24.01.2013 Views

Education Service Center, Region 2 - ESC Region 2 Purchasing ...

Education Service Center, Region 2 - ESC Region 2 Purchasing ...

Education Service Center, Region 2 - ESC Region 2 Purchasing ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

A new construction performance contract from Schneider<br />

Electric locks in energy savings and assures execution of the<br />

proper systems design, installation and commissioning from<br />

the outset.<br />

The costs we quote during the design phase will not change<br />

as long as the design intent remains the same – even if we<br />

overlook something. And during the commissioning phase, our<br />

energy engineers make sure all mechanical systems will<br />

operate at peak efficiency from Day One.<br />

Our PASS program (Performance Assurance Support<br />

<strong>Service</strong>s) goes into effect after systems implementation.<br />

PASS provides remote monitoring and technical support along<br />

with a complete analysis and reporting of energy use,<br />

guaranteeing energy savings and project performance after<br />

the initial installation.<br />

Page 25<br />

Use or disclosure of data contained on this sheet is<br />

subject to the restriction on the title page of this proposal<br />

<strong>Education</strong> <strong>Service</strong> <strong>Center</strong>, <strong>Region</strong> 2<br />

Energy Conservation <strong>Service</strong>s Program

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!