br />

No <strong>of</strong> New workers: __________________________(d)<br />

No <strong>of</strong> Renewal workers: __________________________(e)<br />

No <strong>of</strong> Transfer workers: __________________________(f)<br />

[No <strong>of</strong> Man-Years __________(g)<br />

for <strong>on</strong>e-year Work Permit]<br />

(g) = (a + b + c) x 1 year<br />

[No <strong>of</strong> Man-Years __________(h)<br />

for two-year Work Permit]<br />

(h) = (d + e + f) x 2 years<br />

Total No <strong>of</strong> Man-Years to be deducted from the Main C<strong>on</strong>tractor _______________ = (g + h)<br />

For Official Use:-<br />

Form 1A – <strong>Prior</strong> <strong>Approval</strong> (<strong>PA</strong>) Applicati<strong>on</strong> to recruit Foreign Workers (C<strong>on</strong>structi<strong>on</strong>)<br />

3


Part 4 – Declarati<strong>on</strong> by Applicant Company<br />

WPCP 101<br />

Form 1B - to be completed by Applicant Company<br />

1) I, ________________________________, in my capacity as ____________________________________<br />

(Name <strong>of</strong> Pers<strong>on</strong> making Declarati<strong>on</strong>) (Designati<strong>on</strong> in Company)<br />

<strong>of</strong> _________________________________________________________, hereby declare that my project as a<br />

(Name <strong>of</strong> Applicant Company)<br />

main c<strong>on</strong>tractor / sub-c<strong>on</strong>tractor with sub-c<strong>on</strong>tract details stated in Part 2 <strong>of</strong> Form 1A is <strong>on</strong>-going and has not<br />

been terminated by the owner / developer or any third party c<strong>on</strong>cerned.<br />

2) I declare that the above <strong>Prior</strong> <strong>Approval</strong> applicati<strong>on</strong> (in Form 1A) made by my company is meant for the<br />

recruitment <strong>of</strong> Foreign Workers for the purpose <strong>of</strong> the menti<strong>on</strong>ed project / sub-c<strong>on</strong>tract. My company is engaged<br />

in the c<strong>on</strong>structi<strong>on</strong> works, and we will comply with all the Work Permit c<strong>on</strong>diti<strong>on</strong>s and the provisi<strong>on</strong>s <strong>of</strong> the<br />

Employment Act. I also hereby undertake to comply with the requirements under the SEC Scheme for new<br />

NTS/PRC workers. I understand that failure to comply with the c<strong>on</strong>diti<strong>on</strong>s, provisi<strong>on</strong>s and requirements will affect<br />

my company’s present and future Work Permit applicati<strong>on</strong>s. The C<strong>on</strong>troller <strong>of</strong> Work Passes also reserves the<br />

right to revoke Work Permits issued if the Work Permit c<strong>on</strong>diti<strong>on</strong>s are not complied with or the documents<br />

submitted in supporting the applicati<strong>on</strong>s are not valid.<br />

3) I further declare that my company is engaged in <strong>on</strong>e or more <strong>of</strong> the c<strong>on</strong>structi<strong>on</strong> activities listed in Annex A<br />

<strong>of</strong> this document and all the NTS/PRC c<strong>on</strong>structi<strong>on</strong> workers employed by us shall be engaged solely in these<br />

c<strong>on</strong>structi<strong>on</strong> activities and at our c<strong>on</strong>structi<strong>on</strong> sites.<br />

Name <strong>of</strong> declarant:<br />

NRIC/Foreign Identificati<strong>on</strong> Number (FIN) <strong>of</strong> declarant:<br />

Signature <strong>of</strong> declarant:<br />

Date <strong>of</strong> endorsement:<br />

Applicant’s company’s stamp:<br />

This document is to be signed by the Director / Partner / Sole Proprietor <strong>of</strong> the Company / Business as<br />

registered with the Accounting and Corporate Regulatory Authority (ACRA). The date <strong>of</strong> all signatures<br />

in the applicati<strong>on</strong> form must not be more than <strong>on</strong>e m<strong>on</strong>th from the time <strong>of</strong> submissi<strong>on</strong>. Applicati<strong>on</strong><br />

without the date <strong>of</strong> endorsement will be rejected.<br />

4


WPCP 101<br />

Form 1C – to be completed by the Main C<strong>on</strong>tractor<br />

Part 5 – For Applicant Company which is not the Main C<strong>on</strong>tractor<br />

Declarati<strong>on</strong> is to be given by the main c<strong>on</strong>tractor providing the Man-Year Entitlement.<br />

Name <strong>of</strong> main c<strong>on</strong>tractor:<br />

Address <strong>of</strong> main c<strong>on</strong>tractor:<br />

CPF Submissi<strong>on</strong> No. Teleph<strong>on</strong>e: Fax:<br />

C<strong>on</strong>firmati<strong>on</strong> <strong>of</strong> Support and Declarati<strong>on</strong> by Main C<strong>on</strong>tractor<br />

1) I, _________________________________, in my capacity as _____________________________________<br />

(Name <strong>of</strong> Pers<strong>on</strong> making Declarati<strong>on</strong>) (Designati<strong>on</strong> in Company)<br />

<strong>of</strong> _____________________________________________________________________hereby declare that my<br />

(Name <strong>of</strong> Main C<strong>on</strong>tractor)<br />

company is the main c<strong>on</strong>tractor <strong>of</strong> this project and supports the applicati<strong>on</strong> for the <strong>Prior</strong> <strong>Approval</strong> submitted by<br />

___________________________________________________________________, whom has been awarded a<br />

(Name <strong>of</strong> Sub-c<strong>on</strong>tractor/ Applicant’s Company)<br />

c<strong>on</strong>tract by_______________________________________________________________ to work <strong>on</strong> the project<br />

(Name <strong>of</strong> Company awarding c<strong>on</strong>tract to Sub-c<strong>on</strong>tractor/ Applicant’s Company)<br />

stated in Part 2 <strong>of</strong> Form 1A, and the latter is a b<strong>on</strong>a fide Sub-c<strong>on</strong>tractor for the project. My company understands<br />

that with this support, the sub-c<strong>on</strong>tractor / the applicant company will be given _________________ number<br />

( a + b + c ) <strong>of</strong> Foreign Workers <strong>on</strong> <strong>on</strong>e-year Work Permit, _________ number ( d + e + f ) <strong>of</strong> Foreign Workers <strong>on</strong><br />

two-year Work Permit, AND ___________ number ( g + h ) <strong>of</strong> Man-Years will be deducted from my company’s<br />

Man-Year Entitlement Certificate number ____________________ if the applicati<strong>on</strong> is successful.<br />

2) The sub-c<strong>on</strong>tractor / applicant company is truly engaged in the c<strong>on</strong>structi<strong>on</strong> works <strong>of</strong> this project. My<br />

company undertakes to be jointly resp<strong>on</strong>sible with the sub-c<strong>on</strong>tractor for the Foreign Workers employed by the<br />

sub-c<strong>on</strong>tractor under this <strong>Prior</strong> <strong>Approval</strong>, should they be aband<strong>on</strong>ed by the sub-c<strong>on</strong>tractor as a result <strong>of</strong> the subc<strong>on</strong>tractor<br />

defaulting <strong>on</strong> levy payments leading to the cancellati<strong>on</strong> <strong>of</strong> the workers’ Work Permit. Under such<br />

circumstances, my company will undertake to accommodate the aband<strong>on</strong>ed workers and find alternative<br />

employment for the workers as so<strong>on</strong> as possible. I understand that if my company fails to do so without valid<br />

ground or reas<strong>on</strong>able cause, my company could be debarred from employing Foreign Workers for 2 years, or<br />

such period as may be decided by the C<strong>on</strong>troller <strong>of</strong> Work Passes.<br />

Name <strong>of</strong> declarant:<br />

NRIC/Foreign Identificati<strong>on</strong> Number (FIN) <strong>of</strong> declarant:<br />

Signature <strong>of</strong> declarant:<br />

Date <strong>of</strong> endorsement:<br />

Main c<strong>on</strong>tractor’s company’s stamp:<br />

This document is to be signed by Director / Partner / Sole Proprietor <strong>of</strong> the Company/ Business as<br />

registered with ACRA. The date <strong>of</strong> all signatures in the applicati<strong>on</strong> form must not be more than <strong>on</strong>e<br />

m<strong>on</strong>th from the time <strong>of</strong> submissi<strong>on</strong>. Applicati<strong>on</strong> without the date <strong>of</strong> endorsement will be rejected.<br />

The form is updated <strong>on</strong> 07 Feb 2012.<br />

5


WPCP 101<br />

Annex A – List <strong>of</strong> C<strong>on</strong>structi<strong>on</strong> Activities for Employment <strong>of</strong> NTS/PRC<br />

C<strong>on</strong>structi<strong>on</strong> Workers<br />

General Building C<strong>on</strong>structi<strong>on</strong> and Civil Engineering Works<br />

1. General Building Works for the c<strong>on</strong>structi<strong>on</strong> <strong>of</strong> structures, including multi-storey car parks, buildings for parks and<br />

playgrounds and other recreati<strong>on</strong>al works, industrial plants and utility plants. Scope <strong>of</strong> work includes additi<strong>on</strong> and<br />

alterati<strong>on</strong> <strong>of</strong> works <strong>on</strong> buildings involving structural changes and installati<strong>on</strong> <strong>of</strong> ro<strong>of</strong>s, as well as interior and exterior<br />

renovati<strong>on</strong> works (see Appendix 1 for list <strong>of</strong> trades).<br />

2. Civil Engineering Works involving c<strong>on</strong>crete, mas<strong>on</strong>ry and steel in bridges, sewers, culverts, reservoirs, retaining<br />

walls, canals, drainage systems, underground structures, cutting and fitting <strong>of</strong> embankments, river banks, excavati<strong>on</strong><br />

<strong>of</strong> deep trenches, scraping <strong>of</strong> sub-soil, surface drainage works, flexible pavements, rigid pavements or laterite roads,<br />

bus bays, open car parks, bridges, tunnels, viaducts, elevated highways and related works such as kerbs and<br />

footways.<br />

3. Waterpro<strong>of</strong>ing <strong>of</strong> basement, ro<strong>of</strong>s and walls.<br />

4. Erecti<strong>on</strong> <strong>of</strong> perimeter fences and gates.<br />

5. C<strong>on</strong>crete repairs which cover the reinforcement <strong>of</strong> structures and joints through the use <strong>of</strong> cement-sand-mortar mix<br />

or the injecti<strong>on</strong> <strong>of</strong> slurry into the joints and cracks in c<strong>on</strong>crete structures and the applicati<strong>on</strong> <strong>of</strong> spraying <strong>of</strong> cementsand-mortar<br />

<strong>on</strong>to surfaces <strong>of</strong> reinforced c<strong>on</strong>crete works.<br />

6. Repainting and minor n<strong>on</strong>-structural repair <strong>of</strong> buildings and existing structures.<br />

Roadworks<br />

7. Marking and painting <strong>of</strong> roads.<br />

8. Laying <strong>of</strong> asphalt.<br />

9. Laying <strong>of</strong> underground pipes and the subsequent reinstatement <strong>of</strong> roads and other surfaces.<br />

10. Installati<strong>on</strong> <strong>of</strong> underground cables and subsequent reinstatement <strong>of</strong> roads and other surfaces.<br />

Specialised Installati<strong>on</strong> Activities<br />

11. Installati<strong>on</strong> <strong>of</strong> integrated signposting systems for complexes, airports and shopping centres. The setting up <strong>of</strong> signs<br />

al<strong>on</strong>g roads is also included.<br />

12. Installati<strong>on</strong> <strong>of</strong> cold rooms and ventilati<strong>on</strong> systems.<br />

13. Installati<strong>on</strong> <strong>of</strong> microprocessor or computer based c<strong>on</strong>trol systems (e.g. Integrated envir<strong>on</strong>mental c<strong>on</strong>trol, fire and<br />

security computer c<strong>on</strong>trol systems) and industrial process c<strong>on</strong>trol systems.<br />

14. Installati<strong>on</strong> <strong>of</strong> communicati<strong>on</strong>s system (e.g. Intercom and wireless radio) and security systems (e.g. CCTV,<br />

security alarms, car park security c<strong>on</strong>trol and card access system).<br />

15. Installati<strong>on</strong> <strong>of</strong> Central Antenna Televisi<strong>on</strong> (CATV) systems.<br />

16. Installati<strong>on</strong>, testing and commissi<strong>on</strong>ing <strong>of</strong> electrical based systems such as switch gears, transformers and large<br />

generators. Electrical installati<strong>on</strong>s in buildings are also included.<br />

17. Installati<strong>on</strong> <strong>of</strong> fire alarms, preventi<strong>on</strong> and protecti<strong>on</strong> systems.<br />

18. Installati<strong>on</strong> <strong>of</strong> low and high-tensi<strong>on</strong> overhead wires. Installati<strong>on</strong> <strong>of</strong> poles for overhead cable and street lighting.<br />

19. Installati<strong>on</strong> and commissi<strong>on</strong>ing <strong>of</strong> lifts, escalators and travelators.<br />

20. Installati<strong>on</strong> and commissi<strong>on</strong>ing <strong>of</strong> mechanical plant, machinery and systems. Installati<strong>on</strong> <strong>of</strong> power generators<br />

and turbines systems are also included.<br />

21. Installati<strong>on</strong> <strong>of</strong> aluminium, steel, steel alloy and timber structural comp<strong>on</strong>ents, metal scaffolds and curtain wall.<br />

22. Installati<strong>on</strong> <strong>of</strong> water and gas pipes, sanitary works and plumbing fixtures.<br />

6


WPCP 101<br />

Annex A – List <strong>of</strong> C<strong>on</strong>structi<strong>on</strong> Activities for Employment <strong>of</strong> NTS/PRC C<strong>on</strong>structi<strong>on</strong><br />

Workers<br />

23. Installati<strong>on</strong> <strong>of</strong> traffic light systems.<br />

24. Installati<strong>on</strong> <strong>of</strong> all heavy sheet piles, driven precast reinforced and prestressed c<strong>on</strong>crete piles, bored cast-in-<br />

situ piles and timber piles.<br />

Telecommunicati<strong>on</strong> Works<br />

25. Laying <strong>of</strong> underground telecommunicati<strong>on</strong> cables.<br />

26. Laying <strong>of</strong> underground pipes for the purposes <strong>of</strong> telecommunicati<strong>on</strong>s.<br />

27. Wiring work within a building for telecommunicati<strong>on</strong> purposes.<br />

Earthworks & Soil Sampling cum Classificati<strong>on</strong><br />

28. Excavati<strong>on</strong> and earthmoving works.<br />

29. Collecti<strong>on</strong> or removing <strong>of</strong> earth samples for the purpose <strong>of</strong> investigati<strong>on</strong> and testing services to determine soil<br />

classificati<strong>on</strong>, strength and compositi<strong>on</strong>. Soil stabilisati<strong>on</strong> works such as micro piling, ground anchoring, sand drains<br />

and ground grouting are also included.<br />

Landscaping Works<br />

30. Provisi<strong>on</strong> <strong>of</strong> landscaping works excluding grass cutting and nursery work. The landscaping works must form an<br />

integral part <strong>of</strong> an <strong>on</strong>-going Building / Civil Engineering project.<br />

Demoliti<strong>on</strong> Works<br />

31. General demoliti<strong>on</strong> works.<br />

Marine C<strong>on</strong>structi<strong>on</strong> Works<br />

32. Works involving marine piling and the c<strong>on</strong>structi<strong>on</strong> <strong>of</strong> marine structures such as jetties, wharves, sea and river walls.<br />

Dredging/Land Reclamati<strong>on</strong> Works<br />

33. Works involving dredging in canals, rivers and <strong>of</strong>fshore for the purpose <strong>of</strong> deepening. Reclamati<strong>on</strong> works are also<br />

included.<br />

Corrosi<strong>on</strong> Protecti<strong>on</strong> Works<br />

34. Corrosi<strong>on</strong> protecti<strong>on</strong> work <strong>on</strong> metal surfaces and structures. Processes such as cathoic, anodic and electrolytic<br />

protecti<strong>on</strong> are also included.<br />

Fabricati<strong>on</strong> Works<br />

35. Fabricati<strong>on</strong> <strong>of</strong> structural precast c<strong>on</strong>crete products like slab panels, wall panels, column and beams.<br />

36. Fabricati<strong>on</strong> <strong>of</strong> prefabricated steel reinforcement products like beam cages and pile cap cages.<br />

Caveat: Please note the above items, with excepti<strong>on</strong> <strong>of</strong> Fabricati<strong>on</strong> Works (items 35 and 36), are c<strong>on</strong>fined<br />

<strong>on</strong>ly to work carried out <strong>on</strong> project sites for the c<strong>on</strong>structi<strong>on</strong> <strong>of</strong> building structures, upgrading<br />

and civil engineering works as defined in the secti<strong>on</strong> <strong>on</strong> General Building and Civil Engineering<br />

C<strong>on</strong>structi<strong>on</strong> Works. It should however be noted that N<strong>on</strong>-Traditi<strong>on</strong>al Source (NTS) c<strong>on</strong>structi<strong>on</strong><br />

workers are not allowed for routine maintenance works.<br />

7


Appendix 1 - List <strong>of</strong> C<strong>on</strong>structi<strong>on</strong> Activities for Employment <strong>of</strong> NTS/PRC<br />

C<strong>on</strong>structi<strong>on</strong> Workers<br />

C<strong>on</strong>structi<strong>on</strong> Trades under Items 1 and 2 are:<br />

� Brick and block laying and mas<strong>on</strong>ry<br />

� Building electrical installati<strong>on</strong><br />

� Bulldozer operati<strong>on</strong><br />

� Cable TV wiring installati<strong>on</strong><br />

� Ceiling works<br />

� C<strong>on</strong>crete floor finishing<br />

� C<strong>on</strong>creting<br />

� Curtain wall installati<strong>on</strong> / cladding<br />

� Drainlaying<br />

� Drywall installati<strong>on</strong><br />

� Installati<strong>on</strong> work for air-c<strong>on</strong>diti<strong>on</strong>ing<br />

& ventilati<strong>on</strong> and related ducting<br />

� Excavator operati<strong>on</strong><br />

� Formwork (timber, metalform, system form)<br />

� Fire sprinkler installati<strong>on</strong><br />

� Installati<strong>on</strong> <strong>of</strong> awning and window shades<br />

� Installati<strong>on</strong> <strong>of</strong> solar c<strong>on</strong>trol films<br />

� Joinery, carpentry and other woodworks<br />

� Marble laying<br />

� Metal scaffolding (erecti<strong>on</strong> and dismantling)<br />

WPCP 101<br />

The informati<strong>on</strong> is updated <strong>on</strong> 07 Feb 2012.<br />

� Painting works<br />

� Pavement slab & kerb c<strong>on</strong>structi<strong>on</strong><br />

� Piling operati<strong>on</strong><br />

� Plumbing & pipefitting<br />

� Plastering<br />

� Precast c<strong>on</strong>crete comp<strong>on</strong>ent erecti<strong>on</strong><br />

� Precast decorative motif installati<strong>on</strong><br />

� Prestressing works<br />

� Ro<strong>of</strong>ing works<br />

� Railing installati<strong>on</strong><br />

� Raised floor installati<strong>on</strong><br />

� Gritblasting work <strong>on</strong> c<strong>on</strong>structi<strong>on</strong> sites<br />

� Steel reinforcement work<br />

� Structural repair works<br />

� Structural steelwork/steel fitting<br />

� Shovel operati<strong>on</strong><br />

� Telescopic handler operati<strong>on</strong><br />

� Thermal insulati<strong>on</strong><br />

� Tiling<br />

� Waterpro<strong>of</strong>ing<br />

� Welding works<br />

� Window, door, frame and grill installati<strong>on</strong><br />